Author |
Colin Smythe (IMS Global, UK) |
Date |
8th June 2015 |
Release |
Final Release (Final 1.0) |
Schema Version |
IMS AFADRD APIP V1.0 PARCC 1.0 |
Namespace |
http://www.imsglobal.org/xsd/apip/apipv1p0/imsaccdrd_v2p0 |
Summary |
This document provides a checklist of the PARCCv1p0 Profile for the data model defined in the IMS Access for All Digital Resource Description (AfA DRD) 2.0 Specification. |
Recipients of this document are requested to submit, with their comments, notification of any relevant patent claims or other intellectual property rights of which they may be aware that might be infringed by any implementation of the specification set forth in this document, and to provide supporting documentation.
IMS takes no position regarding the validity or scope of any intellectual property or other rights that might be claimed to pertain to the implementation or use of the technology described in this document or the extent to which any license under such rights might or might not be available; neither does it represent that it has made any effort to identify any such rights. Information on IMS's procedures with respect to rights in IMS specifications can be found at the IMS Intellectual Property Rights web page: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf.
Copyright © 2013 IMS Global Learning Consortium. All Rights Reserved.
Use of this specification to develop products or services is governed by the license with IMS found on the IMS website: http://www.imsglobal.org/license.html.
Permission is granted to all parties to use excerpts from this document as needed in producing requests for proposals.
The limited permissions granted above are perpetual and will not be revoked by IMS or its successors or assigns.
THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTER'S OWN RISK, AND NEITHER THE CONSORTIUM, NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION.
In the following tables, three colours are used to denote standard classifications of the rows:
The key to the columns used in the following profile comparison details is:
The key to the colours used in the following profile comparison details is:
This is the "PARCCv1p0". THIS IS A PROFILE OF THE BASE SPECIFICATION. The changes to the base specification are:
The set of root attributes defined in the data model.
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
1 | accessForAllResource | [1] | Access_For_All_Resource (Sequence) | - | - |
The set of root classes (the classes for the set of root attributes) defined in the data model.
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Root | Access_For_All_Resource.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
1 |
->accessModeStatement | [0..*] | Access_Mode_Statement (Sequence) | - | - |
2 |
->controlFlexibility | [0..*] | Enumeration (Control_Flexibility_Vocabulary) | - | Permitted values are: { full keyboard control | full mouse control }. |
3 |
->hasControlFlexibilityStatement | [0..*] | PT:AnyURI | - | - |
4 |
->displayTransformability | [0..*] | Enumeration (Display_Transformability_Vocabulary) | - | Permitted values are: { font size | font face | foreground colour | background colour | cursor presentation | highlight presentation | layout | structure presentation }. |
5 |
->hasDisplayTransformabilityStatement | [0..*] | PT:AnyURI | - | - |
6 |
->colourCoding | [0..1] | PT:Boolean | - | - |
7 |
->hazard | [0..*] | Enumeration (Hazard_Vocabulary) | - | Permitted values are: { flashing | sound | olfactory | motion simulation }. |
8 |
->hasAdaptation | [0..*] | PT:AnyURI | - | - |
9 |
->hasPart | [0..*] | PT:AnyURI | - | - |
10 |
->isAdaptation | [0..1] | Is_Adaptation (Sequence) | - | - |
11 |
->isDisplayTransformabilityStatementOf | [0..1] | PT:AnyURI | - | - |
12 |
->isControlFlexibilityStatementOf | [0..1] | PT:AnyURI | - | - |
13 |
->isPartOf | [0..1] | PT:AnyURI | - | - |
14 |
->adaptationStatement | [0..*] | Adaptation_Statement (Sequence) | - | - |
15 |
->supportTool | [0..*] | Enumeration (Support_Tool_Vocabulary) | - | Permitted values are: { dictionary | calculator | note taking | peer interaction | thesaurus | abacus | spell checker | homophone checker | mind mapping software | outline tool }. |
16 |
->extension | [0..*] | PT:Namespace | - | This is a permitted extension point (element) using strict namespacing. |
The set of classes (excluding the root classes) defined in the data model.
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Access_Mode_Statement.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
1 |
->originalAccessMode | [1] | Enumeration (Access_Mode_Vocabulary) | - | Permitted values are: { auditory | tactile | textual | visual | olfactory }. |
2 |
->accessModeUsage | [0..1] | Enumeration (Access_Mode_Usage_Vocabulary) | - | Permitted values are: { informative | ornamental }. Default value = "informative". |
3 |
->extension | [0..*] | PT:Namespace | - | This is a permitted extension point (element) using strict namespacing. |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Adaptation_Statement.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
1 |
->adaptationType | [0..1] | Enumeration (Adaptation_Type_Vocabulary) | - | Permitted values are: { audio representation | tactile representation | text representation | visual representation | audio description | caption | ebook | sign language }. |
2 |
->originalAccessMode | [1] | Enumeration (Access_Mode_Vocabulary) | - | Permitted values are: { auditory | tactile | textual | visual | olfactory }. |
3 |
->extent | [0..1] | Enumeration (Extent_Vocabulary) | - | Permitted values are: { all | part }. Default value = "all". |
4 |
->representationForm | [0..*] | Enumeration (Representation_Form_Vocabulary) | - | Permitted values are: { enhanced | verbatim | reduced | real-time | transcript | alternative text | long description | talking book | Daisy | image based | symbolic | recorded | synthesized | Braille | haptic }. |
5 |
->language | [0..*] | PT:NormalizedString | - | - |
6 |
->readingRate | [0..1] | PT:Integer | - | - |
7 |
->educationLevel | [0..*] | PT:NormalizedString | - | - |
8 |
->extension | [0..*] | PT:Namespace | - | This is a permitted extension point (element) using strict namespacing. |
Identifier | Element/Attribute Name | Multiplicity | Data Type | Profile | Notes |
---|---|---|---|---|---|
Class | Is_Adaptation.Type | - N/A - | -[[ Sequence ]]- | - | - N/A - |
1 |
->isAdaptationOf | [1] | PT:AnyURI | - | - |
2 |
->extent | [1] | Enumeration (Extent_Vocabulary) | - | Permitted values are: { all | part }. Default value = "all". |
3 |
->extension | [0..*] | PT:Namespace | - | This is a permitted extension point (element) using strict namespacing. |
This is the definition of the set of primitive data-types used in this specification and its associated profiles.
Data-type Name | Description |
---|---|
AnyURI | This is mapped to the XML "xs:anyURI" data-type. |
Boolean | This is mapped to the XML "xs:boolean" data-type. |
Integer | This is mapped to the XML "xs:integer" data-type. |
Namespace | This provides a strict namespace-based extension facility. |
NormalizedString | This is mapped to the XML "xs:normalizedString" data-type. |
String | This is mapped to the XML "xs:string" data-type. |