IMS OneRoster: CSV Binding 1.2 (IMS Candidate Final Public)
Spec Version 1.2
Document Version: | 1.1 |
Date Issued: | March 8th, 2022 |
Status: | This document is for review and adoption by the IMS membership. |
This version: | https://www.imsglobal.org/spec/or/v1p2/csv/ |
Latest version: | https://www.imsglobal.org/spec/or/latest/csv/ |
Errata: | https://www.imsglobal.org/spec/or/v1p2/errata/ |
IPR and Distribution Notice
Recipients of this document are requested to submit, with their comments, notification of any relevant patent claims or other intellectual property rights of which they may be aware that might be infringed by any implementation of the specification set forth in this document, and to provide supporting documentation.
IMS takes no position regarding the validity or scope of any intellectual property or other rights that might be claimed to pertain implementation or use of the technology described in this document or the extent to which any license under such rights might or might not be available; neither does it represent that it has made any effort to identify any such rights. Information on IMS's procedures with respect to rights in IMS specifications can be found at the IMS Intellectual Property Rights webpage: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf .
Use of this specification to develop products or services is governed by the license with IMS found on the IMS website: http://www.imsglobal.org/speclicense.html.
Permission is granted to all parties to use excerpts from this document as needed in producing requests for proposals.
The limited permissions granted above are perpetual and will not be revoked by IMS or its successors or assigns.
THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTER'S OWN RISK, AND NEITHER THE CONSORTIUM, NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION.
Public contributions, comments and questions can be posted here: http://www.imsglobal.org/forums/ims-glc-public-forums-and-resources .
© 2022 IMS Global Learning Consortium, Inc. All Rights Reserved.
Trademark information: http://www.imsglobal.org/copyright.html
Abstract
The IMS OneRoster® (OR) standard addresses the exchange of student data (primarily about people, courses, enrollments and grades) between different educational systems for the specific needs of K-12. The primary use-cases are: the exchange of data between a Student Information System (SIS) and Learning Management System (LMS), and the rostering of learning tools. In OR 1.2, the service has been split into three core services:
The underlying OneRoster specification is available in:
- OR 1.2 Rostering Service Model [ORROS-SM] - to enable the exchange of information about the rostering of people in classes;
- OR 1.2 Resources Service Model [ORRES-SM] - to enable the exchange of information about the set of resources that SHOULD be made available to users, courses and classes;
- OR 1.2 Gradebook Service Model [ORGBK-SM] - to enable the exchange of information about results which may be aligned as lineItems and categories which are collections of lineItems.
The standard includes a REST-based binding to make it quicker and easier to implement the exchange of information about people, membership, courses and gradebooks. In addition to the REST binding description, a format for CSV file based exchange has also been defined: THIS DOCUMENT.
CSV files are typically exchanged between the school and the vendor to populate the roster information needed to gain access to learning tools, portals and learning environments. This specification defines how the relevant information is to be stored in a set of CSV files. This set of CSV files is exchanged as a zip file (it also contains a 'manifest.csv' file that describes the associated data CSV files). This specificatiions DOES NOT define how the zip file is moved from system to system.
1. Introduction
This Section is NORMATIVE.
1.1 Scope and Context
This document contains the description of how the OneRoster data model is exchanged in a set of CSV files. This binding addresses the format and content of the CSV files: it does NOT define how the CSV files are exchanged between end systems. The other documents that should be used with this CSV binding are:
1.2 Changes Between OR 1.1 and 1.2
The differences between versions 1.1 and 1.2 of the OR specification CSV binding are:
- The following editorial changes have been made:-
- For the purposes of easing internationalization of this specification, all references to CEDS have been removed from the data model descriptions. Usage of the appropriate vocabularies are discussed in the Implementation Guide [OR-IG] and any appropriate profiling documents;
- The following CSV files have been added:-
- 'userProfiles.csv'
- 'roles.csv'
- 'userResources.csv'
- 'scoreScales.csv'
- 'lineItemScales.csv'
- 'resultScales.csv'
- 'lineItemLearningObjectiveIds.csv'
- 'resultearningObjectiveIds.csv'
- The following changes have been made to the 'manifest.csv' file:-
- Rows for the eight new CSV files have been added
- The 'oneroster.version' row is required to have a value of '1.2' when referring to an OR 1.2 compliant manifest
- The following changes have been made to the 'categories.csv' file:-
- The 'weight' column has been added
- The following changes have been made to the 'demographics.csv' file:-
- The enumerated vocabulary for the 'sex' column is now permitted to have new values of 'other and 'unspecified'
- The following changes have been made to the 'lineItems.csv' file:-
- The 'schoolSourcedId' column has been added
- The 'gradingPeriodSourcedId' column has been renamed 'academicSessionSourcedId'
- The 'resultValueMin' and 'resultValueMax' attributes have been made optional
- The following changes have been made to the 'results.csv' file:-
- The 'classSourcedId' and 'textScore' columns have been added
- The permitted tokens in the 'scoreStatus' column has been expanded with new values of { late | incomplete | missing | withdrawal | in progress }
- Use of the 'score' column has been made OPTIONAL.
- The following changes have been made to the 'users.csv' file:-
- The 'orgSourcedIds' column has been removed (org identification is now achieved via the 'roles.csv' file)
- The 'role' column has been removed (role allocation is now achieved via the 'roles.csv' file)
- The 'preferredGivenName', 'preferredMiddleName' and 'preferredFamilyName' columns have been added
- The 'primaryOrgSourcedId' column has been added
- The 'userMasterIdentifier' column has been added.
1.3 Conformance Statements
As well as sections marked as non-normative, all authoring guidelines, diagrams, examples, and notes in this specification are non-normative. Everything else in this specification is normative.
The key words MAY, MUST, MUST NOT, OPTIONAL, RECOMMENDED, REQUIRED, SHALL, SHALL NOT, SHOULD, and SHOULD NOT in this document are to be interpreted as described in [RFC2119].
An implementation of this specification that fails to implement a MUST/REQUIRED/SHALL requirement or fails to abide by a MUST NOT/SHALL NOT prohibition is considered nonconformant. SHOULD/SHOULD NOT/RECOMMENDED statements constitute a best practice. Ignoring a best practice does not violate conformance but a decision to disregard such guidance should be carefully considered. MAY/OPTIONAL statements indicate that implementers are entirely free to choose whether or not to implement the option.
The Conformance and Certification Guide for this specification may introduce greater normative constraints than those defined here for specific service or implementation categories.
1.4 Structure of this Document
The structure of the rest of this document is:
2. CSV OVERVIEW | An overview of the structure of the CSV binding for OneRoster. |
3. CSV CSV FORMAT | The detailed format for the data in the CSV files for OneRoster. |
APPENDIX A – THE FILE DEPENDENCY MATRIX | An explanation of the file dependencies when exchanging bulk processing based CSV files. |
APPENDIX B – REVISION HISTORY | History of the various published versions of this document. This includes details of the changes made with respect to the previously published version. |
APPENDIX C – REFERENCES | The details of the set of documents cited within this document. |
APPENDIX D – LIST OF CONTRIBUTORS | The people who were responsible for the creation of this document. |
1.5 Acronyms
- API
- Application Programming Interface
- BOM
- Beginning of Message
- CASE
- Compentencies and Academic Standards Exchange
- CEDS
- Common Education Data Standards
- CSV
- Comma Separated Values
- GUID
- Globally Unique Identifier
- IETF
- Internet Engineering Task Force
- LDAP
- Lightweight Directory Access Protocol
- LIS
- Learning Information Services
- LMS
- Learning Management System
- LOR
- Learning Object Repository
- LTI
- Learning Tools Interoperability
- RFC
- Request For Comment
- URN
- Uniform Resource Name
- UTF
- Unicode Transformation Format
- UUID
- Universally Unique Identifier
2. CSV Overview
This Section is NORMATIVE.
2.1 Binding of the Data
Many districts currently provide student information to tool providers and LMS/LOR vendors as ‘.csv’ formatted files. For those districts that must continue to use CSV files to exchange roster information with vendors, the format defined in the Tables in Section 3 should be used: this format corresponds to the data models in the OneRoster 1.2 Rostering [ORROS-SM], Resources [ORRES-SM] and Gradebook [ORGBK-SM] documents. Districts can choose to upload class rosters/gradebooks by preparing up to twenty (20) files in CSV format outlined in this document. The rosters/gradebooks could be available for both import and export. A summary of the set of files is given in Table 2.1.
CSV File Name | Required | Description |
---|---|---|
manifest.csv | Yes | A control file. The manifest contains the OR version (set as 1.2 for this release of the standard) and the list of files that are supplied in this data set. |
academicSessions.csv | No | A data file. The 'academic sessions' data model content. |
categories.csv | No | A data file. The 'categories' data model content. |
classes.csv | No | A data file. The 'classes' data model content. |
classResources.csv | No | A data file. The links between the 'classes' and 'resources' data model content. |
courseResourses.csv | No | A data file. The links between the 'courses' and 'resources' data model content. |
courses.csv | No | A data file. The 'courses' data model content. |
demographics.csv | No | A data file. The 'demographics' data model content. Data model revised in v1.2. |
enrollments.csv | No | A data file. The 'enrollments' data model content. |
lineItemLearningObjectiveIds.csv* | No | A data file. The 'learning objectives' mapping to 'lineItems' data model content. A new file added in v1.2. |
lineItems.csv | No | A data file. The 'lineItems' data model content. Data model revised in v1.2. |
lineItemScoreScales.csv* | No | A data file. The 'score scales' mapping to 'lineItems' data model content. A new file added in v1.2. |
orgs.csv | No | A data file. The 'orgs' data model content. |
resources.csv | No | A data file. The 'resource' data model content. |
resultLearningObjectiveIds.csv* | No | A data file. The 'learning objectives' mapping to 'results' data model content. A new file added in v1.2. |
results.csv | No | A data file. The 'results' data model content. Data model revised in v1.2. |
resultScoreScales.csv* | No | A data file. The 'score scales' mapping to 'results' data model content. A new file added in v1.2. |
roles.csv* | No | A data file. The mapping between roles, orgs and accounts data model content. A new file added in v1.2. |
scoreScales.csv* | No | A data file. The 'score scales' data model content. A new file added in v1.2. |
userProfiles.csv* | No | A data file. The userProfiles' data model content. A new file added in v1.2. |
userResources.csv* | No | A data file. The userResources' data model content. A new file added in v1.2. |
users.csv | No | A data file. The 'users' data model content. Data model revised in v1.2. |
KEY:
- CSV File Name – the name of the CSV file;
- Required – denotes whether or not the CSV file MUST be supplied (Yes or No);
- Description – a statement of the content in the file;
- '*' denotes files added in the V1.2 release.
When data is exchanged there will be 1-22 CSV files. An exchange MUST include the 'manifest.csv' file. The case of when only the 'manifest.csv' is supplied is used to denote that no updates occurred. At most, 22 CSV files exchanged i.e. there MUST NOT be more than one of each of the data CSV files. When the set of files are for bulk processing they must be semantically consistent i.e. every object referenced in a file must also be defined in either the same, or one of the other files in the zip package (see Appendix A for more details on this set of file dependencies).
2.2 Exchanging the CSV Files
For V1.2 the CSV files will be exchanged as a zip file. The encompassed files must be at the root level i.e. they MUST NOT be contained within an enclosing directory. There is NO constraint on the name of the zip file but it must have a file extension of ‘zip’. The compression MUST conform to [RFC1951].
2.3 Compatibility Between V1.0, V1.1 and V1.2
A system that imports both V1.0, V1.1 and V1.2 compliant data sets must differentiate using the following algorithm:
- If a 'manifest.csv' file is present then the data set conforms to V1.1 and/or V1.2 (this must be assumed even if the rest of the file set conforms to OneRoster 1.0 definitions and the appropriate error messages must be produced but the subsequent processing is implementation dependent). The manifest file contains the list of CSV files that MUST also accompany the manifest file. If the set of supplied files differs from the list of files in the manifest then an import error should be reported and the system is permitted to process the data as defined by the implementation;
- If a 'manifest.csv' file is NOT present then, under normal operations, the data set conforms to V1.0. Seven data files MUST be supplied i.e. one file for each of the data models (there MUST NOT be any of the new CSV data files introduced in V1.1/V1.2). If a file is missing then an error should be reported and the system is permitted to process the data as defined by the implementation. In the case where the 'manifest.csv' file is missing but the file set conforms to OneRoster 1.1/1.2 then the appropriate error message should be produced and the subsequent processing is implementation dependent.
2.4 Bulk/Delta Behavior Constraints
The existence and management of a record is controlled via the bulk and delta processing options. A record can be in four possible states:
- 'No Record' – the record has not been created or it did exist but the system has deleted the record and it cannot be recovered with the previously assigned sourcedId;
- 'Record[-]' – the record has been created and assigned a sourcedId but it has not yet been activated;
- 'Record[Active]' – the record status has been set to 'active';
- 'Record[ToBeDeleted]' – the record status has been set of 'tobedeleted'.
For each state there are four possible types of transition events:
- B[-] – a bulk transfer has occurred and an existing record (one with a sourcedId) does not appear in those files;
- B[S] – a bulk transfer has occurred and the record occurs in the new file set;
- D[A] – a delta transfer has occurred and the record status is set as 'active';
- D[D] – a delta transfer has occurred and the record status is set as 'tobedeleted'.
The 'System Deletes the Record' transition is only possible when the record is in the state of 'Record[ToBeDeleted]'. For this transition the system deletes the record (the length of time between this deletion action and the record being set as 'tobedeleted' is implementation dependent).
The state diagram for the creation and management of a record in a service provider is shown in Figure 1.

A OneRoster Service Consumer could issue a 'HTTP GET' request for the record in each of these four states. When such a read request is made the request will result in the following payloads:
- 'No Record' – in the case of a single record request a 404 response will be returned;
- 'Record[-]' – the record will be returned with an empty 'status' field and an empty 'dateLastModified' field;
- 'Record[Active]' – the record will be returned with a 'status' field value of 'active' and the 'dateLastModified' field set to the time the record was last changed;
- 'Record[ToBeDeleted]' – the record will be returned with a 'status' field value of 'tobedeleted' and the 'dateLastModified' field set to the time the record was last changed.
3. CSV Format
This Section is NORMATIVE.
The file format for each of the data files is a Comma Separated Values (CSV) format as specified in [RFC4180] with the extra restriction that carriage-returns are not permitted within a field. Fields containing commas and double-quotes must be enclosed in double-quotes. If double-quotes are used to enclose a field, then a double-quote appearing inside the field must be escaped by preceding it with another double-quote.
The CSV files must be UTF-8 encoded [RFC3629]. Importing processors must tolerate BOM (Byte Order Mark) prefixes and ignore them. In a UTF-8 encoded file with a BOM, the BOM will appear as the 3-byte sequence ‘EF BB BF’ at the beginning of the file. If present, the CSV header will begin at the 4th byte of the file; if not present, the CSV header will begin at the 1st byte of the file.
Other key points are:
- All header names and content values within the CSV file are case-sensitive. Incorrect case will result in conformance failure and should be logged as a detected error;
- The Header row for each file is required;
- The Header fields for a file must be supplied in the same order as defined in the tables below. If metadata extension fields are used, then they must be added to the right of the defined data fields in the specification, as the last set of columns. This ensures that the sequence of the defined data fields remains fixed irrespective of the presence or not of metadata fields;
- Header field names must be uniquely named within a file;
- Files that contain no data rows are NOT permitted;
- For ALL fields that are optional and which have a defined enumeration token set, then the value of NULL/blank (i.e. a blank value "") is permitted to denote that NO data is supplied;
- The support of ALL string-based data-types requires that a maximum length of at least 255 must be supported by implementations. If string lengths of greater than 255 are used then system may lose some part of the string without failing conformance.
When mapping from the data model [ORROS-SM], [ORRES-SM], [ORGBK-SM] to the equivalent column headers the following special rules have been applied:
- When referencing an object in the data model (using the data-type GUIDRef) the name has been extended using SourcedId e.g. 'org' to 'orgSourcedId';
- When referring to a set of objects in the data model maps to a comma separated list, enclosed in quotation marks, under the corresponding column header (as per [RFC4180]);
- The references to resources in the Class and Course data models have NOT been mapped (instead the two CSV files 'classResources.csv' and 'courseResources.csv' are used).
CSV import/export is envisaged to work in one of two ways, bulk and delta:
- In BULK processing, the CSV files MUST NOT contain values in the "dateLastModified" and "status" fields. That is to say, for each row, there will be no data for either of these fields. Importing Systems MUST view this incoming data as the reference version of all data. That is to say, if records that were previously imported do not appear in this bulk csv file, then the importing system should internally mark those records as 'tobedeleted' with the 'dateLastModified' value set to the time of the bulk files import processing. If said records subsequently appear in a future bulk file, then those records should be updated and made active. When a set of Bulk files are created they must be semantically complete i.e. every object referenced by another object MUST also be defined in the corresponding source CSV file and included with the 'manifest.csv' file;
- In DELTA processing, the incoming CSV file MUST contain values in the "dateLastModified" and "status" fields. That is to say, each row in the CSV file should include data describing that (the row) data was last modified and its status. Importing systems must view this incoming delta file as changes to the reference data, and should make the appropriate changes, deletions and insertions of the new data.
The key to the CSV description tables listed in Subsections 3.2 to 3.20 is:
- Field Header – the name for the Column Header;
- Required – denotes if data must be present. The meanings for this field are:-
- 'Yes' for fields which are always required
- 'Yes for Delta' for fields which must be populated for Delta processing, and which must be blank for Bulk processing
- 'No' for fields which do not require to have values;
- Format – the data-type for the data:-
- 'GUID' denotes some form of globally unique identifier (this must be less than 256 characters). This is not restricted to the 128 bit UUID format but MUST contain ONLY the characters '0-1 | a-Z | A-Z | . | - | _ | / | @' (the '|' character is being used as a separator in the expression)
- 'GUID Reference' denotes the GUID of an object defined in some other CSV data file (this is limited to the same set of characters as per a 'GUID')
- 'UUID Reference' denotes the UUID of the referenced object (this must be a valid 128 bit UUID)
- 'List of GUID Reference' denotes a comma-delimited list of GUID References of objects defined in another CSV data file
- 'ID' denotes an identifier defined outside of the OneRoster specification, e.g. identifiers generated by vendors for their resources in the Resources dataset
- 'String' denotes a sequence of characters that should follow the description. Generally this is aimed to be human-readable e.g. "Science Lesson"
- 'List of Strings' denotes a sequence of Strings. The individual strings within the list must not contain commas, and the list is a comma separated list e.g. "1,2,3". If a List of Strings contains more than one element, then it must be double-quote encapsulated
- 'Enumeration' denotes a fixed set of values that will be referred to in the description. In the case of fields which are not required, an empty field denotes no value
- 'Enumeration List' denotes a list of Enumerations. The list is comma separated e.g. "teacher,student,aide"
- 'Float' denotes a floating point number
- 'DateTime' denotes a timestamp format. DateTimes MUST be expressed in W3C profile of ISO 8601 [ISO8601] and MUST contain the UTC timezone e.g. "2012-04-23T18:25:43.511Z"
- 'Date' denotes a date format. Dates MUST be expressed using ISO 8601 format [ISO8601], more commonly formatted as "YYYY-MM-DD" e.g. "2002-04-23"
- 'Year' denotes a date format of year only. Years MUST be expressed using ISO 8601 format [ISO8601], more commonly formatted as "YYYY" e.g. "2002";
- Example/Description – an example of the expected data, and a brief statement of the nature of the content.
3.1 'manifest.csv'
NOTE: The manifest file will consist of just two columns with the headers ‘propertyName’ and ‘value’. Each row will contain a single property/value pair. The list of supported property/value pairs is described in Table 3.1.
Property Name (One per row) |
Required | Format | Value Description |
---|---|---|---|
manifest.version | Yes | String | The version of the manifest. For an initial value this must be “1.0”. |
oneroster.version | Yes | String | The OneRoster version supported by this file set. This must be “1.2” for implementations of this version of the specification. |
file.academicSessions | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.categories | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.classes | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.classResources | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.courses | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.courseResources | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.demographics | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.enrollments | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.lineItemLearningObjectiveIds* | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.lineItems | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.lineItemScoreScales* | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.orgs | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.resources | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.resultLearningObjectiveIds* | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.results | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.resultScoreScales* | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.roles* | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.scoreScales* | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.userProfiles* | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.userResources* | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
file.users | Yes | Enumeration | Permitted values of: { absent | bulk | delta }. |
source.systemName | No | String | The name for the system producing the set of files. |
source.systemCode | No | String | Identification code for the system producing the set of files. |
The '*' denotes the rows that have been added in OR 1.2. In the enumerations in Table 3.1 the interpretations for each permitted value are:
- 'absent' – the CSV file is not supplied;
- 'bulk' – the CSV file contains only bulk data;
- 'delta' – the CSV file contains only delta data.
These processing mode hints should be consistent with the data held within the accompanying CSV files but in cases of conflict the values in the data CSV files must take precedence.
3.2 'academicSessions.csv'
This file represents the AcademicSessions dataset from the OneRoster Rostering specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the academic session. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
title | Yes | String | Name or title of the academic session. |
type | Yes | Enumeration | Permitted values of: { gradingPeriod | semester | schoolYear | term } This vocabulary may be extended. |
startDate | Yes | Date | Inclusive end date for the academic session. ISO 8601 format [ISO8601]. |
endDate | Yes | Date | Exclusive end date for the academic session. ISO 8601 format [ISO8601]. |
parentSourcedId | No | GUID Reference. | SourcedId of the parent of this academic session. |
schoolYear | Yes | Year | The school year for which the academic session contributes. This year should be that in which the school year ends (Format is: YYYY). |
The dependencies of this file on other files when supporting bulk processing are:
- Other academicSessions could be referenced in the SAME file through the 'parentSourcedId' attribute. Therefore, for semantic consistency there are NO dependencies on OTHER files.
3.3 'categories.csv'
This file represents the Categories dataset from the OneRoster Gradebook specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the category. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
title | Yes | String | The title assigned to the set of lineItems to denote its nature e.g. homework, essays, etc. |
weight | No | Integer | Total weight of this grading category in calculation of course final score. This is a Percent value only, e.g. 80%. This is a new column added in version 1.2. |
There are NO dependencies of this file on other files when supporting bulk processing.
3.4 'classes.csv'
This file represents the Classes dataset from the OneRoster Rostering specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the class. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
title | Yes | String | Name of this class. |
grades | No | List of Strings | Grade(s) for which the class is attended. The permitted vocabulary should be agreed as part of the definition of the usage of this specification. |
courseSourcedId | Yes | GUID Reference | SourcedId of the course of which this class is an instance. |
classCode | No | String | Human readable code used to help identify this class. |
classType | Yes | Enumeration | The permitted values are: { homeroom | scheduled } This vocabulary may be extended. |
location | No | String | Human readable description of where the class is physically located. |
schoolSourcedId | Yes | GUID Reference. | SourcedId of the Org that teaches this class of OrgType 'school'. |
termSourcedIds | Yes | List of GUID References. | SourcedIds of the terms (the academicSessions) in which the class is taught. |
subjects | No | List of Strings | Subject name(s) in human readable form. If the 'subjectCodes' attribute is present then the subjects and subjectCodes lists must have the same length and have order significance.
The permitted vocabulary should be agreed as part of the definition of the usage of this specification. If the value of the "Course Title" contains commas, then those commas must be removed. |
subjectCodes | No | List of Strings | Subject codes(s) in machine readable form. If more than one subject code is needed, use double quotes, and separate with commas (per [RFC4180]). If the 'subjects' attribute is present the two lists must have the same length and have order significance. The permitted vocabulary should be agreed as part of the definition of the usage of this specification. |
periods | No | List of Strings | The time slots in the day that the class will be given. If more than one period is needed, use double quotes, and separate with commas (per [RFC4180]). Examples: 1; “1,3,5” |
The dependencies of this file on other files when supporting bulk processing are:
- This requires a reference to the associated terms (academicSessions) using the ‘termSourcedIds’ attribute. This produces a dependency on the academicSessions.csv;
- This requires a reference to the associated course (course) using the ‘courseSourcedId’ attribute. This produces a dependency on the courses.csv;
- This requires a reference to the associated school (org) using the ‘schoolSourcedId’ attribute. This produces a dependency on the orgs.csv.
3.5 'classResources.csv'
This file represents the links between the Resources and Classes datasets from the OneRoster Rostering and Resources specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the classResource relationship. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
title | No | String | Name of the related class. |
classSourcedId | Yes | GUID Reference. | SourcedId of the reference Class. |
resourceSourcedId | Yes | GUID Reference. | SourcedId of the Resource associated with the Class. |
The dependencies of this file on other files when supporting bulk processing are:
- This requires a reference to the associated class (class) using the 'classSourcedId' attribute. This produces a dependency on the classes.csv. This dependency on the class leads to the corresponding dependencies on the academicSessions.csv, courses.csv and orgs.csv files;
- This requires a reference to the associated resource (resource) using the ‘resourceSourcedId’ attribute. This produces a dependency on the resources.csv.
3.6 'courseResources.csv'
This file represents the links between the Resources and Courses datasets from the OneRoster Rostering and Resources specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the courseResourse relationship. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
title | No | String | Name of the related class. |
courseSourcedId | Yes | GUID Reference. | SourcedId of the reference Course. |
resourceSourcedId | Yes | GUID Reference. | SourcedId of the Resource associated with the Course. |
The dependencies of this file on other files when supporting bulk processing are:
- This requires a reference to the associated course (course) using the 'courseSourcedId' attribute. This produces a dependency on the courses.csv. This dependency on the course leads to the corresponding dependencies on the academicSessions.csv and orgs.csv files;
- This requires a reference to the associated resource (resource) using the ‘resourceSourcedId’ attribute. This produces a dependency on the resources.csv.
3.7 'courses.csv'
This file represents the Courses dataset from the OneRoster Rostering specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the course. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
schoolYearSourcedId | No | GUID Reference. | SourcedId of the associated AcademicSession with type of 'schoolYear'. |
title | Yes | String | Name of this course. |
courseCode | No | String | Human readable code used to help identify this course. |
grades | No | List of Strings | Grade(s) for which the class is attended. The permitted vocabulary should be agreed as part of the definition of the usage of this specification. |
orgSourcedId | Yes | GUID Reference. | SourcedId of an org to which this course belongs. |
subjects | No | List of Strings | Subject name(s) in human readable form. If the 'subjectCodes' attribute is present then the subjects and subjectCodes lists must have the same length and have order significance.
The permitted vocabulary should be agreed as part of the definition of the usage of this specification. If the value of the "Course Title" contains commas, then those commas must be removed. |
subjectCodes | No | List of Strings | Subject codes(s) in machine readable form. If more than one subject code is needed, use double quotes, and separate with commas (per [RFC4180]). If the 'subjects' attribute is present the two lists must have the same length and have order significance. The permitted vocabulary should be agreed as part of the definition of the usage of this specification. |
The dependencies of this file on other files when supporting bulk processing are:
- This requires a reference to the associated school year (academicSession) using the ‘schoolYearSourcedId’ attribute. This produces a dependency on the academicSessions.csv;
- This requires a reference to the associated orgaization (org) using the ‘orgSourcedId’ attribute. This produces a dependency on the orgs.csv.
3.8 'demographics.csv'
This file represents the Demographics dataset from the OneRoster Rostering specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the demographics. This MUST be the 'sourcedId' of the User whose demographics are being described. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
birthDate | No | Date | The date of birth. ISO 861 format: 'YYYY-MM-DD'. |
sex | No | Enumeration | Permitted values are: { male | female | unspecified | other }. The terms 'unspecified' and 'other' added in Version 1.2. This vocabulary may be extended. |
americanIndianOrAlaskaNative | No | Boolean | Permitted values are: { true | false } |
asian | No | Boolean | Permitted values are: { true | false } |
blackOrAfricanAmerican | No | Boolean | Permitted values are: { true | false } |
nativeHawaiianOrOtherPacificIslander | No | Boolean | Permitted values are: { true | false } |
white | No | Boolean | Permitted values are: { true | false } |
demographicRaceTwoOrMoreRaces | No | Boolean | Permitted values are: { true | false } |
hispanicOrLatinoEthnicity | No | Boolean | Permitted values are: { true | false } |
countryOfBirthCode | No | String | Country where the user was born. The permitted vocabulary should be agreed as part of the definition of the usage of this specification. |
stateOfBirthAbbreviation | No | String | State where the user was born. The permitted vocabulary should be agreed as part of the definition of the usage of this specification. |
cityOfBirth | No | String | City where the user was born. |
publicSchoolResidenceStatus | No | String | An indication of the location of the users legal residence relative to (within or outside) the boundaries of the public school attended and its administrative unit. The permitted vocabulary should be agreed as part of the definition of the usage of this specification. |
The dependencies of this file on other files when supporting bulk processing are:
- This requires a reference to the associated user using the 'sourcedId' attribute. This produces a dependency on the users.csv. This creates a corresponding dependency on the orgs.csv, roles.csv and userProfiles.csv files.
3.9 'enrollments.csv'
This file represents the Enrollments dataset from the OneRoster Rostering specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the enrolment. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
classSourcedId | Yes | GUID Reference | SourcedId of the Class. |
schoolSourcedId | Yes | GUID Reference | SourcedId of an Org with type ‘school’. |
userSourcedId | Yes | GUID Reference | SourcedId of the User. |
role | Yes | Enumeration | Permitted values are: { administrator | aide | guardian | parent | proctor | relative | student | teacher }. This vocabulary may be extended. |
primary | No | Boolean | Permitted values are: { true | false }. Applicable only to teachers. Only one teacher should be designated as the primary teacher for a class in the period defined by the begin/end dates. |
beginDate | No | Date | The start date for the enrollment (inclusive). This date must align with the associated academic session (term) identified in the class. |
endDate | No | Date | The end date for the enrollment (exclusive). This date must align with the associated academic session (term) identified for the class. |
The dependencies of this file on other files when supporting bulk processing are:
- This requires a reference to the associated class (class) using the 'classSourcedId' attribute. This produces a dependency on the classes.csv. This creates a corresponding dependency on the academicSessions.csv and courses.csv files. The courses dependency creates a further set of dependencies on the on the academicSessions.csv and orgs.csv files;
- This requires a reference to the associated school (org) using the 'schoolSourcedId' attribute. This produces a dependency on the orgs.csv;
- This requires a reference to the associated user (user) using the 'userSourcedId' attribute. This produces a dependency on the users.csv. This creates a corresponding dependency on the orgs.csv, roles.csv and userProfiles.csv files.
3.10 'lineItemLearningObjectiveIds.csv'
A new file added in version 1.2.
This file represents the mapping between LineItems and the corresponding Learning Objectives in the OneRoster Gradebook specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the lineItem learning objective relationship. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
lineItemSourcedId | Yes | GUID Reference | SourcedId of the parent LineItem for this learning objective. |
source | Yes | Enumeration. | The type of learning objective identifiers. Enumeration of: { case | unknown }. 'case' is used to denote an IMS CASE identifier. This vocabulary may be extended. |
learningObjectiveId | Yes | String | Unique identifier for the associated learning objective. If an IMS CASE identifier then it MUST be a valid UUID URN. |
The dependencies of this file on other files when supporting bulk processing are:
- This requires a reference to the associated lineItem using the 'lineItemSourcedId' attribute. This produces a dependency on the lineItems.csv. This dependency leads to the corresponding dependencies on the categories.csv, academicSessions.csv, classes.csv, courses.csv and orgs.csv files.
3.11 'lineItems.csv'
This file represents the LineItems dataset from the OneRoster Gradebook specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the lineItem. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
title | Yes | String | The title assigned to the lineItem. |
description | No | String | Short description of the role of the lineItem. |
assignDate | Yes | Date | Date the associated activity was assigned. |
dueDate | Yes | Date | Date the associated activity is due to be completed. |
classSourcedId | Yes | GUID Reference | SourcedId of the Class. |
categorySourcedId | Yes | GUID Reference | SourcedId of the Category. |
academicSessionSourcedId | Yes | GUID Reference | SourcedId of the academicSession to which the lineItem is based. |
resultValueMin | No | Float | The minimum value permitted for the score (inclusive) e.g. 0.0. |
resultValueMax | No | Float | The maximum value permitted for the score (inclusive) e.g. 100.0. |
schoolSourcedId | Yes | GUID Reference | SourcedId of the School. This is a new column added in version 1.2. |
The dependencies of this file on other files when supporting bulk processing are:
- This requires a reference to the associated class (class) using the 'classSourcedId' attribute. This produces a dependency on the classes.csv. This creates a corresponding dependency on the academicSessions.csv and courses.csv files. The courses dependency creates a further set of dependencies on the on the academicSessions.csv and orgs.csv files;
- This requires a reference to the associated category (category) using the 'categorySourcedId' attribute. This produces a dependency on the categories.csv;
- This requires a reference to the associated grading period (academicSession) using the 'gradingPeriodSourcedId' attribute. This creates a dependency on the academicSessions.csv file.
3.12 'lineItemScoreScales.csv'
A new file added in version 1.2.
This file represents the mapping between the LineItems and ScoreScales datasets from the OneRoster Gradebook specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the lineItem scoreScale. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
title | No | String | Name of the related scoreScale. |
lineItemSourcedId | Yes | GUID Reference. | SourcedId of the reference LineItem. |
scoreScaleSourcedId | Yes | GUID Reference. | SourcedId of the reference ScoreScale. |
The dependencies of this file on other files when supporting bulk processing are:
- This requires a reference to the associated lineItem using the 'lineItemSourcedId' attribute. This produces a dependency on the lineItems.csv. This dependency leads to the corresponding dependencies on the categories.csv, academicSessions.csv, courses.csv and orgs.csv files;
- This requires a reference to the associated scoreScale using the ‘scoreScaleSourcedId’ attribute. This produces a dependency on the scoreScales.csv. This dependency leads to the corresponding dependencies on the academicSessions.csv, classes.csv, courses.csv and orgs.csv files.
3.13 'orgs.csv'
This file represents the Orgs dataset from the OneRoster Rostering specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the org. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
name | Yes | String | Name of the organization. |
type | Yes | Enumeration | Permitted values are: { department | school | district | local | state | national } This vocabulary may be extended. |
identifier | No | String | Human readable identifier for this org e.g. NCES ID. |
parentSourcedId | No | GUID Reference. | SourcedId of an Org representing the Parent organization. |
The dependencies of this file on other files when supporting bulk processing are:
- Other orgs could be referenced in the SAME file through the ‘parentSourcedId’ attribute. Therefore, for semantic consistency there are NO dependencies on OTHER files.
3.14 'resources.csv'
This file represents the Resources dataset from the OneRoster Resources specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the resource. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
vendorResourceId | Yes | ID | Unique ID of this resource as allocated by the vendor. It is unique in the context of resource identifiers allocated by the vendor. |
title | No | String | Name of this resource. |
roles | No | Enumeration List | A comma separated list with permitted values are: { administrator | aide | guardian | parent | proctor | relative | student | teacher } This vocabulary may be extended. |
importance | No | Enumeration | Permitted values are: { primary | secondary }. |
vendorId | No | ID | Identifier of the vendor responsible for this resource. This unique ID will be assigned by IMS during the OneRoster conformance process. |
applicationId | No | ID | Identifier of the application associated with this resource. This identifier is assigned by the creator/vendor of the resource. |
There are NO dependencies of this file on other files when supporting bulk processing.
3.15 'resultLearningObjectiveIds.csv'
A new file added in version 1.2.
This file represents the mapping between Results and the corresponding Learning Objectives in the OneRoster Gradebook specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the result learning objective relationship. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
resultSourcedId | Yes | GUID Reference | SourcedId of the parent Result for this learning objective. |
source | Yes | Enumeration | The type of learning objective identifiers. Enumeration of: { case | unknown }. 'case' is used to denote an IMS CASE identifier. This vocabulary may be extended. |
learningObjectiveId | Yes | String | Unique identifier for the associated learning objective. If a CASE identifier then it MUST be a valid UUID URN. |
score | No | Float | The optional mastery score supplied as a numeric value. |
textScore | No | String | The optional mastery score supplied as a string. |
The dependencies of this file on other files when supporting bulk processing are:
- This requires a reference to the associated lineItem using the 'resultSourcedId' attribute. This leads to the corresponding dependencies on the users.csv, classes.csv, lineItems.csv, categories.csv, academicSessions.csv, courses.csv and orgs.csv files.
3.16 'results.csv'
This file represents the Results dataset from the OneRoster Gradebook specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the result. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
lineItemSourcedId | Yes | GUID Reference | Unique identifier of the lineItem. |
studentSourcedId | Yes | GUID Reference | Unique identifier of the student (user). References a record that is/was created in the users.csv file with type of 'student'. |
scoreStatus | Yes | Enumeration | Permitted values are: { exempt | fully graded | not submitted | partially graded | submitted } This vocabulary may be extended. |
score | No | Float | A floating point number (the range should be consistent with that defined in the associated lineItem resultValueMin and resultValueMax fields). |
scoreDate | Yes | Date | The date the result was submitted and/or the 'scoreStatus' was changed. |
comment | No | String | Human readable comment about the result. |
textScore | No | String | An optional non-numeric score value. If a scoreScale is assigned then the value must align with the scale. This is a new column added in version 1.2. |
classSourcedId | No | GUID Reference | Unique identifier of the class. References a record that is/was created in the classes.csv file. This is a new column added in version 1.2. |
inProgress | No | Boolean | Permitted values are: { true | false }. Denotes that work has been assigned and the student's work product is not yet expected to have been submitted. This is a new column added in version 1.2. |
incomplete | No | Boolean | Permitted values are: { true | false }. Denotes that the student's work product has been submitted but deemed incomplete by the teacher. This is a new column added in version 1.2. |
late | No | Boolean | Permitted values are: { true | false }. Denotes that the student's work product is either past due or it has been submitted past the due date. The score on this result may be impacted as as result of this flag. This is a new column added in version 1.2. |
missing | No | Boolean | Permitted values are: { true | false }. Denotes that the student's work product has not been submitted. This is a new column added in version 1.2. |
The dependencies of this file on other files when supporting bulk processing are:
- This requires a reference to the associated lineItem using the 'lineItemSourcedId' attribute. This produces a dependency on the lineItems.csv. This creates a corresponding dependency on the academicSessions.csv, classes.csv, courses.csv, orgs.csv and categories.csv files;
- This requires a reference to the associated student (user) using the 'studentSourcedId' attribute. This produces a dependency on the users.csv. This creates a corresponding dependency on the orgs.csv, roles.csv and userProfiles.csv files.
3.17 'resultScoreScales.csv'
A new file added in version 1.2.
This file represents the mapping between the Results and ScoreScales datasets from the OneRoster Gradebook specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the resultScoreScale. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
title | No | String | Name of the related scoreScale. |
resultSourcedId | Yes | GUID Reference. | SourcedId of the reference Result. |
scoreScaleSourcedId | Yes | GUID Reference. | SourcedId of the reference ScoreScale. |
The dependencies of this file on other files when supporting bulk processing are:
- This requires a reference to the associated lineItem using the 'resultSourcedId' attribute. This produces a dependency on the results.csv. This leads to the corresponding dependencies on the users.csv, classes.csv, lineItems, categories.csv, academicSessions.csv, courses.csv and orgs.csv files;
- This requires a reference to the associated scoreScale using the ‘scoreScaleSourcedId’ attribute. This produces a dependency on the scoreScales.csv. This leads to the corresponding dependencies on the academicSessions.csv, classes.csv, courses.csv and orgs.csv files.
3.18 'roles.csv'
A new file added in version 1.2.
The set of roles for a user in an org. A user can have 1-many roles in 1-many orgs. This is defined as a set of 1-1 mappings.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the role. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
userSourcedId | Yes | GUID Reference | The user whose role is being defined. |
roleType | Yes | Enumeration | Determines if this is the primary role. Only one role per orgnaization can be 'primary'. Permitted values are: { primary | secondary } |
role | Yes | Enumeration | The type of role. Permitted values are: { administrator | aide | guardian | parent | proctor | relative | student | teacher } This vocabulary may be extended. |
beginDate | No | Date | The start date on which the role became active (inclusive). |
endDate | No | Date | The end date on which the role ceased to be active (exclusive). |
orgSourcedId | Yes | GUID Reference | SourcedId of the Org within which the User has the assigned role. |
userProfileSourcedId | No | GUID Reference | SourcedId of the UserProfile for the User. |
The dependencies of this file on other files when supporting bulk processing are:
- This requires a reference to the associated user using the 'userSourcedId' attribute. This produces a dependency on the users.csv. This also produces a dependency on the orgs.csv;
- This requires a reference to the associated org using the 'orgSourcedId' attribute. This produces a dependency on the orgs.csv;
- If a value for the 'userProfileSourcedId' attribute is supplied, a link to the associated userProfile is established. This produces a dependency on the userProfiles.csv.
3.19 'scoreScales.csv'
A new file added in version 1.2.
This file represents the ScoreScales dataset from the OneRoster Gradebook specification. This is a new CSV file added in OR 1.2.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the scoreScale. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
title | Yes | String | A human readable title for the score scale. |
type | Yes | String | The type of score scaling e.g. percent. |
orgSourcedId | Yes | GUID Reference | The org for which the score scale is used. |
courseSourcedId | Yes | GUID Reference | The course for which the score scale is used. |
classSourcedId | Yes | GUID Reference | The class for which the score scale is used. |
scoreScaleValue | Yes | List of Strings | A specific mapping of values between two score scales. The left hand side (LHS) value is the reference point. These values are enclosed in ‘{}’ with a colon used to separate the values. If more than one score scale mapping is needed, use double quotes, and separate with commas (per [RFC4180]). Examples: {Pass:50} and "{A+:100},{A:94},{A-:90}", {A:7-10}, {60-69:B}, etc. |
The dependencies of this file on other files when supporting bulk processing are:
- This requires a reference to the associated user using the 'orgSourcedId' attribute. This produces a dependency on the orgs.csv;
- This requires a reference to the associated user using the 'courseSourcedId' attribute. This produces a dependency on the courses.csv. The courses dependency creates a further set of dependencies on the on the academicSessions.csv and orgs.csv files;
- This requires a reference to the associated user using the 'classSourcedId' attribute. This produces a dependency on the classes.csv. This creates a corresponding dependency on the academicSessions.csv and courses.csv files. The courses dependency creates a further set of dependencies on the on the academicSessions.csv and orgs.csv files.
3.20 'userProfiles.csv'
A new file added in version 1.2.
This information is used to enable authentication/authorization/access management of the various systems/tools/apps/etc. available to the user.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the userProfile. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
userSourcedId | Yes | GUID | Unique ID for the corresponding user. |
profileType | Yes | String | The type of user profile. This should be a human readable label that has some significance in the context of the related system, app, tool, etc. |
vendorId | Yes | String | The unique identifier for the vendor of the system, tool, app, etc. which requires the use of this user profile. |
applicationId | No | String | The unique identifier for the vendor of the system, tool, app, etc. which requires the use of this account. |
description | No | String | A human readable description of the use of the account. This should not contain any security information for access to the account. |
credentialType | Yes | String | The type of credentials for the user profile. This should be indicative of when this credential should be used. |
username | Yes | String | The username for this profile. |
password | No | String | The password for the user. This may or may not be an encrypted string. If encrypted, the processing system must be aware of the encryption method. |
The extension mechansim should be used to support the exchange of the appropriate credentials and other details required for the profile.
The dependencies of this file on other files when supporting bulk processing are:
- This requires a reference to the associated user using the 'userSourcedId' attribute. This produces a dependency on the users.csv. This also produces a dependency on the orgs.csv.
3.21 'userResources.csv'
A new file added in version 1.2.
This file represents the links between the Resources and Users datasets from the OneRoster Rostering and Resources specification.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the userResourse relationship. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
userSourcedId | Yes | GUID Reference. | SourcedId of the user who will have access to this resource. |
orgSourcedId | No | GUID Reference. | SourcedId of the reference Organization. |
classSourcedId | No | GUID Reference. | SourcedId of the reference Class. |
resourceSourcedId | Yes | GUID Reference. | SourcedId of the Resource associated with the User. |
The dependencies of this file on other files when supporting bulk processing are:
- This requires a reference to the associated user using the 'userSourcedId' attribute. This produces a dependency on the users.csv. This also produces a dependency on the orgs.csv;
- There may be a reference to the associated organization (org) using the ‘orgSourcedId’ attribute. This produces a dependency on the orgs.csv;
- There may be a reference to the associated class (class) using the 'classSourcedId' attribute. This produces a dependency on the classes.csv. This dependency on the class leads to the corresponding dependencies on the academicSessions.csv, courses.csv and orgs.csv files;
- This requires a reference to the associated resource (resource) using the ‘resourceSourcedId’ attribute. This produces a dependency on the resources.csv.
3.22 'users.csv'
This file represents the Users dataset from the OneRoster Rostering specification.
Several columns have been deleted and new ones added in this release.
Column Field Header | Required | Format | Description |
---|---|---|---|
sourcedId | Yes | GUID | Unique ID for the user. |
status | Yes for Delta | Enumeration | Permitted values for Delta mode: { active | tobedeleted }. This MUST NOT be used for the Bulk mode. |
dateLastModified | Yes for Delta | DateTime | The date that this record was last modified. ISO 8601 format [ISO8601]. This MUST NOT be used for the Bulk mode. |
enabledUser | Yes | Boolean | Permitted values are: { true | false }. 'false' denotes that the user is an active record but system access is curtailed according to the local administration rules. |
username | Yes | String | User name. |
userIds | No | List of Strings | External machine-readable ID (e.g. LDAP id, LTI id) for this user. The ID must be accompanied by a type to indicate the nature of the Identifier. The Type and ID values are enclosed in ‘{}’ with a colon used to separate the values. If more than one userId is needed, use double quotes, and separate with commas (per [RFC4180]). Examples: {LDAP:Id} and "{LDAP:Id},{LTI:Id},{Fed:Id}" |
givenName | Yes | String | User's first name. |
familyName | Yes | String | User's surname. |
middleName | No | String | User's middle name(s). If more than one then they are separated by a space. |
identifier | No | String | Identifier for the user with a human readable meaning. |
No | String | Email address for the User. | |
sms | No | String | SMS address for the User. |
phone | No | String | Phone number for the User. |
agentSourcedIds | No | List of GUID References | SourcedIds of the Users to which this user has a relationship. If multiple IDs are required then use double quotes and separate with commas. Note: In most cases this will be for indicating parental relationships. |
grades | No | String | Grade(s) for which a user with role 'student' is enrolled. The permitted vocabulary should be agreed as part of the definition of the usage of this specification. |
password | No | String | The password for the user. This may or may not be an encrypted string. If encrypted the processing system must be aware of the encryption method. |
userMasterIdentifier | No | String | The master identifier that could be used to provide globally unique identification of the user across all of the tools, systems, apps, etc. available/accessed by the user. This is a new column added in version 1.2. |
resourceSourcedIds | No | List of GUID References | The list of sourcedIds for the resources that are to be made available to this user. This is a new column added in version 1.2. |
preferredGivenName | No | String | The given name by which the User prefers to be known. This is a new column added in version 1.2. |
preferredMiddleName | No | String | The middle names by which the User prefers to be known. This is a new column added in version 1.2. |
preferredFamilyName | No | String | The family name by which the User prefers to be known. This is a new column added in version 1.2. |
primaryOrgSourcedId | No | GUID Reference | The sourcedId of the primary 'org' for the 'user'. In OR 1.2 a user can have one or more 'roles' in one or more 'org's and so identification of the primary 'org' is now required. This is a new column added in version 1.2. |
The dependencies of this file on other files when supporting bulk processing are:
- This produces an implicit dependency on the roles.csv file. This creates a dependency on the orgs.csv file;
- This produces an implicit optional dependency on the userProfiles.csv file. This creates a dependency on the orgs.csv file;
- There may be reference to agents (users) in the SAME file through the 'agentsSourcedIds' attribute but this creates no new file dependencies;
- There may be reference to the associated resources (resource) using the ‘resourceSourcedIds’ attribute. This produces a dependency on the resources.csv.
4. Extending & Profiling the CSV Binding
This Section is NON-NORMATIVE.
4.1 Extending the CSV Binding
4.1.1 Proprietary Data Elements
It is recognized that implementers may wish to extend the specification. The preferred mechanism for doing this is for implementers to use an extension space within the OneRoster data model, and then set their CSV parsers to read those extension attributes. Extensions are ONLY permitted by adding 'metadata' named columns to the end of the set of columns already defined in the specification.
An example of creating such an extension is given in the accompanying Implementation Guide document [OR-IG].
4.1.2 Proprietary Vocabulary Terms
In this version the ability to extend some of the enumerated vocabularies has been added: currently, ONLY the 'classType' (classes.csv), 'role' (enrollments.csv and roles.csv), 'roles' (resources.csv), 'scoreStatus' (results.csv), 'SessionTypeEnum', 'sex' (demographics.csv), 'source' (lineItemLearningObjectiveIds.csv and resultLearningObjectiveIds.csv) and 'type' (academicSession.csv and orgs.csv) vocabularies MAY be extended. Each proprietary term must start with the characters 'ext:'.
An example of creating such an extension is given in the accompanying Implementation Guide document [OR-IG].
4.2 Profiling the CSV Binding
This Service can be profiled. In general, Profiling is used to:
- Refine which Interfaces are used and which operations are supported for each Interface;
- Refine the data models by increasing the constraints on the base definitions.
Valid Profiles must be restrictive i.e. optional features can be removed or constraints increased but new features must not be added. A Profile of this service is made by annotating the UML supplied with the documentation for the specification.
It is strongly recommended that a profile of this specification is undertaken either by, or with the close support, of IMS Global. However, no matter who is responsible for creating the profile artefacts (documents, OpenAPI files, XSDs, etc.), it is strongly recommended that the IMS specification tools are used. This will ensure that the artefacts are consistent with the base specifications and that useful support documentation is automatically produced e.g. creation of a document that summarises the differences between the base specification and the profile. Organizations wishing to produce a profile of this specification should contact Lisa Mattson (IMS Global Chief Operations Officer) at: lmattson@imsglobal.org.
A. File Dependencies Matrix
This section is non-normative.
This Section is NON-NORMATIVE.
Table A1 is the dependency matrix for the CSV files. This shows the set of CSV files that MUST be supplied for BULK exchange; this dependency is created because the set of supplied CSV files must be semantically complete and the data model defines certain fields must be present within a CSV file. To read the matrix select the CSV file of interest in the left hand column. The entries along that row indicate if some other CSV file is required (R) or may be required (O) if an associated optional field has been included in the source CSV file.
The color coding for Table A1 is:-
- Green - denotes a source file that has NO dependencies on the other CSV files (the manifest will include a single data file i.e. either 'categories.csv' or 'resources.csv')
- Yellow - denotes a source file that has a dependency only on itself i.e. another row in the same CSV file (the manifest will include a single data file i.e. of either 'academicSessions.csv' or 'orgs.csv')
- Orange - denotes a source file that has a dependency on some other file that itself is self contained i.e. a CSV file that is color-coded Green or Yellow. 'courses.csv' has a dependency on the Yellow and/or Green coded files
- Pink - denotes a source file that a dependency on some other file that itself has other dependencies. Pink coded files are 'classes.csv', 'classResources.csv', 'courseResources.csv', 'demographics.csv', 'roles.csv', 'userProfiles.csv' and 'users.csv'
- Red - denotes a source file that as a further depth of dependency when compared to the files that are color coded Pink. Red coded files are 'enrollments.csv', 'lineItems.csv', 'lineItemScoreScales.csv', 'results.csv', 'resultScoreScales.csv', and 'scoreScales.csv'.
File Names | Rostering | Resources | Gradebook | ||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
academic Sessions |
classes | courses | demographics | enrollments | orgs | roles | user Profiles |
users | resources | class Resources |
course Resources |
user Resources |
categories | line Items |
results | score Scales |
result Score Scales |
line Item Score Scales |
result Learning Objective Ids |
line Item Learning Objective Ids |
|
academicSessions | O(P) | ||||||||||||||||||||
classes [C] | R(T), O[S] | R | R(S), R[S] | ||||||||||||||||||
courses [S] | O(SY) | R | |||||||||||||||||||
demographics | R[U] | R[U] | O[U] | R | |||||||||||||||||
enrollments | R[C], O(SY) | R | R[C] | R(S), R(U) | R[U] | O[U] | R | ||||||||||||||
orgs | O(P) | ||||||||||||||||||||
roles | R | O | R | ||||||||||||||||||
userProfiles | R[U] | R | |||||||||||||||||||
users [U] | R | R | O | O(A) | O | ||||||||||||||||
File Names | academic Sessions |
classes | courses | demographics | enrollments | orgs | roles | user Profiles |
users | resources | class Resources |
course Resources |
user Resources |
categories | line Items |
results | score Scales |
result Score Scales |
line Item Score Scales |
result Learning Objective Ids |
line Item Learning Objective Ids |
resources | |||||||||||||||||||||
classResources | R[C] | R | R[C] | R[C] | R | ||||||||||||||||
courseResources | O[S] | R | R[S] | R | |||||||||||||||||
userResources | O[C] | O | O | R | R | ||||||||||||||||
File Names | academic Sessions |
classes | courses | demographics | enrollments | orgs | roles | user Profiles |
users | resources | class Resources |
course Resources |
user Resources |
categories | line Items |
results | score Scales |
result Score Scales |
line Item Score Scales |
result Learning Objective Ids |
line Item Learning Objective Ids |
categories | |||||||||||||||||||||
lineItems [L] | R(GP), R[C] | R | R[C] | R[C] | R | ||||||||||||||||
results [R] | R[L], O(SY) | R[L] | R[L] | R[L] | R[U] | O[U] | R(S) | R[L] | R | ||||||||||||
scoreScales [X] | R[C], O[S] | R | R, R[C] | R, R[C], R[S] | |||||||||||||||||
resultScoreScales | R[X], R[R] | R[X], R[R] | R[X], R[R] | R[X], R[R] | R[R] | O[R] | R[R] | R[R] | R[R] | R | R | ||||||||||
lineItemScoreScales | R[X], R[L] | R[X], R[L] | R[X], R[L] | R[X], R[L] | R[L] | R | R | ||||||||||||||
resultLearningObjectiveIds | R[R] | R[R] | R[R] | R[R] | R[R] | O[R] | R[R] | R[R] | R[R] | R | |||||||||||
lineItemLearningObjectiveIds | R[L] | R[L] | R[L] | R[L] | R[L] | R |
The key conclusions are:
- No CSV file is dependent on the 'classResoures.csv', 'courseResources.csv', 'demographics.csv', 'enrollments.csv', 'lineItemScoreScales.csv', 'results.csv', 'resultScoreScales.csv', 'lineItemLearningObjectiveIds.csv', 'resultLearningObjectiveIds.csv' and 'userResources.csv'files
- The Gradebooks-oriented CSV file-set ('categories.csv', 'lineItems.csv', 'results.csv', 'lineItemLearningObjectiveIds.csv', 'resultLearningObjectiveIds.csv', 'scoreScales.csv', 'lineItemScoreScales.csv' and 'resultScoreScales.csv' files) IS dependent on several of the Rostering CSV files
- The Rostering-oriented CSV file-set must consist of 'academicsessions.csv', 'classes.csv', 'courses.csv', 'enrollments.csv', 'orgs.csv', 'roles.csv' and 'users.csv'.
NOTE: An implementation may impose further constraints on the set of files required for semantic consistency i.e. more files may need to be supplied than the strict minimum.
B. Revision History
This section is non-normative.
B.1 Version History
Version No. | Release Date | Comments |
---|---|---|
Final Release v1.0 | 3rd June 2015 | The first formal release of the Final Release version of this document. |
Final Release v1.1 | 17th April, 2017 | The second formal release of this document. The conformance requirements, for both CSV and REST, have been made considerably more demanding and specific. |
Candidate Final Public Release v1.2 / 1.0 | 1st July, 2021 | The third formal release of this document. A number of new data model features have been added to the operational modes of Rostering, Resources and Gradebook. Support for eight new CSV files has been included, namely:
|
Candidate Final Public Release v1.2 / 1.1 | 8th March, 2022 | The fourth formal release of this document. Changes have been made to the 'results.csv' model, namely:
|
B.2 Changes in this Version
The changes made for this Final Release 1.2 document are:
- The following editorial changes have been made:-
- For the purposes of easing internationalization of this specification, all references to CEDS have been removed from the data model descriptions. Usage of the appropriate vocabularies are discussed in the Implementation Guide [OR-IG] and any appropriate profiling documents.
- The following CSV files have been added:-
- 'userProfiles.csv'
- 'roles.csv'
- 'userResources.csv'
- 'scoreScales.csv'
- 'lineItemScoreScales.csv'
- 'resultScoreScales.csv'
- 'lineItemLearningObjectiveIds.csv'
- 'resultLearningObjectiveIds.csv'.
- The following changes have been made to the 'manifest.csv' file:-
- Rows for the eight new CSV files have been added
- The 'oneroster.version' row is required to have a value of '1.2' when referring to an OR 1.2 compliant manifest
- The following changes have been made to the 'categories.csv' file:-
- The
weight
column has been added.
- The
- The following changes have been made to the 'demographics.csv' file:-
- The enumerated vocabulary for the
sex
column is now permitted to have new values of 'other and 'unspecified'.
- The enumerated vocabulary for the
- The following changes have been made to the 'lineItems.csv' file:-
- The
schoolSourcedId
column has been added - The
resultValueMin
andresultValueMax
attributes have been made optional - The
gradingPeriodSourcedId
column has been renamedacademicSessionSourcedId
.
- The
- The following changes have been made to the 'results.csv' file:-
- The
classSourcedId
andtextScore
columns have been added - The
inProgress
,incomplete
,late
andmissing
columns have been added.
- The
- The following changes have been made to the 'users.csv' file:-
- The
orgSourcedIds
column has been removed (org identification is now achieved via the 'roles.csv' file) - The
role
column has been removed (role allocation is now achieved via the 'roles.csv' file) - The
preferredGivenName
,preferredMiddleName
andpreferredFamilyName
columns have been added - The
primaryOrgSourcedId
column has been added - The
userMasterIdentifier
column has been added.
- The
C. References
C.1 Normative references
- [ISO8601]
- Representation of dates and times. ISO 8601:2004.. International Organization for Standardization (ISO). 2004. ISO 8601:2004. URL: http://www.iso.org/iso/catalogue_detail?csnumber=40874
- [OR-CC]
- OneRoster 1.2 Conformance and Certification. IMS Global Learning Consortium, Inc. July, 2021. URL: https://www.imsglobal.org/spec/oneroster/v1p2/cert/
- [OR-IG]
- OneRoster 1.2 Implementation Guide. IMS Global Learning Consortium, Inc. July, 2021. URL: https://www.imsglobal.org/spec/oneroster/v1p2/impl/
- [ORGBK-SM]
- OneRoster 1.2 Gradebook Services. IMS Global Learning Consortium, Inc. July, 2021. URL: https://www.imsglobal.org/spec/oneroster/v1p2/gradebook/info
- [ORRES-SM]
- OneRoster 1.2 Resource Services. IMS Global Learning Consortium, Inc. July, 2021. URL: https://www.imsglobal.org/spec/oneroster/v1p2/resource/info
- [ORROS-SM]
- OneRoster 1.2 Rostering Services. IMS Global Learning Consortium, Inc. July, 2021. URL: https://www.imsglobal.org/spec/oneroster/v1p2/rostering/info
- [RFC1951]
- DEFLATE Compressed Data Format Specification version 1.3. P. Deutsch. IETF. May 1996. Informational. URL: https://www.rfc-editor.org/rfc/rfc1951
- [RFC2119]
- Key words for use in RFCs to Indicate Requirement Levels. S. Bradner. IETF. March 1997. Best Current Practice. URL: https://www.rfc-editor.org/rfc/rfc2119
- [RFC3629]
- UTF-8, a transformation format of ISO 10646. F. Yergeau. IETF. November 2003. Internet Standard. URL: https://www.rfc-editor.org/rfc/rfc3629
- [RFC4180]
- Common Format and MIME Type for Comma-Separated Values (CSV) Files. Y. Shafranovich. IETF. October 2005. Informational. URL: https://www.rfc-editor.org/rfc/rfc4180
D. List of Contributors
The following individuals contributed to the development of this document:
Name | Organization | Role |
---|---|---|
William Baker | Pearson | |
Arthur Barstow | McGraw-Hill | |
Hank Davidson | Pearson | |
Vijay Dhanaraj | Classlink | |
David Gappa | Safari Montage | |
Linda Feng | Unicon | |
Viktor Haag | D2L | |
Richard Heim | Learning Mate | |
Tom Ingram | Escambia County School District | |
Oxana Jurosevic | Instructure | |
Mike Kaastra | D2L | |
Jong Kim | Pearson | |
Lisa Mattson | IMS Global | |
David Mayes | Gwinnett County Schools | |
Joshua McGhee | IMS Global | editor |
Phil Nicholls | IMS Global | |
Padraig O'hiceadha | HMH | |
Upendra Penegalapati | Pearson | |
George Perreault | Classlink | |
James Perreault | FLVS | |
Patrick Porter | Houston ISD | |
Matt Richards | Infinite Campus | cochair |
Kurt Rompot | Pearson | |
Marc Sheftel | Pearson | |
Colin Smythe | IMS Global | editor |
Konrad Stimeling | K12 | |
Matt Vella | Schoology | |
TJ Vering | Microsoft | |
Mark Walls | Gwinnett County Schools | |
Stanley Watts | Classlink | |
Mike Zackerson | Instructure |