Author |
Colin Smythe (IMS Global, UK) |
Date |
5th September 2015 |
Release |
Final Release (Final 1.0) |
Schema Version |
IMS APIP 1.0 QTI 2.2 RESPROC PARCC 1.0 |
Namespace |
http://www.imsglobal.org/xsd/apip/apipv1p0/qtiresproc/imsqti_v2p2 |
Summary |
This document provides a checklist of the PARCC-APIP-ResponseProcess Profile for the data model defined in the IMS Question and Test Interoperability (QTI) 2.2 Specification. |
Recipients of this document are requested to submit, with their comments, notification of any relevant patent claims or other intellectual property rights of which they may be aware that might be infringed by any implementation of the specification set forth in this document, and to provide supporting documentation.
IMS takes no position regarding the validity or scope of any intellectual property or other rights that might be claimed to pertain to the implementation or use of the technology described in this document or the extent to which any license under such rights might or might not be available; neither does it represent that it has made any effort to identify any such rights. Information on IMS's procedures with respect to rights in IMS specifications can be found at the IMS Intellectual Property Rights web page: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf.
Copyright © 2013 IMS Global Learning Consortium. All Rights Reserved.
Use of this specification to develop products or services is governed by the license with IMS found on the IMS website: http://www.imsglobal.org/license.html.
Permission is granted to all parties to use excerpts from this document as needed in producing requests for proposals.
The limited permissions granted above are perpetual and will not be revoked by IMS or its successors or assigns.
THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTER'S OWN RISK, AND NEITHER THE CONSORTIUM, NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION.
In the following tables, three colours are used to denote standard classifications of the rows:
The key to the columns used in the following profile comparison details is:
The key to the colours used in the following profile comparison details is:
This is the "PARCC-APIP-ResponseProcess". THIS IS A PROFILE OF THE BASE SPECIFICATION. The changes to the base specification are:
The set of root attributes defined in the data model.
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
1 | assessmentTest | [1] | AssessmentTest (Sequence) | Prohibited | - |
2 | assessmentSection | [1] | AssessmentSection (Sequence) | Prohibited | - |
3 | assessmentItem | [1] | AssessmentItem (Sequence) | Prohibited | - |
4 | assessmentStimulus | [1] | AssessmentStimulus (Sequence) | Prohibited | - |
5 | responseProcessing | [1] | ResponseProcessing (Sequence) | - | - |
6 | outcomeDeclaration | [1] | OutcomeDeclaration (Sequence) | Prohibited | - |
The set of root classes (the classes for the set of root attributes) defined in the data model.
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Root | AssessmentItem.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Root | AssessmentSection.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Root | AssessmentStimulus.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Root | AssessmentTest.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Root | OutcomeDeclaration.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Root | ResponseProcessing.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
a |
->@template | [0..1] | PT:AnyURI | - | - |
b |
->@templateLocation | [0..1] | PT:AnyURI | - | - |
1 |
-[[ Abstract ]]- | [0..*] | -[[ Selection ]]- | - | In the model this abstract class is named: ResponseRuleGroup |
1.1 |
->xi:include | XOR [1] | Include (Import) | - | Further information in the external schema located at: http://www.imsglobal.org/xsd/w3/2001/XInclude.xsd |
1.2 |
->responseCondition | XOR [1] | ResponseCondition (Sequence) | - | - |
1.3 |
->responseProcessingFragment | XOR [1] | ResponseProcessingFragment (Sequence) | Prohibited | - |
1.4 |
->setOutcomeValue | XOR [1] | SetValue (Sequence) | - | - |
1.5 |
->exitResponse | XOR [1] | PT:Empty | - | This element has no value i.e. it is empty. |
1.6 |
->lookupOutcomeValue | XOR [1] | LookupOutcomeValue (Sequence) | - | - |
The set of classes (excluding the root classes) defined in the data model.
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | A.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | AnyN.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
a |
->@min | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
b |
->@max | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1 |
-[[ Abstract ]]- | [1..*] | -[[ Selection ]]- | - | In the model this abstract class is named: ExpressionGroup |
1.1 |
->and | XOR [1] | Logic1toMany (Sequence) | - | - |
1.2 |
->gt | XOR [1] | LogicPair (Sequence) | - | - |
1.3 |
->not | XOR [1] | LogicSingle (Sequence) | - | - |
1.4 |
->lt | XOR [1] | LogicPair (Sequence) | - | - |
1.5 |
->gte | XOR [1] | LogicPair (Sequence) | - | - |
1.6 |
->lte | XOR [1] | LogicPair (Sequence) | - | - |
1.7 |
->or | XOR [1] | Logic1toMany (Sequence) | - | - |
1.8 |
->sum | XOR [1] | NumericLogic1toMany (Sequence) | - | - |
1.9 |
->durationLT | XOR [1] | LogicPair (Sequence) | - | - |
1.10 |
->durationGTE | XOR [1] | LogicPair (Sequence) | - | - |
1.11 |
->subtract | XOR [1] | LogicPair (Sequence) | - | - |
1.12 |
->divide | XOR [1] | LogicPair (Sequence) | - | - |
1.13 |
->multiple | XOR [1] | Logic0toMany (Sequence) | - | - |
1.14 |
->ordered | XOR [1] | Logic0toMany (Sequence) | - | - |
1.15 |
->customOperator | XOR [1] | CustomOperator (Sequence) | - | - |
1.16 |
->random | XOR [1] | LogicSingle (Sequence) | - | - |
1.17 |
->numberIncorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.17a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.17b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.17c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18 |
->numberCorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.18a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.18b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19 |
->numberPresented | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.19a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.19b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20 |
->numberResponded | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.20a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.20b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21 |
->numberSelected | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.21a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.21b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.22 |
->substring | XOR [1] | Substring (Sequence) | - | - |
1.23 |
->equalRounded | XOR [1] | EqualRounded (Sequence) | - | - |
1.24 |
->null | XOR [1] | PT:Empty | - | This element has no value i.e. it is empty. |
1.25 |
->delete | XOR [1] | LogicPair (Sequence) | - | - |
1.26 |
->match | XOR [1] | LogicPair (Sequence) | - | - |
1.27 |
->index | XOR [1] | Index (Sequence) | - | - |
1.28 |
->power | XOR [1] | LogicPair (Sequence) | - | - |
1.29 |
->equal | XOR [1] | Equal (Sequence) | - | - |
1.30 |
->contains | XOR [1] | LogicPair (Sequence) | - | - |
1.31 |
->containerSize | XOR [1] | LogicSingle (Sequence) | - | - |
1.32 |
->correct | XOR [1] | DT:Correct (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.32a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.33 |
->default | XOR [1] | DT:Default (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.33a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.34 |
->anyN | XOR [1] | AnyN (Sequence) | - | - |
1.35 |
->integerDivide | XOR [1] | LogicPair (Sequence) | - | - |
1.36 |
->integerModulus | XOR [1] | LogicPair (Sequence) | - | - |
1.37 |
->isNull | XOR [1] | LogicSingle (Sequence) | - | - |
1.38 |
->member | XOR [1] | LogicPair (Sequence) | - | - |
1.39 |
->product | XOR [1] | Logic1toMany (Sequence) | - | - |
1.40 |
->round | XOR [1] | LogicSingle (Sequence) | - | - |
1.41 |
->truncate | XOR [1] | LogicSingle (Sequence) | - | - |
1.42 |
->fieldValue | XOR [1] | FieldValue (Sequence) | - | - |
1.43 |
->randomInteger | XOR [1] | DT:RandomInteger (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.43a |
--->@min | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "0". |
1.43b |
--->@max | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1.43c |
--->@step | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "1". |
1.44 |
->randomFloat | XOR [1] | DT:RandomFloat (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.44a |
--->@min | [0..1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. Default value = "0". |
1.44b |
--->@max | [1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. |
1.45 |
->variable | XOR [1] | DT:Variable (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.45a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.45b |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46 |
->outcomeMinimum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.46a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.46e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47 |
->outcomeMaximum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.47a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.47e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48 |
->testVariables | XOR [1] | DT:TestVariables (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.48a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48d |
--->@variableIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.48e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48f |
--->@baseType | [0..1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.49 |
->integerToFloat | XOR [1] | LogicSingle (Sequence) | - | - |
1.50 |
->inside | XOR [1] | Inside (Sequence) | - | - |
1.51 |
->baseValue | XOR [1] | DT:BaseValue (PT:String) | - | - |
1.51a |
--->@baseType | [1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.52 |
->patternMatch | XOR [1] | PatternMatch (Sequence) | - | - |
1.53 |
->mapResponsePoint | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.53a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.54 |
->mapResponse | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.54a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.55 |
->stringMatch | XOR [1] | StringMatch (Sequence) | - | - |
1.56 |
->repeat | XOR [1] | Repeat (Sequence) | - | - |
1.57 |
->roundTo | XOR [1] | RoundTo (Sequence) | - | - |
1.58 |
->lcm | XOR [1] | Logic1toMany (Sequence) | - | - |
1.59 |
->gcd | XOR [1] | Logic1toMany (Sequence) | - | - |
1.60 |
->min | XOR [1] | Logic1toMany (Sequence) | - | - |
1.61 |
->max | XOR [1] | Logic1toMany (Sequence) | - | - |
1.62 |
->mathConstant | XOR [1] | DT:MathConstant (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.62a |
--->@name | [1] | [ Enumeration (MathConstantNames) ] | - | Permitted values are: { pi | e }. |
1.63 |
->statsOperator | XOR [1] | StatsOperator (Sequence) | - | - |
1.64 |
->mathOperator | XOR [1] | MathOperator (Sequence) | - | - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | AreaMapping.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | AssessmentItemRef.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | AssociableHotspot.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | AssociateInteraction.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | BDO.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | BR.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | BasePromptInteraction.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | BaseSequence.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | BaseSequenceFull.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | BaseSequenceRIdent.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | BaseSequenceXBase.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | BlockQuote.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | BranchRule.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Caption.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | ChoiceInteraction.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Col.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | ColGroup.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | CorrectResponse.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | CustomInteraction.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | CustomOperator.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
a |
->@class | [0..1] | DT:Identifier (PT:NCName) | - | - |
b |
->@definition | [0..1] | PT:AnyURI | - | - |
c |
->@extension | [0..*] | PT:NamespaceLax | - | - |
1 |
-[[ Abstract ]]- | [0..*] | -[[ Selection ]]- | - | In the model this abstract class is named: ExpressionGroup |
1.1 |
->and | XOR [1] | Logic1toMany (Sequence) | - | - |
1.2 |
->gt | XOR [1] | LogicPair (Sequence) | - | - |
1.3 |
->not | XOR [1] | LogicSingle (Sequence) | - | - |
1.4 |
->lt | XOR [1] | LogicPair (Sequence) | - | - |
1.5 |
->gte | XOR [1] | LogicPair (Sequence) | - | - |
1.6 |
->lte | XOR [1] | LogicPair (Sequence) | - | - |
1.7 |
->or | XOR [1] | Logic1toMany (Sequence) | - | - |
1.8 |
->sum | XOR [1] | NumericLogic1toMany (Sequence) | - | - |
1.9 |
->durationLT | XOR [1] | LogicPair (Sequence) | - | - |
1.10 |
->durationGTE | XOR [1] | LogicPair (Sequence) | - | - |
1.11 |
->subtract | XOR [1] | LogicPair (Sequence) | - | - |
1.12 |
->divide | XOR [1] | LogicPair (Sequence) | - | - |
1.13 |
->multiple | XOR [1] | Logic0toMany (Sequence) | - | - |
1.14 |
->ordered | XOR [1] | Logic0toMany (Sequence) | - | - |
1.15 |
->customOperator | XOR [1] | CustomOperator (Sequence) | - | - |
1.16 |
->random | XOR [1] | LogicSingle (Sequence) | - | - |
1.17 |
->numberIncorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.17a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.17b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.17c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18 |
->numberCorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.18a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.18b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19 |
->numberPresented | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.19a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.19b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20 |
->numberResponded | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.20a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.20b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21 |
->numberSelected | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.21a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.21b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.22 |
->substring | XOR [1] | Substring (Sequence) | - | - |
1.23 |
->equalRounded | XOR [1] | EqualRounded (Sequence) | - | - |
1.24 |
->null | XOR [1] | PT:Empty | - | This element has no value i.e. it is empty. |
1.25 |
->delete | XOR [1] | LogicPair (Sequence) | - | - |
1.26 |
->match | XOR [1] | LogicPair (Sequence) | - | - |
1.27 |
->index | XOR [1] | Index (Sequence) | - | - |
1.28 |
->power | XOR [1] | LogicPair (Sequence) | - | - |
1.29 |
->equal | XOR [1] | Equal (Sequence) | - | - |
1.30 |
->contains | XOR [1] | LogicPair (Sequence) | - | - |
1.31 |
->containerSize | XOR [1] | LogicSingle (Sequence) | - | - |
1.32 |
->correct | XOR [1] | DT:Correct (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.32a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.33 |
->default | XOR [1] | DT:Default (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.33a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.34 |
->anyN | XOR [1] | AnyN (Sequence) | - | - |
1.35 |
->integerDivide | XOR [1] | LogicPair (Sequence) | - | - |
1.36 |
->integerModulus | XOR [1] | LogicPair (Sequence) | - | - |
1.37 |
->isNull | XOR [1] | LogicSingle (Sequence) | - | - |
1.38 |
->member | XOR [1] | LogicPair (Sequence) | - | - |
1.39 |
->product | XOR [1] | Logic1toMany (Sequence) | - | - |
1.40 |
->round | XOR [1] | LogicSingle (Sequence) | - | - |
1.41 |
->truncate | XOR [1] | LogicSingle (Sequence) | - | - |
1.42 |
->fieldValue | XOR [1] | FieldValue (Sequence) | - | - |
1.43 |
->randomInteger | XOR [1] | DT:RandomInteger (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.43a |
--->@min | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "0". |
1.43b |
--->@max | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1.43c |
--->@step | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "1". |
1.44 |
->randomFloat | XOR [1] | DT:RandomFloat (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.44a |
--->@min | [0..1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. Default value = "0". |
1.44b |
--->@max | [1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. |
1.45 |
->variable | XOR [1] | DT:Variable (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.45a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.45b |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46 |
->outcomeMinimum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.46a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.46e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47 |
->outcomeMaximum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.47a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.47e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48 |
->testVariables | XOR [1] | DT:TestVariables (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.48a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48d |
--->@variableIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.48e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48f |
--->@baseType | [0..1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.49 |
->integerToFloat | XOR [1] | LogicSingle (Sequence) | - | - |
1.50 |
->inside | XOR [1] | Inside (Sequence) | - | - |
1.51 |
->baseValue | XOR [1] | DT:BaseValue (PT:String) | - | - |
1.51a |
--->@baseType | [1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.52 |
->patternMatch | XOR [1] | PatternMatch (Sequence) | - | - |
1.53 |
->mapResponsePoint | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.53a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.54 |
->mapResponse | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.54a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.55 |
->stringMatch | XOR [1] | StringMatch (Sequence) | - | - |
1.56 |
->repeat | XOR [1] | Repeat (Sequence) | - | - |
1.57 |
->roundTo | XOR [1] | RoundTo (Sequence) | - | - |
1.58 |
->lcm | XOR [1] | Logic1toMany (Sequence) | - | - |
1.59 |
->gcd | XOR [1] | Logic1toMany (Sequence) | - | - |
1.60 |
->min | XOR [1] | Logic1toMany (Sequence) | - | - |
1.61 |
->max | XOR [1] | Logic1toMany (Sequence) | - | - |
1.62 |
->mathConstant | XOR [1] | DT:MathConstant (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.62a |
--->@name | [1] | [ Enumeration (MathConstantNames) ] | - | Permitted values are: { pi | e }. |
1.63 |
->statsOperator | XOR [1] | StatsOperator (Sequence) | - | - |
1.64 |
->mathOperator | XOR [1] | MathOperator (Sequence) | - | - |
2 |
->extension | [0..1] | PT:NamespaceLax | - | - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | DD.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | DL.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | DT.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | DefaultValue.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Div.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | DrawingInteraction.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | EndAttemptInteraction.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Equal.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
a |
->@toleranceMode | [0..1] | [ Enumeration (ToleranceMode) ] | - | Permitted values are: { absolute | exact | relative }. Default value = "exact". |
b |
->@tolerance | [0..1] | [ List (ToleranceList) ] | - | The list consist of values of data-type(s): PT:String, PT:Double. |
c |
->@includeLowerBound | [0..1] | PT:Boolean | - | Default value = "true". |
d |
->@includeUpperBound | [0..1] | PT:Boolean | - | Default value = "true". |
1 |
-[[ Abstract ]]- | [ 2 .. 2 ] | -[[ Selection ]]- | - | In the model this abstract class is named: ExpressionGroup |
1.1 |
->and | XOR [1] | Logic1toMany (Sequence) | - | - |
1.2 |
->gt | XOR [1] | LogicPair (Sequence) | - | - |
1.3 |
->not | XOR [1] | LogicSingle (Sequence) | - | - |
1.4 |
->lt | XOR [1] | LogicPair (Sequence) | - | - |
1.5 |
->gte | XOR [1] | LogicPair (Sequence) | - | - |
1.6 |
->lte | XOR [1] | LogicPair (Sequence) | - | - |
1.7 |
->or | XOR [1] | Logic1toMany (Sequence) | - | - |
1.8 |
->sum | XOR [1] | NumericLogic1toMany (Sequence) | - | - |
1.9 |
->durationLT | XOR [1] | LogicPair (Sequence) | - | - |
1.10 |
->durationGTE | XOR [1] | LogicPair (Sequence) | - | - |
1.11 |
->subtract | XOR [1] | LogicPair (Sequence) | - | - |
1.12 |
->divide | XOR [1] | LogicPair (Sequence) | - | - |
1.13 |
->multiple | XOR [1] | Logic0toMany (Sequence) | - | - |
1.14 |
->ordered | XOR [1] | Logic0toMany (Sequence) | - | - |
1.15 |
->customOperator | XOR [1] | CustomOperator (Sequence) | - | - |
1.16 |
->random | XOR [1] | LogicSingle (Sequence) | - | - |
1.17 |
->numberIncorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.17a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.17b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.17c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18 |
->numberCorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.18a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.18b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19 |
->numberPresented | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.19a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.19b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20 |
->numberResponded | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.20a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.20b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21 |
->numberSelected | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.21a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.21b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.22 |
->substring | XOR [1] | Substring (Sequence) | - | - |
1.23 |
->equalRounded | XOR [1] | EqualRounded (Sequence) | - | - |
1.24 |
->null | XOR [1] | PT:Empty | - | This element has no value i.e. it is empty. |
1.25 |
->delete | XOR [1] | LogicPair (Sequence) | - | - |
1.26 |
->match | XOR [1] | LogicPair (Sequence) | - | - |
1.27 |
->index | XOR [1] | Index (Sequence) | - | - |
1.28 |
->power | XOR [1] | LogicPair (Sequence) | - | - |
1.29 |
->equal | XOR [1] | Equal (Sequence) | - | - |
1.30 |
->contains | XOR [1] | LogicPair (Sequence) | - | - |
1.31 |
->containerSize | XOR [1] | LogicSingle (Sequence) | - | - |
1.32 |
->correct | XOR [1] | DT:Correct (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.32a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.33 |
->default | XOR [1] | DT:Default (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.33a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.34 |
->anyN | XOR [1] | AnyN (Sequence) | - | - |
1.35 |
->integerDivide | XOR [1] | LogicPair (Sequence) | - | - |
1.36 |
->integerModulus | XOR [1] | LogicPair (Sequence) | - | - |
1.37 |
->isNull | XOR [1] | LogicSingle (Sequence) | - | - |
1.38 |
->member | XOR [1] | LogicPair (Sequence) | - | - |
1.39 |
->product | XOR [1] | Logic1toMany (Sequence) | - | - |
1.40 |
->round | XOR [1] | LogicSingle (Sequence) | - | - |
1.41 |
->truncate | XOR [1] | LogicSingle (Sequence) | - | - |
1.42 |
->fieldValue | XOR [1] | FieldValue (Sequence) | - | - |
1.43 |
->randomInteger | XOR [1] | DT:RandomInteger (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.43a |
--->@min | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "0". |
1.43b |
--->@max | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1.43c |
--->@step | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "1". |
1.44 |
->randomFloat | XOR [1] | DT:RandomFloat (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.44a |
--->@min | [0..1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. Default value = "0". |
1.44b |
--->@max | [1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. |
1.45 |
->variable | XOR [1] | DT:Variable (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.45a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.45b |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46 |
->outcomeMinimum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.46a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.46e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47 |
->outcomeMaximum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.47a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.47e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48 |
->testVariables | XOR [1] | DT:TestVariables (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.48a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48d |
--->@variableIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.48e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48f |
--->@baseType | [0..1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.49 |
->integerToFloat | XOR [1] | LogicSingle (Sequence) | - | - |
1.50 |
->inside | XOR [1] | Inside (Sequence) | - | - |
1.51 |
->baseValue | XOR [1] | DT:BaseValue (PT:String) | - | - |
1.51a |
--->@baseType | [1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.52 |
->patternMatch | XOR [1] | PatternMatch (Sequence) | - | - |
1.53 |
->mapResponsePoint | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.53a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.54 |
->mapResponse | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.54a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.55 |
->stringMatch | XOR [1] | StringMatch (Sequence) | - | - |
1.56 |
->repeat | XOR [1] | Repeat (Sequence) | - | - |
1.57 |
->roundTo | XOR [1] | RoundTo (Sequence) | - | - |
1.58 |
->lcm | XOR [1] | Logic1toMany (Sequence) | - | - |
1.59 |
->gcd | XOR [1] | Logic1toMany (Sequence) | - | - |
1.60 |
->min | XOR [1] | Logic1toMany (Sequence) | - | - |
1.61 |
->max | XOR [1] | Logic1toMany (Sequence) | - | - |
1.62 |
->mathConstant | XOR [1] | DT:MathConstant (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.62a |
--->@name | [1] | [ Enumeration (MathConstantNames) ] | - | Permitted values are: { pi | e }. |
1.63 |
->statsOperator | XOR [1] | StatsOperator (Sequence) | - | - |
1.64 |
->mathOperator | XOR [1] | MathOperator (Sequence) | - | - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | EqualRounded.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
a |
->@roundingMode | [0..1] | [ Enumeration (RoundingMode) ] | - | Permitted values are: { decimalPlaces | significantFigures }. Default value = "significantFigures". |
b |
->@figures | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1 |
-[[ Abstract ]]- | [ 2 .. 2 ] | -[[ Selection ]]- | - | In the model this abstract class is named: ExpressionGroup |
1.1 |
->and | XOR [1] | Logic1toMany (Sequence) | - | - |
1.2 |
->gt | XOR [1] | LogicPair (Sequence) | - | - |
1.3 |
->not | XOR [1] | LogicSingle (Sequence) | - | - |
1.4 |
->lt | XOR [1] | LogicPair (Sequence) | - | - |
1.5 |
->gte | XOR [1] | LogicPair (Sequence) | - | - |
1.6 |
->lte | XOR [1] | LogicPair (Sequence) | - | - |
1.7 |
->or | XOR [1] | Logic1toMany (Sequence) | - | - |
1.8 |
->sum | XOR [1] | NumericLogic1toMany (Sequence) | - | - |
1.9 |
->durationLT | XOR [1] | LogicPair (Sequence) | - | - |
1.10 |
->durationGTE | XOR [1] | LogicPair (Sequence) | - | - |
1.11 |
->subtract | XOR [1] | LogicPair (Sequence) | - | - |
1.12 |
->divide | XOR [1] | LogicPair (Sequence) | - | - |
1.13 |
->multiple | XOR [1] | Logic0toMany (Sequence) | - | - |
1.14 |
->ordered | XOR [1] | Logic0toMany (Sequence) | - | - |
1.15 |
->customOperator | XOR [1] | CustomOperator (Sequence) | - | - |
1.16 |
->random | XOR [1] | LogicSingle (Sequence) | - | - |
1.17 |
->numberIncorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.17a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.17b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.17c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18 |
->numberCorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.18a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.18b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19 |
->numberPresented | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.19a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.19b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20 |
->numberResponded | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.20a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.20b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21 |
->numberSelected | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.21a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.21b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.22 |
->substring | XOR [1] | Substring (Sequence) | - | - |
1.23 |
->equalRounded | XOR [1] | EqualRounded (Sequence) | - | - |
1.24 |
->null | XOR [1] | PT:Empty | - | This element has no value i.e. it is empty. |
1.25 |
->delete | XOR [1] | LogicPair (Sequence) | - | - |
1.26 |
->match | XOR [1] | LogicPair (Sequence) | - | - |
1.27 |
->index | XOR [1] | Index (Sequence) | - | - |
1.28 |
->power | XOR [1] | LogicPair (Sequence) | - | - |
1.29 |
->equal | XOR [1] | Equal (Sequence) | - | - |
1.30 |
->contains | XOR [1] | LogicPair (Sequence) | - | - |
1.31 |
->containerSize | XOR [1] | LogicSingle (Sequence) | - | - |
1.32 |
->correct | XOR [1] | DT:Correct (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.32a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.33 |
->default | XOR [1] | DT:Default (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.33a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.34 |
->anyN | XOR [1] | AnyN (Sequence) | - | - |
1.35 |
->integerDivide | XOR [1] | LogicPair (Sequence) | - | - |
1.36 |
->integerModulus | XOR [1] | LogicPair (Sequence) | - | - |
1.37 |
->isNull | XOR [1] | LogicSingle (Sequence) | - | - |
1.38 |
->member | XOR [1] | LogicPair (Sequence) | - | - |
1.39 |
->product | XOR [1] | Logic1toMany (Sequence) | - | - |
1.40 |
->round | XOR [1] | LogicSingle (Sequence) | - | - |
1.41 |
->truncate | XOR [1] | LogicSingle (Sequence) | - | - |
1.42 |
->fieldValue | XOR [1] | FieldValue (Sequence) | - | - |
1.43 |
->randomInteger | XOR [1] | DT:RandomInteger (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.43a |
--->@min | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "0". |
1.43b |
--->@max | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1.43c |
--->@step | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "1". |
1.44 |
->randomFloat | XOR [1] | DT:RandomFloat (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.44a |
--->@min | [0..1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. Default value = "0". |
1.44b |
--->@max | [1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. |
1.45 |
->variable | XOR [1] | DT:Variable (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.45a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.45b |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46 |
->outcomeMinimum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.46a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.46e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47 |
->outcomeMaximum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.47a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.47e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48 |
->testVariables | XOR [1] | DT:TestVariables (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.48a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48d |
--->@variableIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.48e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48f |
--->@baseType | [0..1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.49 |
->integerToFloat | XOR [1] | LogicSingle (Sequence) | - | - |
1.50 |
->inside | XOR [1] | Inside (Sequence) | - | - |
1.51 |
->baseValue | XOR [1] | DT:BaseValue (PT:String) | - | - |
1.51a |
--->@baseType | [1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.52 |
->patternMatch | XOR [1] | PatternMatch (Sequence) | - | - |
1.53 |
->mapResponsePoint | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.53a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.54 |
->mapResponse | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.54a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.55 |
->stringMatch | XOR [1] | StringMatch (Sequence) | - | - |
1.56 |
->repeat | XOR [1] | Repeat (Sequence) | - | - |
1.57 |
->roundTo | XOR [1] | RoundTo (Sequence) | - | - |
1.58 |
->lcm | XOR [1] | Logic1toMany (Sequence) | - | - |
1.59 |
->gcd | XOR [1] | Logic1toMany (Sequence) | - | - |
1.60 |
->min | XOR [1] | Logic1toMany (Sequence) | - | - |
1.61 |
->max | XOR [1] | Logic1toMany (Sequence) | - | - |
1.62 |
->mathConstant | XOR [1] | DT:MathConstant (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.62a |
--->@name | [1] | [ Enumeration (MathConstantNames) ] | - | Permitted values are: { pi | e }. |
1.63 |
->statsOperator | XOR [1] | StatsOperator (Sequence) | - | - |
1.64 |
->mathOperator | XOR [1] | MathOperator (Sequence) | - | - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | ExtendedTextInteraction.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | FeedbackBlock.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | FeedbackInline.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | FieldValue.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
a |
->@fieldIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1 |
-[[ Abstract ]]- | [1] | -[[ Selection ]]- | - | In the model this abstract class is named: ExpressionGroup |
1.1 |
->and | XOR [1] | Logic1toMany (Sequence) | - | - |
1.2 |
->gt | XOR [1] | LogicPair (Sequence) | - | - |
1.3 |
->not | XOR [1] | LogicSingle (Sequence) | - | - |
1.4 |
->lt | XOR [1] | LogicPair (Sequence) | - | - |
1.5 |
->gte | XOR [1] | LogicPair (Sequence) | - | - |
1.6 |
->lte | XOR [1] | LogicPair (Sequence) | - | - |
1.7 |
->or | XOR [1] | Logic1toMany (Sequence) | - | - |
1.8 |
->sum | XOR [1] | NumericLogic1toMany (Sequence) | - | - |
1.9 |
->durationLT | XOR [1] | LogicPair (Sequence) | - | - |
1.10 |
->durationGTE | XOR [1] | LogicPair (Sequence) | - | - |
1.11 |
->subtract | XOR [1] | LogicPair (Sequence) | - | - |
1.12 |
->divide | XOR [1] | LogicPair (Sequence) | - | - |
1.13 |
->multiple | XOR [1] | Logic0toMany (Sequence) | - | - |
1.14 |
->ordered | XOR [1] | Logic0toMany (Sequence) | - | - |
1.15 |
->customOperator | XOR [1] | CustomOperator (Sequence) | - | - |
1.16 |
->random | XOR [1] | LogicSingle (Sequence) | - | - |
1.17 |
->numberIncorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.17a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.17b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.17c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18 |
->numberCorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.18a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.18b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19 |
->numberPresented | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.19a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.19b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20 |
->numberResponded | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.20a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.20b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21 |
->numberSelected | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.21a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.21b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.22 |
->substring | XOR [1] | Substring (Sequence) | - | - |
1.23 |
->equalRounded | XOR [1] | EqualRounded (Sequence) | - | - |
1.24 |
->null | XOR [1] | PT:Empty | - | This element has no value i.e. it is empty. |
1.25 |
->delete | XOR [1] | LogicPair (Sequence) | - | - |
1.26 |
->match | XOR [1] | LogicPair (Sequence) | - | - |
1.27 |
->index | XOR [1] | Index (Sequence) | - | - |
1.28 |
->power | XOR [1] | LogicPair (Sequence) | - | - |
1.29 |
->equal | XOR [1] | Equal (Sequence) | - | - |
1.30 |
->contains | XOR [1] | LogicPair (Sequence) | - | - |
1.31 |
->containerSize | XOR [1] | LogicSingle (Sequence) | - | - |
1.32 |
->correct | XOR [1] | DT:Correct (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.32a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.33 |
->default | XOR [1] | DT:Default (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.33a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.34 |
->anyN | XOR [1] | AnyN (Sequence) | - | - |
1.35 |
->integerDivide | XOR [1] | LogicPair (Sequence) | - | - |
1.36 |
->integerModulus | XOR [1] | LogicPair (Sequence) | - | - |
1.37 |
->isNull | XOR [1] | LogicSingle (Sequence) | - | - |
1.38 |
->member | XOR [1] | LogicPair (Sequence) | - | - |
1.39 |
->product | XOR [1] | Logic1toMany (Sequence) | - | - |
1.40 |
->round | XOR [1] | LogicSingle (Sequence) | - | - |
1.41 |
->truncate | XOR [1] | LogicSingle (Sequence) | - | - |
1.42 |
->fieldValue | XOR [1] | FieldValue (Sequence) | - | - |
1.43 |
->randomInteger | XOR [1] | DT:RandomInteger (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.43a |
--->@min | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "0". |
1.43b |
--->@max | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1.43c |
--->@step | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "1". |
1.44 |
->randomFloat | XOR [1] | DT:RandomFloat (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.44a |
--->@min | [0..1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. Default value = "0". |
1.44b |
--->@max | [1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. |
1.45 |
->variable | XOR [1] | DT:Variable (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.45a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.45b |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46 |
->outcomeMinimum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.46a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.46e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47 |
->outcomeMaximum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.47a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.47e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48 |
->testVariables | XOR [1] | DT:TestVariables (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.48a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48d |
--->@variableIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.48e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48f |
--->@baseType | [0..1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.49 |
->integerToFloat | XOR [1] | LogicSingle (Sequence) | - | - |
1.50 |
->inside | XOR [1] | Inside (Sequence) | - | - |
1.51 |
->baseValue | XOR [1] | DT:BaseValue (PT:String) | - | - |
1.51a |
--->@baseType | [1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.52 |
->patternMatch | XOR [1] | PatternMatch (Sequence) | - | - |
1.53 |
->mapResponsePoint | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.53a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.54 |
->mapResponse | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.54a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.55 |
->stringMatch | XOR [1] | StringMatch (Sequence) | - | - |
1.56 |
->repeat | XOR [1] | Repeat (Sequence) | - | - |
1.57 |
->roundTo | XOR [1] | RoundTo (Sequence) | - | - |
1.58 |
->lcm | XOR [1] | Logic1toMany (Sequence) | - | - |
1.59 |
->gcd | XOR [1] | Logic1toMany (Sequence) | - | - |
1.60 |
->min | XOR [1] | Logic1toMany (Sequence) | - | - |
1.61 |
->max | XOR [1] | Logic1toMany (Sequence) | - | - |
1.62 |
->mathConstant | XOR [1] | DT:MathConstant (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.62a |
--->@name | [1] | [ Enumeration (MathConstantNames) ] | - | Permitted values are: { pi | e }. |
1.63 |
->statsOperator | XOR [1] | StatsOperator (Sequence) | - | - |
1.64 |
->mathOperator | XOR [1] | MathOperator (Sequence) | - | - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Gap.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | GapImg.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | GapMatchInteraction.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | GapText.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | GraphicAssociateInteraction.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | GraphicGapMatchInteraction.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | GraphicOrderInteraction.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | HR.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | HTMLText.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | HotText.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | HotTextInteraction.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | HotspotChoice.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | HotspotInteraction.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Img.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Index.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
a |
->@n | [1] | [ Union (IntOrIdentifier) ] | - | The value is one of the following data-type(s): {PT:NCName | PT:Int }. |
1 |
-[[ Abstract ]]- | [1] | -[[ Selection ]]- | - | In the model this abstract class is named: ExpressionGroup |
1.1 |
->and | XOR [1] | Logic1toMany (Sequence) | - | - |
1.2 |
->gt | XOR [1] | LogicPair (Sequence) | - | - |
1.3 |
->not | XOR [1] | LogicSingle (Sequence) | - | - |
1.4 |
->lt | XOR [1] | LogicPair (Sequence) | - | - |
1.5 |
->gte | XOR [1] | LogicPair (Sequence) | - | - |
1.6 |
->lte | XOR [1] | LogicPair (Sequence) | - | - |
1.7 |
->or | XOR [1] | Logic1toMany (Sequence) | - | - |
1.8 |
->sum | XOR [1] | NumericLogic1toMany (Sequence) | - | - |
1.9 |
->durationLT | XOR [1] | LogicPair (Sequence) | - | - |
1.10 |
->durationGTE | XOR [1] | LogicPair (Sequence) | - | - |
1.11 |
->subtract | XOR [1] | LogicPair (Sequence) | - | - |
1.12 |
->divide | XOR [1] | LogicPair (Sequence) | - | - |
1.13 |
->multiple | XOR [1] | Logic0toMany (Sequence) | - | - |
1.14 |
->ordered | XOR [1] | Logic0toMany (Sequence) | - | - |
1.15 |
->customOperator | XOR [1] | CustomOperator (Sequence) | - | - |
1.16 |
->random | XOR [1] | LogicSingle (Sequence) | - | - |
1.17 |
->numberIncorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.17a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.17b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.17c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18 |
->numberCorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.18a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.18b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19 |
->numberPresented | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.19a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.19b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20 |
->numberResponded | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.20a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.20b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21 |
->numberSelected | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.21a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.21b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.22 |
->substring | XOR [1] | Substring (Sequence) | - | - |
1.23 |
->equalRounded | XOR [1] | EqualRounded (Sequence) | - | - |
1.24 |
->null | XOR [1] | PT:Empty | - | This element has no value i.e. it is empty. |
1.25 |
->delete | XOR [1] | LogicPair (Sequence) | - | - |
1.26 |
->match | XOR [1] | LogicPair (Sequence) | - | - |
1.27 |
->index | XOR [1] | Index (Sequence) | - | - |
1.28 |
->power | XOR [1] | LogicPair (Sequence) | - | - |
1.29 |
->equal | XOR [1] | Equal (Sequence) | - | - |
1.30 |
->contains | XOR [1] | LogicPair (Sequence) | - | - |
1.31 |
->containerSize | XOR [1] | LogicSingle (Sequence) | - | - |
1.32 |
->correct | XOR [1] | DT:Correct (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.32a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.33 |
->default | XOR [1] | DT:Default (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.33a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.34 |
->anyN | XOR [1] | AnyN (Sequence) | - | - |
1.35 |
->integerDivide | XOR [1] | LogicPair (Sequence) | - | - |
1.36 |
->integerModulus | XOR [1] | LogicPair (Sequence) | - | - |
1.37 |
->isNull | XOR [1] | LogicSingle (Sequence) | - | - |
1.38 |
->member | XOR [1] | LogicPair (Sequence) | - | - |
1.39 |
->product | XOR [1] | Logic1toMany (Sequence) | - | - |
1.40 |
->round | XOR [1] | LogicSingle (Sequence) | - | - |
1.41 |
->truncate | XOR [1] | LogicSingle (Sequence) | - | - |
1.42 |
->fieldValue | XOR [1] | FieldValue (Sequence) | - | - |
1.43 |
->randomInteger | XOR [1] | DT:RandomInteger (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.43a |
--->@min | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "0". |
1.43b |
--->@max | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1.43c |
--->@step | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "1". |
1.44 |
->randomFloat | XOR [1] | DT:RandomFloat (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.44a |
--->@min | [0..1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. Default value = "0". |
1.44b |
--->@max | [1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. |
1.45 |
->variable | XOR [1] | DT:Variable (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.45a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.45b |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46 |
->outcomeMinimum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.46a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.46e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47 |
->outcomeMaximum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.47a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.47e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48 |
->testVariables | XOR [1] | DT:TestVariables (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.48a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48d |
--->@variableIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.48e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48f |
--->@baseType | [0..1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.49 |
->integerToFloat | XOR [1] | LogicSingle (Sequence) | - | - |
1.50 |
->inside | XOR [1] | Inside (Sequence) | - | - |
1.51 |
->baseValue | XOR [1] | DT:BaseValue (PT:String) | - | - |
1.51a |
--->@baseType | [1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.52 |
->patternMatch | XOR [1] | PatternMatch (Sequence) | - | - |
1.53 |
->mapResponsePoint | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.53a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.54 |
->mapResponse | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.54a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.55 |
->stringMatch | XOR [1] | StringMatch (Sequence) | - | - |
1.56 |
->repeat | XOR [1] | Repeat (Sequence) | - | - |
1.57 |
->roundTo | XOR [1] | RoundTo (Sequence) | - | - |
1.58 |
->lcm | XOR [1] | Logic1toMany (Sequence) | - | - |
1.59 |
->gcd | XOR [1] | Logic1toMany (Sequence) | - | - |
1.60 |
->min | XOR [1] | Logic1toMany (Sequence) | - | - |
1.61 |
->max | XOR [1] | Logic1toMany (Sequence) | - | - |
1.62 |
->mathConstant | XOR [1] | DT:MathConstant (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.62a |
--->@name | [1] | [ Enumeration (MathConstantNames) ] | - | Permitted values are: { pi | e }. |
1.63 |
->statsOperator | XOR [1] | StatsOperator (Sequence) | - | - |
1.64 |
->mathOperator | XOR [1] | MathOperator (Sequence) | - | - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | InfoControl.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | InlineChoice.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | InlineChoiceInteraction.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Inside.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
a |
->@shape | [1] | [ Enumeration (Shape) ] | - | Permitted values are: { circle | default | ellipse | poly | rect }. |
b |
->@coords | [1] | PT:NormalizedString | - | - |
1 |
-[[ Abstract ]]- | [1] | -[[ Selection ]]- | - | In the model this abstract class is named: ExpressionGroup |
1.1 |
->and | XOR [1] | Logic1toMany (Sequence) | - | - |
1.2 |
->gt | XOR [1] | LogicPair (Sequence) | - | - |
1.3 |
->not | XOR [1] | LogicSingle (Sequence) | - | - |
1.4 |
->lt | XOR [1] | LogicPair (Sequence) | - | - |
1.5 |
->gte | XOR [1] | LogicPair (Sequence) | - | - |
1.6 |
->lte | XOR [1] | LogicPair (Sequence) | - | - |
1.7 |
->or | XOR [1] | Logic1toMany (Sequence) | - | - |
1.8 |
->sum | XOR [1] | NumericLogic1toMany (Sequence) | - | - |
1.9 |
->durationLT | XOR [1] | LogicPair (Sequence) | - | - |
1.10 |
->durationGTE | XOR [1] | LogicPair (Sequence) | - | - |
1.11 |
->subtract | XOR [1] | LogicPair (Sequence) | - | - |
1.12 |
->divide | XOR [1] | LogicPair (Sequence) | - | - |
1.13 |
->multiple | XOR [1] | Logic0toMany (Sequence) | - | - |
1.14 |
->ordered | XOR [1] | Logic0toMany (Sequence) | - | - |
1.15 |
->customOperator | XOR [1] | CustomOperator (Sequence) | - | - |
1.16 |
->random | XOR [1] | LogicSingle (Sequence) | - | - |
1.17 |
->numberIncorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.17a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.17b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.17c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18 |
->numberCorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.18a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.18b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19 |
->numberPresented | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.19a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.19b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20 |
->numberResponded | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.20a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.20b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21 |
->numberSelected | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.21a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.21b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.22 |
->substring | XOR [1] | Substring (Sequence) | - | - |
1.23 |
->equalRounded | XOR [1] | EqualRounded (Sequence) | - | - |
1.24 |
->null | XOR [1] | PT:Empty | - | This element has no value i.e. it is empty. |
1.25 |
->delete | XOR [1] | LogicPair (Sequence) | - | - |
1.26 |
->match | XOR [1] | LogicPair (Sequence) | - | - |
1.27 |
->index | XOR [1] | Index (Sequence) | - | - |
1.28 |
->power | XOR [1] | LogicPair (Sequence) | - | - |
1.29 |
->equal | XOR [1] | Equal (Sequence) | - | - |
1.30 |
->contains | XOR [1] | LogicPair (Sequence) | - | - |
1.31 |
->containerSize | XOR [1] | LogicSingle (Sequence) | - | - |
1.32 |
->correct | XOR [1] | DT:Correct (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.32a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.33 |
->default | XOR [1] | DT:Default (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.33a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.34 |
->anyN | XOR [1] | AnyN (Sequence) | - | - |
1.35 |
->integerDivide | XOR [1] | LogicPair (Sequence) | - | - |
1.36 |
->integerModulus | XOR [1] | LogicPair (Sequence) | - | - |
1.37 |
->isNull | XOR [1] | LogicSingle (Sequence) | - | - |
1.38 |
->member | XOR [1] | LogicPair (Sequence) | - | - |
1.39 |
->product | XOR [1] | Logic1toMany (Sequence) | - | - |
1.40 |
->round | XOR [1] | LogicSingle (Sequence) | - | - |
1.41 |
->truncate | XOR [1] | LogicSingle (Sequence) | - | - |
1.42 |
->fieldValue | XOR [1] | FieldValue (Sequence) | - | - |
1.43 |
->randomInteger | XOR [1] | DT:RandomInteger (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.43a |
--->@min | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "0". |
1.43b |
--->@max | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1.43c |
--->@step | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "1". |
1.44 |
->randomFloat | XOR [1] | DT:RandomFloat (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.44a |
--->@min | [0..1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. Default value = "0". |
1.44b |
--->@max | [1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. |
1.45 |
->variable | XOR [1] | DT:Variable (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.45a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.45b |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46 |
->outcomeMinimum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.46a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.46e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47 |
->outcomeMaximum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.47a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.47e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48 |
->testVariables | XOR [1] | DT:TestVariables (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.48a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48d |
--->@variableIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.48e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48f |
--->@baseType | [0..1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.49 |
->integerToFloat | XOR [1] | LogicSingle (Sequence) | - | - |
1.50 |
->inside | XOR [1] | Inside (Sequence) | - | - |
1.51 |
->baseValue | XOR [1] | DT:BaseValue (PT:String) | - | - |
1.51a |
--->@baseType | [1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.52 |
->patternMatch | XOR [1] | PatternMatch (Sequence) | - | - |
1.53 |
->mapResponsePoint | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.53a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.54 |
->mapResponse | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.54a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.55 |
->stringMatch | XOR [1] | StringMatch (Sequence) | - | - |
1.56 |
->repeat | XOR [1] | Repeat (Sequence) | - | - |
1.57 |
->roundTo | XOR [1] | RoundTo (Sequence) | - | - |
1.58 |
->lcm | XOR [1] | Logic1toMany (Sequence) | - | - |
1.59 |
->gcd | XOR [1] | Logic1toMany (Sequence) | - | - |
1.60 |
->min | XOR [1] | Logic1toMany (Sequence) | - | - |
1.61 |
->max | XOR [1] | Logic1toMany (Sequence) | - | - |
1.62 |
->mathConstant | XOR [1] | DT:MathConstant (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.62a |
--->@name | [1] | [ Enumeration (MathConstantNames) ] | - | Permitted values are: { pi | e }. |
1.63 |
->statsOperator | XOR [1] | StatsOperator (Sequence) | - | - |
1.64 |
->mathOperator | XOR [1] | MathOperator (Sequence) | - | - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | InterpolationTable.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | ItemBody.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | LI.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Label.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Logic0toMany.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
1 |
-[[ Abstract ]]- | [0..*] | -[[ Selection ]]- | - | In the model this abstract class is named: ExpressionGroup |
1.1 |
->and | XOR [1] | Logic1toMany (Sequence) | - | - |
1.2 |
->gt | XOR [1] | LogicPair (Sequence) | - | - |
1.3 |
->not | XOR [1] | LogicSingle (Sequence) | - | - |
1.4 |
->lt | XOR [1] | LogicPair (Sequence) | - | - |
1.5 |
->gte | XOR [1] | LogicPair (Sequence) | - | - |
1.6 |
->lte | XOR [1] | LogicPair (Sequence) | - | - |
1.7 |
->or | XOR [1] | Logic1toMany (Sequence) | - | - |
1.8 |
->sum | XOR [1] | NumericLogic1toMany (Sequence) | - | - |
1.9 |
->durationLT | XOR [1] | LogicPair (Sequence) | - | - |
1.10 |
->durationGTE | XOR [1] | LogicPair (Sequence) | - | - |
1.11 |
->subtract | XOR [1] | LogicPair (Sequence) | - | - |
1.12 |
->divide | XOR [1] | LogicPair (Sequence) | - | - |
1.13 |
->multiple | XOR [1] | Logic0toMany (Sequence) | - | - |
1.14 |
->ordered | XOR [1] | Logic0toMany (Sequence) | - | - |
1.15 |
->customOperator | XOR [1] | CustomOperator (Sequence) | - | - |
1.16 |
->random | XOR [1] | LogicSingle (Sequence) | - | - |
1.17 |
->numberIncorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.17a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.17b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.17c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18 |
->numberCorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.18a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.18b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19 |
->numberPresented | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.19a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.19b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20 |
->numberResponded | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.20a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.20b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21 |
->numberSelected | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.21a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.21b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.22 |
->substring | XOR [1] | Substring (Sequence) | - | - |
1.23 |
->equalRounded | XOR [1] | EqualRounded (Sequence) | - | - |
1.24 |
->null | XOR [1] | PT:Empty | - | This element has no value i.e. it is empty. |
1.25 |
->delete | XOR [1] | LogicPair (Sequence) | - | - |
1.26 |
->match | XOR [1] | LogicPair (Sequence) | - | - |
1.27 |
->index | XOR [1] | Index (Sequence) | - | - |
1.28 |
->power | XOR [1] | LogicPair (Sequence) | - | - |
1.29 |
->equal | XOR [1] | Equal (Sequence) | - | - |
1.30 |
->contains | XOR [1] | LogicPair (Sequence) | - | - |
1.31 |
->containerSize | XOR [1] | LogicSingle (Sequence) | - | - |
1.32 |
->correct | XOR [1] | DT:Correct (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.32a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.33 |
->default | XOR [1] | DT:Default (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.33a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.34 |
->anyN | XOR [1] | AnyN (Sequence) | - | - |
1.35 |
->integerDivide | XOR [1] | LogicPair (Sequence) | - | - |
1.36 |
->integerModulus | XOR [1] | LogicPair (Sequence) | - | - |
1.37 |
->isNull | XOR [1] | LogicSingle (Sequence) | - | - |
1.38 |
->member | XOR [1] | LogicPair (Sequence) | - | - |
1.39 |
->product | XOR [1] | Logic1toMany (Sequence) | - | - |
1.40 |
->round | XOR [1] | LogicSingle (Sequence) | - | - |
1.41 |
->truncate | XOR [1] | LogicSingle (Sequence) | - | - |
1.42 |
->fieldValue | XOR [1] | FieldValue (Sequence) | - | - |
1.43 |
->randomInteger | XOR [1] | DT:RandomInteger (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.43a |
--->@min | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "0". |
1.43b |
--->@max | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1.43c |
--->@step | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "1". |
1.44 |
->randomFloat | XOR [1] | DT:RandomFloat (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.44a |
--->@min | [0..1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. Default value = "0". |
1.44b |
--->@max | [1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. |
1.45 |
->variable | XOR [1] | DT:Variable (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.45a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.45b |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46 |
->outcomeMinimum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.46a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.46e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47 |
->outcomeMaximum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.47a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.47e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48 |
->testVariables | XOR [1] | DT:TestVariables (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.48a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48d |
--->@variableIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.48e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48f |
--->@baseType | [0..1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.49 |
->integerToFloat | XOR [1] | LogicSingle (Sequence) | - | - |
1.50 |
->inside | XOR [1] | Inside (Sequence) | - | - |
1.51 |
->baseValue | XOR [1] | DT:BaseValue (PT:String) | - | - |
1.51a |
--->@baseType | [1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.52 |
->patternMatch | XOR [1] | PatternMatch (Sequence) | - | - |
1.53 |
->mapResponsePoint | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.53a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.54 |
->mapResponse | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.54a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.55 |
->stringMatch | XOR [1] | StringMatch (Sequence) | - | - |
1.56 |
->repeat | XOR [1] | Repeat (Sequence) | - | - |
1.57 |
->roundTo | XOR [1] | RoundTo (Sequence) | - | - |
1.58 |
->lcm | XOR [1] | Logic1toMany (Sequence) | - | - |
1.59 |
->gcd | XOR [1] | Logic1toMany (Sequence) | - | - |
1.60 |
->min | XOR [1] | Logic1toMany (Sequence) | - | - |
1.61 |
->max | XOR [1] | Logic1toMany (Sequence) | - | - |
1.62 |
->mathConstant | XOR [1] | DT:MathConstant (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.62a |
--->@name | [1] | [ Enumeration (MathConstantNames) ] | - | Permitted values are: { pi | e }. |
1.63 |
->statsOperator | XOR [1] | StatsOperator (Sequence) | - | - |
1.64 |
->mathOperator | XOR [1] | MathOperator (Sequence) | - | - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Logic1toMany.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
1 |
-[[ Abstract ]]- | [1..*] | -[[ Selection ]]- | - | In the model this abstract class is named: ExpressionGroup |
1.1 |
->and | XOR [1] | Logic1toMany (Sequence) | - | - |
1.2 |
->gt | XOR [1] | LogicPair (Sequence) | - | - |
1.3 |
->not | XOR [1] | LogicSingle (Sequence) | - | - |
1.4 |
->lt | XOR [1] | LogicPair (Sequence) | - | - |
1.5 |
->gte | XOR [1] | LogicPair (Sequence) | - | - |
1.6 |
->lte | XOR [1] | LogicPair (Sequence) | - | - |
1.7 |
->or | XOR [1] | Logic1toMany (Sequence) | - | - |
1.8 |
->sum | XOR [1] | NumericLogic1toMany (Sequence) | - | - |
1.9 |
->durationLT | XOR [1] | LogicPair (Sequence) | - | - |
1.10 |
->durationGTE | XOR [1] | LogicPair (Sequence) | - | - |
1.11 |
->subtract | XOR [1] | LogicPair (Sequence) | - | - |
1.12 |
->divide | XOR [1] | LogicPair (Sequence) | - | - |
1.13 |
->multiple | XOR [1] | Logic0toMany (Sequence) | - | - |
1.14 |
->ordered | XOR [1] | Logic0toMany (Sequence) | - | - |
1.15 |
->customOperator | XOR [1] | CustomOperator (Sequence) | - | - |
1.16 |
->random | XOR [1] | LogicSingle (Sequence) | - | - |
1.17 |
->numberIncorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.17a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.17b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.17c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18 |
->numberCorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.18a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.18b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19 |
->numberPresented | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.19a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.19b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20 |
->numberResponded | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.20a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.20b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21 |
->numberSelected | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.21a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.21b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.22 |
->substring | XOR [1] | Substring (Sequence) | - | - |
1.23 |
->equalRounded | XOR [1] | EqualRounded (Sequence) | - | - |
1.24 |
->null | XOR [1] | PT:Empty | - | This element has no value i.e. it is empty. |
1.25 |
->delete | XOR [1] | LogicPair (Sequence) | - | - |
1.26 |
->match | XOR [1] | LogicPair (Sequence) | - | - |
1.27 |
->index | XOR [1] | Index (Sequence) | - | - |
1.28 |
->power | XOR [1] | LogicPair (Sequence) | - | - |
1.29 |
->equal | XOR [1] | Equal (Sequence) | - | - |
1.30 |
->contains | XOR [1] | LogicPair (Sequence) | - | - |
1.31 |
->containerSize | XOR [1] | LogicSingle (Sequence) | - | - |
1.32 |
->correct | XOR [1] | DT:Correct (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.32a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.33 |
->default | XOR [1] | DT:Default (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.33a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.34 |
->anyN | XOR [1] | AnyN (Sequence) | - | - |
1.35 |
->integerDivide | XOR [1] | LogicPair (Sequence) | - | - |
1.36 |
->integerModulus | XOR [1] | LogicPair (Sequence) | - | - |
1.37 |
->isNull | XOR [1] | LogicSingle (Sequence) | - | - |
1.38 |
->member | XOR [1] | LogicPair (Sequence) | - | - |
1.39 |
->product | XOR [1] | Logic1toMany (Sequence) | - | - |
1.40 |
->round | XOR [1] | LogicSingle (Sequence) | - | - |
1.41 |
->truncate | XOR [1] | LogicSingle (Sequence) | - | - |
1.42 |
->fieldValue | XOR [1] | FieldValue (Sequence) | - | - |
1.43 |
->randomInteger | XOR [1] | DT:RandomInteger (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.43a |
--->@min | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "0". |
1.43b |
--->@max | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1.43c |
--->@step | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "1". |
1.44 |
->randomFloat | XOR [1] | DT:RandomFloat (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.44a |
--->@min | [0..1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. Default value = "0". |
1.44b |
--->@max | [1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. |
1.45 |
->variable | XOR [1] | DT:Variable (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.45a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.45b |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46 |
->outcomeMinimum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.46a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.46e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47 |
->outcomeMaximum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.47a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.47e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48 |
->testVariables | XOR [1] | DT:TestVariables (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.48a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48d |
--->@variableIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.48e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48f |
--->@baseType | [0..1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.49 |
->integerToFloat | XOR [1] | LogicSingle (Sequence) | - | - |
1.50 |
->inside | XOR [1] | Inside (Sequence) | - | - |
1.51 |
->baseValue | XOR [1] | DT:BaseValue (PT:String) | - | - |
1.51a |
--->@baseType | [1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.52 |
->patternMatch | XOR [1] | PatternMatch (Sequence) | - | - |
1.53 |
->mapResponsePoint | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.53a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.54 |
->mapResponse | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.54a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.55 |
->stringMatch | XOR [1] | StringMatch (Sequence) | - | - |
1.56 |
->repeat | XOR [1] | Repeat (Sequence) | - | - |
1.57 |
->roundTo | XOR [1] | RoundTo (Sequence) | - | - |
1.58 |
->lcm | XOR [1] | Logic1toMany (Sequence) | - | - |
1.59 |
->gcd | XOR [1] | Logic1toMany (Sequence) | - | - |
1.60 |
->min | XOR [1] | Logic1toMany (Sequence) | - | - |
1.61 |
->max | XOR [1] | Logic1toMany (Sequence) | - | - |
1.62 |
->mathConstant | XOR [1] | DT:MathConstant (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.62a |
--->@name | [1] | [ Enumeration (MathConstantNames) ] | - | Permitted values are: { pi | e }. |
1.63 |
->statsOperator | XOR [1] | StatsOperator (Sequence) | - | - |
1.64 |
->mathOperator | XOR [1] | MathOperator (Sequence) | - | - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | LogicPair.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
1 |
-[[ Abstract ]]- | [ 2 .. 2 ] | -[[ Selection ]]- | - | In the model this abstract class is named: ExpressionGroup |
1.1 |
->and | XOR [1] | Logic1toMany (Sequence) | - | - |
1.2 |
->gt | XOR [1] | LogicPair (Sequence) | - | - |
1.3 |
->not | XOR [1] | LogicSingle (Sequence) | - | - |
1.4 |
->lt | XOR [1] | LogicPair (Sequence) | - | - |
1.5 |
->gte | XOR [1] | LogicPair (Sequence) | - | - |
1.6 |
->lte | XOR [1] | LogicPair (Sequence) | - | - |
1.7 |
->or | XOR [1] | Logic1toMany (Sequence) | - | - |
1.8 |
->sum | XOR [1] | NumericLogic1toMany (Sequence) | - | - |
1.9 |
->durationLT | XOR [1] | LogicPair (Sequence) | - | - |
1.10 |
->durationGTE | XOR [1] | LogicPair (Sequence) | - | - |
1.11 |
->subtract | XOR [1] | LogicPair (Sequence) | - | - |
1.12 |
->divide | XOR [1] | LogicPair (Sequence) | - | - |
1.13 |
->multiple | XOR [1] | Logic0toMany (Sequence) | - | - |
1.14 |
->ordered | XOR [1] | Logic0toMany (Sequence) | - | - |
1.15 |
->customOperator | XOR [1] | CustomOperator (Sequence) | - | - |
1.16 |
->random | XOR [1] | LogicSingle (Sequence) | - | - |
1.17 |
->numberIncorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.17a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.17b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.17c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18 |
->numberCorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.18a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.18b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19 |
->numberPresented | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.19a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.19b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20 |
->numberResponded | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.20a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.20b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21 |
->numberSelected | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.21a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.21b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.22 |
->substring | XOR [1] | Substring (Sequence) | - | - |
1.23 |
->equalRounded | XOR [1] | EqualRounded (Sequence) | - | - |
1.24 |
->null | XOR [1] | PT:Empty | - | This element has no value i.e. it is empty. |
1.25 |
->delete | XOR [1] | LogicPair (Sequence) | - | - |
1.26 |
->match | XOR [1] | LogicPair (Sequence) | - | - |
1.27 |
->index | XOR [1] | Index (Sequence) | - | - |
1.28 |
->power | XOR [1] | LogicPair (Sequence) | - | - |
1.29 |
->equal | XOR [1] | Equal (Sequence) | - | - |
1.30 |
->contains | XOR [1] | LogicPair (Sequence) | - | - |
1.31 |
->containerSize | XOR [1] | LogicSingle (Sequence) | - | - |
1.32 |
->correct | XOR [1] | DT:Correct (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.32a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.33 |
->default | XOR [1] | DT:Default (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.33a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.34 |
->anyN | XOR [1] | AnyN (Sequence) | - | - |
1.35 |
->integerDivide | XOR [1] | LogicPair (Sequence) | - | - |
1.36 |
->integerModulus | XOR [1] | LogicPair (Sequence) | - | - |
1.37 |
->isNull | XOR [1] | LogicSingle (Sequence) | - | - |
1.38 |
->member | XOR [1] | LogicPair (Sequence) | - | - |
1.39 |
->product | XOR [1] | Logic1toMany (Sequence) | - | - |
1.40 |
->round | XOR [1] | LogicSingle (Sequence) | - | - |
1.41 |
->truncate | XOR [1] | LogicSingle (Sequence) | - | - |
1.42 |
->fieldValue | XOR [1] | FieldValue (Sequence) | - | - |
1.43 |
->randomInteger | XOR [1] | DT:RandomInteger (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.43a |
--->@min | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "0". |
1.43b |
--->@max | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1.43c |
--->@step | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "1". |
1.44 |
->randomFloat | XOR [1] | DT:RandomFloat (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.44a |
--->@min | [0..1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. Default value = "0". |
1.44b |
--->@max | [1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. |
1.45 |
->variable | XOR [1] | DT:Variable (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.45a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.45b |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46 |
->outcomeMinimum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.46a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.46e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47 |
->outcomeMaximum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.47a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.47e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48 |
->testVariables | XOR [1] | DT:TestVariables (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.48a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48d |
--->@variableIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.48e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48f |
--->@baseType | [0..1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.49 |
->integerToFloat | XOR [1] | LogicSingle (Sequence) | - | - |
1.50 |
->inside | XOR [1] | Inside (Sequence) | - | - |
1.51 |
->baseValue | XOR [1] | DT:BaseValue (PT:String) | - | - |
1.51a |
--->@baseType | [1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.52 |
->patternMatch | XOR [1] | PatternMatch (Sequence) | - | - |
1.53 |
->mapResponsePoint | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.53a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.54 |
->mapResponse | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.54a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.55 |
->stringMatch | XOR [1] | StringMatch (Sequence) | - | - |
1.56 |
->repeat | XOR [1] | Repeat (Sequence) | - | - |
1.57 |
->roundTo | XOR [1] | RoundTo (Sequence) | - | - |
1.58 |
->lcm | XOR [1] | Logic1toMany (Sequence) | - | - |
1.59 |
->gcd | XOR [1] | Logic1toMany (Sequence) | - | - |
1.60 |
->min | XOR [1] | Logic1toMany (Sequence) | - | - |
1.61 |
->max | XOR [1] | Logic1toMany (Sequence) | - | - |
1.62 |
->mathConstant | XOR [1] | DT:MathConstant (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.62a |
--->@name | [1] | [ Enumeration (MathConstantNames) ] | - | Permitted values are: { pi | e }. |
1.63 |
->statsOperator | XOR [1] | StatsOperator (Sequence) | - | - |
1.64 |
->mathOperator | XOR [1] | MathOperator (Sequence) | - | - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | LogicSingle.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
1 |
-[[ Abstract ]]- | [1] | -[[ Selection ]]- | - | In the model this abstract class is named: ExpressionGroup |
1.1 |
->and | XOR [1] | Logic1toMany (Sequence) | - | - |
1.2 |
->gt | XOR [1] | LogicPair (Sequence) | - | - |
1.3 |
->not | XOR [1] | LogicSingle (Sequence) | - | - |
1.4 |
->lt | XOR [1] | LogicPair (Sequence) | - | - |
1.5 |
->gte | XOR [1] | LogicPair (Sequence) | - | - |
1.6 |
->lte | XOR [1] | LogicPair (Sequence) | - | - |
1.7 |
->or | XOR [1] | Logic1toMany (Sequence) | - | - |
1.8 |
->sum | XOR [1] | NumericLogic1toMany (Sequence) | - | - |
1.9 |
->durationLT | XOR [1] | LogicPair (Sequence) | - | - |
1.10 |
->durationGTE | XOR [1] | LogicPair (Sequence) | - | - |
1.11 |
->subtract | XOR [1] | LogicPair (Sequence) | - | - |
1.12 |
->divide | XOR [1] | LogicPair (Sequence) | - | - |
1.13 |
->multiple | XOR [1] | Logic0toMany (Sequence) | - | - |
1.14 |
->ordered | XOR [1] | Logic0toMany (Sequence) | - | - |
1.15 |
->customOperator | XOR [1] | CustomOperator (Sequence) | - | - |
1.16 |
->random | XOR [1] | LogicSingle (Sequence) | - | - |
1.17 |
->numberIncorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.17a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.17b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.17c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18 |
->numberCorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.18a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.18b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19 |
->numberPresented | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.19a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.19b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20 |
->numberResponded | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.20a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.20b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21 |
->numberSelected | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.21a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.21b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.22 |
->substring | XOR [1] | Substring (Sequence) | - | - |
1.23 |
->equalRounded | XOR [1] | EqualRounded (Sequence) | - | - |
1.24 |
->null | XOR [1] | PT:Empty | - | This element has no value i.e. it is empty. |
1.25 |
->delete | XOR [1] | LogicPair (Sequence) | - | - |
1.26 |
->match | XOR [1] | LogicPair (Sequence) | - | - |
1.27 |
->index | XOR [1] | Index (Sequence) | - | - |
1.28 |
->power | XOR [1] | LogicPair (Sequence) | - | - |
1.29 |
->equal | XOR [1] | Equal (Sequence) | - | - |
1.30 |
->contains | XOR [1] | LogicPair (Sequence) | - | - |
1.31 |
->containerSize | XOR [1] | LogicSingle (Sequence) | - | - |
1.32 |
->correct | XOR [1] | DT:Correct (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.32a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.33 |
->default | XOR [1] | DT:Default (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.33a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.34 |
->anyN | XOR [1] | AnyN (Sequence) | - | - |
1.35 |
->integerDivide | XOR [1] | LogicPair (Sequence) | - | - |
1.36 |
->integerModulus | XOR [1] | LogicPair (Sequence) | - | - |
1.37 |
->isNull | XOR [1] | LogicSingle (Sequence) | - | - |
1.38 |
->member | XOR [1] | LogicPair (Sequence) | - | - |
1.39 |
->product | XOR [1] | Logic1toMany (Sequence) | - | - |
1.40 |
->round | XOR [1] | LogicSingle (Sequence) | - | - |
1.41 |
->truncate | XOR [1] | LogicSingle (Sequence) | - | - |
1.42 |
->fieldValue | XOR [1] | FieldValue (Sequence) | - | - |
1.43 |
->randomInteger | XOR [1] | DT:RandomInteger (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.43a |
--->@min | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "0". |
1.43b |
--->@max | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1.43c |
--->@step | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "1". |
1.44 |
->randomFloat | XOR [1] | DT:RandomFloat (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.44a |
--->@min | [0..1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. Default value = "0". |
1.44b |
--->@max | [1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. |
1.45 |
->variable | XOR [1] | DT:Variable (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.45a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.45b |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46 |
->outcomeMinimum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.46a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.46e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47 |
->outcomeMaximum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.47a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.47e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48 |
->testVariables | XOR [1] | DT:TestVariables (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.48a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48d |
--->@variableIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.48e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48f |
--->@baseType | [0..1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.49 |
->integerToFloat | XOR [1] | LogicSingle (Sequence) | - | - |
1.50 |
->inside | XOR [1] | Inside (Sequence) | - | - |
1.51 |
->baseValue | XOR [1] | DT:BaseValue (PT:String) | - | - |
1.51a |
--->@baseType | [1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.52 |
->patternMatch | XOR [1] | PatternMatch (Sequence) | - | - |
1.53 |
->mapResponsePoint | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.53a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.54 |
->mapResponse | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.54a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.55 |
->stringMatch | XOR [1] | StringMatch (Sequence) | - | - |
1.56 |
->repeat | XOR [1] | Repeat (Sequence) | - | - |
1.57 |
->roundTo | XOR [1] | RoundTo (Sequence) | - | - |
1.58 |
->lcm | XOR [1] | Logic1toMany (Sequence) | - | - |
1.59 |
->gcd | XOR [1] | Logic1toMany (Sequence) | - | - |
1.60 |
->min | XOR [1] | Logic1toMany (Sequence) | - | - |
1.61 |
->max | XOR [1] | Logic1toMany (Sequence) | - | - |
1.62 |
->mathConstant | XOR [1] | DT:MathConstant (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.62a |
--->@name | [1] | [ Enumeration (MathConstantNames) ] | - | Permitted values are: { pi | e }. |
1.63 |
->statsOperator | XOR [1] | StatsOperator (Sequence) | - | - |
1.64 |
->mathOperator | XOR [1] | MathOperator (Sequence) | - | - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | LookupOutcomeValue.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
a |
->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1 |
-[[ Abstract ]]- | [1] | -[[ Selection ]]- | - | In the model this abstract class is named: ExpressionGroup |
1.1 |
->and | XOR [1] | Logic1toMany (Sequence) | - | - |
1.2 |
->gt | XOR [1] | LogicPair (Sequence) | - | - |
1.3 |
->not | XOR [1] | LogicSingle (Sequence) | - | - |
1.4 |
->lt | XOR [1] | LogicPair (Sequence) | - | - |
1.5 |
->gte | XOR [1] | LogicPair (Sequence) | - | - |
1.6 |
->lte | XOR [1] | LogicPair (Sequence) | - | - |
1.7 |
->or | XOR [1] | Logic1toMany (Sequence) | - | - |
1.8 |
->sum | XOR [1] | NumericLogic1toMany (Sequence) | - | - |
1.9 |
->durationLT | XOR [1] | LogicPair (Sequence) | - | - |
1.10 |
->durationGTE | XOR [1] | LogicPair (Sequence) | - | - |
1.11 |
->subtract | XOR [1] | LogicPair (Sequence) | - | - |
1.12 |
->divide | XOR [1] | LogicPair (Sequence) | - | - |
1.13 |
->multiple | XOR [1] | Logic0toMany (Sequence) | - | - |
1.14 |
->ordered | XOR [1] | Logic0toMany (Sequence) | - | - |
1.15 |
->customOperator | XOR [1] | CustomOperator (Sequence) | - | - |
1.16 |
->random | XOR [1] | LogicSingle (Sequence) | - | - |
1.17 |
->numberIncorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.17a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.17b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.17c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18 |
->numberCorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.18a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.18b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19 |
->numberPresented | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.19a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.19b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20 |
->numberResponded | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.20a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.20b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21 |
->numberSelected | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.21a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.21b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.22 |
->substring | XOR [1] | Substring (Sequence) | - | - |
1.23 |
->equalRounded | XOR [1] | EqualRounded (Sequence) | - | - |
1.24 |
->null | XOR [1] | PT:Empty | - | This element has no value i.e. it is empty. |
1.25 |
->delete | XOR [1] | LogicPair (Sequence) | - | - |
1.26 |
->match | XOR [1] | LogicPair (Sequence) | - | - |
1.27 |
->index | XOR [1] | Index (Sequence) | - | - |
1.28 |
->power | XOR [1] | LogicPair (Sequence) | - | - |
1.29 |
->equal | XOR [1] | Equal (Sequence) | - | - |
1.30 |
->contains | XOR [1] | LogicPair (Sequence) | - | - |
1.31 |
->containerSize | XOR [1] | LogicSingle (Sequence) | - | - |
1.32 |
->correct | XOR [1] | DT:Correct (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.32a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.33 |
->default | XOR [1] | DT:Default (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.33a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.34 |
->anyN | XOR [1] | AnyN (Sequence) | - | - |
1.35 |
->integerDivide | XOR [1] | LogicPair (Sequence) | - | - |
1.36 |
->integerModulus | XOR [1] | LogicPair (Sequence) | - | - |
1.37 |
->isNull | XOR [1] | LogicSingle (Sequence) | - | - |
1.38 |
->member | XOR [1] | LogicPair (Sequence) | - | - |
1.39 |
->product | XOR [1] | Logic1toMany (Sequence) | - | - |
1.40 |
->round | XOR [1] | LogicSingle (Sequence) | - | - |
1.41 |
->truncate | XOR [1] | LogicSingle (Sequence) | - | - |
1.42 |
->fieldValue | XOR [1] | FieldValue (Sequence) | - | - |
1.43 |
->randomInteger | XOR [1] | DT:RandomInteger (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.43a |
--->@min | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "0". |
1.43b |
--->@max | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1.43c |
--->@step | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "1". |
1.44 |
->randomFloat | XOR [1] | DT:RandomFloat (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.44a |
--->@min | [0..1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. Default value = "0". |
1.44b |
--->@max | [1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. |
1.45 |
->variable | XOR [1] | DT:Variable (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.45a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.45b |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46 |
->outcomeMinimum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.46a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.46e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47 |
->outcomeMaximum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.47a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.47e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48 |
->testVariables | XOR [1] | DT:TestVariables (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.48a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48d |
--->@variableIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.48e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48f |
--->@baseType | [0..1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.49 |
->integerToFloat | XOR [1] | LogicSingle (Sequence) | - | - |
1.50 |
->inside | XOR [1] | Inside (Sequence) | - | - |
1.51 |
->baseValue | XOR [1] | DT:BaseValue (PT:String) | - | - |
1.51a |
--->@baseType | [1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.52 |
->patternMatch | XOR [1] | PatternMatch (Sequence) | - | - |
1.53 |
->mapResponsePoint | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.53a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.54 |
->mapResponse | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.54a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.55 |
->stringMatch | XOR [1] | StringMatch (Sequence) | - | - |
1.56 |
->repeat | XOR [1] | Repeat (Sequence) | - | - |
1.57 |
->roundTo | XOR [1] | RoundTo (Sequence) | - | - |
1.58 |
->lcm | XOR [1] | Logic1toMany (Sequence) | - | - |
1.59 |
->gcd | XOR [1] | Logic1toMany (Sequence) | - | - |
1.60 |
->min | XOR [1] | Logic1toMany (Sequence) | - | - |
1.61 |
->max | XOR [1] | Logic1toMany (Sequence) | - | - |
1.62 |
->mathConstant | XOR [1] | DT:MathConstant (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.62a |
--->@name | [1] | [ Enumeration (MathConstantNames) ] | - | Permitted values are: { pi | e }. |
1.63 |
->statsOperator | XOR [1] | StatsOperator (Sequence) | - | - |
1.64 |
->mathOperator | XOR [1] | MathOperator (Sequence) | - | - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Mapping.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | MatchInteraction.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | MatchTable.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | MathOperator.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
a |
->@name | [1] | [ Enumeration (MathOperatorName) ] | - | Permitted values are: { sin | cos | tan | sec | csc | cot | asin | acos | atan | atan2 | asec | acsc | acot | sinh | cosh | tanh | sech | csch | coth | log | ln | exp | abs | signum | floor | ceil | toDegrees | toRadians }. |
1 |
-[[ Abstract ]]- | [1..*] | -[[ Selection ]]- | - | In the model this abstract class is named: ExpressionGroup |
1.1 |
->and | XOR [1] | Logic1toMany (Sequence) | - | - |
1.2 |
->gt | XOR [1] | LogicPair (Sequence) | - | - |
1.3 |
->not | XOR [1] | LogicSingle (Sequence) | - | - |
1.4 |
->lt | XOR [1] | LogicPair (Sequence) | - | - |
1.5 |
->gte | XOR [1] | LogicPair (Sequence) | - | - |
1.6 |
->lte | XOR [1] | LogicPair (Sequence) | - | - |
1.7 |
->or | XOR [1] | Logic1toMany (Sequence) | - | - |
1.8 |
->sum | XOR [1] | NumericLogic1toMany (Sequence) | - | - |
1.9 |
->durationLT | XOR [1] | LogicPair (Sequence) | - | - |
1.10 |
->durationGTE | XOR [1] | LogicPair (Sequence) | - | - |
1.11 |
->subtract | XOR [1] | LogicPair (Sequence) | - | - |
1.12 |
->divide | XOR [1] | LogicPair (Sequence) | - | - |
1.13 |
->multiple | XOR [1] | Logic0toMany (Sequence) | - | - |
1.14 |
->ordered | XOR [1] | Logic0toMany (Sequence) | - | - |
1.15 |
->customOperator | XOR [1] | CustomOperator (Sequence) | - | - |
1.16 |
->random | XOR [1] | LogicSingle (Sequence) | - | - |
1.17 |
->numberIncorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.17a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.17b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.17c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18 |
->numberCorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.18a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.18b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19 |
->numberPresented | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.19a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.19b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20 |
->numberResponded | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.20a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.20b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21 |
->numberSelected | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.21a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.21b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.22 |
->substring | XOR [1] | Substring (Sequence) | - | - |
1.23 |
->equalRounded | XOR [1] | EqualRounded (Sequence) | - | - |
1.24 |
->null | XOR [1] | PT:Empty | - | This element has no value i.e. it is empty. |
1.25 |
->delete | XOR [1] | LogicPair (Sequence) | - | - |
1.26 |
->match | XOR [1] | LogicPair (Sequence) | - | - |
1.27 |
->index | XOR [1] | Index (Sequence) | - | - |
1.28 |
->power | XOR [1] | LogicPair (Sequence) | - | - |
1.29 |
->equal | XOR [1] | Equal (Sequence) | - | - |
1.30 |
->contains | XOR [1] | LogicPair (Sequence) | - | - |
1.31 |
->containerSize | XOR [1] | LogicSingle (Sequence) | - | - |
1.32 |
->correct | XOR [1] | DT:Correct (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.32a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.33 |
->default | XOR [1] | DT:Default (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.33a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.34 |
->anyN | XOR [1] | AnyN (Sequence) | - | - |
1.35 |
->integerDivide | XOR [1] | LogicPair (Sequence) | - | - |
1.36 |
->integerModulus | XOR [1] | LogicPair (Sequence) | - | - |
1.37 |
->isNull | XOR [1] | LogicSingle (Sequence) | - | - |
1.38 |
->member | XOR [1] | LogicPair (Sequence) | - | - |
1.39 |
->product | XOR [1] | Logic1toMany (Sequence) | - | - |
1.40 |
->round | XOR [1] | LogicSingle (Sequence) | - | - |
1.41 |
->truncate | XOR [1] | LogicSingle (Sequence) | - | - |
1.42 |
->fieldValue | XOR [1] | FieldValue (Sequence) | - | - |
1.43 |
->randomInteger | XOR [1] | DT:RandomInteger (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.43a |
--->@min | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "0". |
1.43b |
--->@max | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1.43c |
--->@step | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "1". |
1.44 |
->randomFloat | XOR [1] | DT:RandomFloat (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.44a |
--->@min | [0..1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. Default value = "0". |
1.44b |
--->@max | [1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. |
1.45 |
->variable | XOR [1] | DT:Variable (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.45a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.45b |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46 |
->outcomeMinimum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.46a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.46e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47 |
->outcomeMaximum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.47a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.47e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48 |
->testVariables | XOR [1] | DT:TestVariables (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.48a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48d |
--->@variableIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.48e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48f |
--->@baseType | [0..1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.49 |
->integerToFloat | XOR [1] | LogicSingle (Sequence) | - | - |
1.50 |
->inside | XOR [1] | Inside (Sequence) | - | - |
1.51 |
->baseValue | XOR [1] | DT:BaseValue (PT:String) | - | - |
1.51a |
--->@baseType | [1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.52 |
->patternMatch | XOR [1] | PatternMatch (Sequence) | - | - |
1.53 |
->mapResponsePoint | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.53a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.54 |
->mapResponse | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.54a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.55 |
->stringMatch | XOR [1] | StringMatch (Sequence) | - | - |
1.56 |
->repeat | XOR [1] | Repeat (Sequence) | - | - |
1.57 |
->roundTo | XOR [1] | RoundTo (Sequence) | - | - |
1.58 |
->lcm | XOR [1] | Logic1toMany (Sequence) | - | - |
1.59 |
->gcd | XOR [1] | Logic1toMany (Sequence) | - | - |
1.60 |
->min | XOR [1] | Logic1toMany (Sequence) | - | - |
1.61 |
->max | XOR [1] | Logic1toMany (Sequence) | - | - |
1.62 |
->mathConstant | XOR [1] | DT:MathConstant (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.62a |
--->@name | [1] | [ Enumeration (MathConstantNames) ] | - | Permitted values are: { pi | e }. |
1.63 |
->statsOperator | XOR [1] | StatsOperator (Sequence) | - | - |
1.64 |
->mathOperator | XOR [1] | MathOperator (Sequence) | - | - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | MediaInteraction.Type | - N/A - | -[[ Selection ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | ModalFeedback.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | NumericLogic1toMany.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
1 |
-[[ Abstract ]]- | [1..*] | -[[ Selection ]]- | - | In the model this abstract class is named: NumericExpressionGroup |
1.1 |
->sum | XOR [1] | NumericLogic1toMany (Sequence) | - | - |
1.2 |
->subtract | XOR [1] | LogicPair (Sequence) | - | - |
1.3 |
->divide | XOR [1] | LogicPair (Sequence) | - | - |
1.4 |
->multiple | XOR [1] | Logic0toMany (Sequence) | - | - |
1.5 |
->ordered | XOR [1] | Logic0toMany (Sequence) | - | - |
1.6 |
->customOperator | XOR [1] | CustomOperator (Sequence) | - | - |
1.7 |
->random | XOR [1] | LogicSingle (Sequence) | - | - |
1.8 |
->numberIncorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.8a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.8b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.8c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.9 |
->numberCorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.9a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.9b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.9c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.10 |
->numberPresented | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.10a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.10b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.10c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.11 |
->numberResponded | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.11a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.11b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.11c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.12 |
->numberSelected | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.12a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.12b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.12c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.13 |
->null | XOR [1] | PT:Empty | - | This element has no value i.e. it is empty. |
1.14 |
->delete | XOR [1] | LogicPair (Sequence) | - | - |
1.15 |
->index | XOR [1] | Index (Sequence) | - | - |
1.16 |
->power | XOR [1] | LogicPair (Sequence) | - | - |
1.17 |
->containerSize | XOR [1] | LogicSingle (Sequence) | - | - |
1.18 |
->correct | XOR [1] | DT:Correct (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.18a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.19 |
->default | XOR [1] | DT:Default (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.19a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.20 |
->integerDivide | XOR [1] | LogicPair (Sequence) | - | - |
1.21 |
->integerModulus | XOR [1] | LogicPair (Sequence) | - | - |
1.22 |
->product | XOR [1] | Logic1toMany (Sequence) | - | - |
1.23 |
->round | XOR [1] | LogicSingle (Sequence) | - | - |
1.24 |
->truncate | XOR [1] | LogicSingle (Sequence) | - | - |
1.25 |
->fieldValue | XOR [1] | FieldValue (Sequence) | - | - |
1.26 |
->randomInteger | XOR [1] | DT:RandomInteger (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.26a |
--->@min | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "0". |
1.26b |
--->@max | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1.26c |
--->@step | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "1". |
1.27 |
->variable | XOR [1] | DT:Variable (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.27a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.27b |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.28 |
->outcomeMinimum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.28a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.28b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.28c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.28d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.28e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.29 |
->outcomeMaximum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.29a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.29b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.29c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.29d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.29e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.30 |
->testVariables | XOR [1] | DT:TestVariables (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.30a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.30b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.30c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.30d |
--->@variableIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.30e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.30f |
--->@baseType | [0..1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.31 |
->integerToFloat | XOR [1] | LogicSingle (Sequence) | - | - |
1.32 |
->baseValue | XOR [1] | DT:BaseValue (PT:String) | - | - |
1.32a |
--->@baseType | [1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.33 |
->mapResponsePoint | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.33a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.34 |
->mapResponse | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.34a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.35 |
->repeat | XOR [1] | Repeat (Sequence) | - | - |
1.36 |
->roundTo | XOR [1] | RoundTo (Sequence) | - | - |
1.37 |
->lcm | XOR [1] | Logic1toMany (Sequence) | - | - |
1.38 |
->gcd | XOR [1] | Logic1toMany (Sequence) | - | - |
1.39 |
->min | XOR [1] | Logic1toMany (Sequence) | - | - |
1.40 |
->max | XOR [1] | Logic1toMany (Sequence) | - | - |
1.41 |
->mathConstant | XOR [1] | DT:MathConstant (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.41a |
--->@name | [1] | [ Enumeration (MathConstantNames) ] | - | Permitted values are: { pi | e }. |
1.42 |
->statsOperator | XOR [1] | StatsOperator (Sequence) | - | - |
1.43 |
->mathOperator | XOR [1] | MathOperator (Sequence) | - | - |
1.44 |
->randomFloat | XOR [1] | DT:RandomFloat (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.44a |
--->@min | [0..1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. Default value = "0". |
1.44b |
--->@max | [1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | OUL.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Object.Type | - N/A - | -[[ Sequence, Mixed ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | OrderInteraction.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Ordering.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | OutcomeCondition.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | OutcomeElse.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | OutcomeIf.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | OutcomeProcessing.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | OutcomeProcessingFragment.Type | - N/A - | -[[ Sequence ]]- | Prohibited | - N/A - |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | PatternMatch.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
a |
->@pattern | [1] | [ Union (StringOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:String | DT:EncVariableString }. |
1 |
-[[ Abstract ]]- | [1] | -[[ Selection ]]- | - | In the model this abstract class is named: ExpressionGroup |
1.1 |
->and | XOR [1] | Logic1toMany (Sequence) | - | - |
1.2 |
->gt | XOR [1] | LogicPair (Sequence) | - | - |
1.3 |
->not | XOR [1] | LogicSingle (Sequence) | - | - |
1.4 |
->lt | XOR [1] | LogicPair (Sequence) | - | - |
1.5 |
->gte | XOR [1] | LogicPair (Sequence) | - | - |
1.6 |
->lte | XOR [1] | LogicPair (Sequence) | - | - |
1.7 |
->or | XOR [1] | Logic1toMany (Sequence) | - | - |
1.8 |
->sum | XOR [1] | NumericLogic1toMany (Sequence) | - | - |
1.9 |
->durationLT | XOR [1] | LogicPair (Sequence) | - | - |
1.10 |
->durationGTE | XOR [1] | LogicPair (Sequence) | - | - |
1.11 |
->subtract | XOR [1] | LogicPair (Sequence) | - | - |
1.12 |
->divide | XOR [1] | LogicPair (Sequence) | - | - |
1.13 |
->multiple | XOR [1] | Logic0toMany (Sequence) | - | - |
1.14 |
->ordered | XOR [1] | Logic0toMany (Sequence) | - | - |
1.15 |
->customOperator | XOR [1] | CustomOperator (Sequence) | - | - |
1.16 |
->random | XOR [1] | LogicSingle (Sequence) | - | - |
1.17 |
->numberIncorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.17a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.17b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.17c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18 |
->numberCorrect | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.18a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.18b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.18c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19 |
->numberPresented | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.19a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.19b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.19c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20 |
->numberResponded | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.20a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.20b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.20c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21 |
->numberSelected | XOR [1] | DT:Number (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.21a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.21b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.21c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.22 |
->substring | XOR [1] | Substring (Sequence) | - | - |
1.23 |
->equalRounded | XOR [1] | EqualRounded (Sequence) | - | - |
1.24 |
->null | XOR [1] | PT:Empty | - | This element has no value i.e. it is empty. |
1.25 |
->delete | XOR [1] | LogicPair (Sequence) | - | - |
1.26 |
->match | XOR [1] | LogicPair (Sequence) | - | - |
1.27 |
->index | XOR [1] | Index (Sequence) | - | - |
1.28 |
->power | XOR [1] | LogicPair (Sequence) | - | - |
1.29 |
->equal | XOR [1] | Equal (Sequence) | - | - |
1.30 |
->contains | XOR [1] | LogicPair (Sequence) | - | - |
1.31 |
->containerSize | XOR [1] | LogicSingle (Sequence) | - | - |
1.32 |
->correct | XOR [1] | DT:Correct (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.32a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.33 |
->default | XOR [1] | DT:Default (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.33a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.34 |
->anyN | XOR [1] | AnyN (Sequence) | - | - |
1.35 |
->integerDivide | XOR [1] | LogicPair (Sequence) | - | - |
1.36 |
->integerModulus | XOR [1] | LogicPair (Sequence) | - | - |
1.37 |
->isNull | XOR [1] | LogicSingle (Sequence) | - | - |
1.38 |
->member | XOR [1] | LogicPair (Sequence) | - | - |
1.39 |
->product | XOR [1] | Logic1toMany (Sequence) | - | - |
1.40 |
->round | XOR [1] | LogicSingle (Sequence) | - | - |
1.41 |
->truncate | XOR [1] | LogicSingle (Sequence) | - | - |
1.42 |
->fieldValue | XOR [1] | FieldValue (Sequence) | - | - |
1.43 |
->randomInteger | XOR [1] | DT:RandomInteger (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.43a |
--->@min | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "0". |
1.43b |
--->@max | [1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. |
1.43c |
--->@step | [0..1] | [ Union (IntegerOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Integer | DT:VariableString }. Default value = "1". |
1.44 |
->randomFloat | XOR [1] | DT:RandomFloat (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.44a |
--->@min | [0..1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. Default value = "0". |
1.44b |
--->@max | [1] | [ Union (FloatOrVariableRef) ] | - | The value is one of the following data-type(s): {PT:Double | DT:VariableString }. |
1.45 |
->variable | XOR [1] | DT:Variable (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.45a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.45b |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46 |
->outcomeMinimum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.46a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.46b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.46d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.46e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47 |
->outcomeMaximum | XOR [1] | DT:OutcomeMinMax (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.47a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.47b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.47d |
--->@outcomeIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.47e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48 |
->testVariables | XOR [1] | DT:TestVariables (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.48a |
--->@sectionIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48b |
--->@includeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48c |
--->@excludeCategory | [0..1] | [ List (IdentifierList) ] | - | The list consist of values of data-type(s): PT:NCName. |
1.48d |
--->@variableIdentifier | [1] | DT:Identifier (PT:NCName) | - | - |
1.48e |
--->@weightIdentifier | [0..1] | DT:Identifier (PT:NCName) | - | - |
1.48f |
--->@baseType | [0..1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.49 |
->integerToFloat | XOR [1] | LogicSingle (Sequence) | - | - |
1.50 |
->inside | XOR [1] | Inside (Sequence) | - | - |
1.51 |
->baseValue | XOR [1] | DT:BaseValue (PT:String) | - | - |
1.51a |
--->@baseType | [1] | [ Enumeration (BaseType) ] | - | Permitted values are: { boolean | directedPair | duration | file | float | identifier | integer | pair | point | string | uri }. |
1.52 |
->patternMatch | XOR [1] | PatternMatch (Sequence) | - | - |
1.53 |
->mapResponsePoint | XOR [1] | DT:MapResponse (PT:Empty) | - | This derived element has no value i.e. it is empty. |
1.53a |
--->@identifier | [1] | DT:Identifier (PT:NCName) | - | - |