![]() |
IMS Question and Test Interoperability OverviewVersion 2.1 Public Draft (revision 2) Specification |
Copyright © 2006 IMS Global Learning Consortium, Inc. All Rights Reserved.
The IMS Logo is a registered trademark of IMS GLC.
Document Name: IMS Question and Test Interoperability Overview
| Date Issued: |
8 June 2006 |
| Latest version: |
QTI Project Group Forum |
| Register comments or implementations: |
http://www.imsglobal.org/community/forum/categories.cfm?catid=21&entercat=y |
|
Caution: this specification is incomplete in its current state. The IMS QTI project group is in the process of evolving this specification based on input from market participants. Suppliers of products and services are encouraged to participate by contacting Mark McKell at mmckell@imsglobal.org. This specification will be superseded by an updated release based on the input of the project group participants. Please note that supplier's claims as to implementation of QTI v2.1 and conformance to it HAVE NOT BEEN VALIDATED by IMS GLC. While such suppliers are likely well-intentioned, IMS GLC member organizations have not yet put in place the testing process to validate these claims. IMS GLC currently grants a conformance mark to the Common Cartridge profile of QTI v1.2.1. The authoritative source of products and services that meet this conformance is contained in the IMS online product directory http://www.imsglobal.org/ProductDirectory/directory.cfm Thank you for your interest in and support of IMS QTI. IPR and Distribution Notices Recipients of this document are requested to submit, with their comments, notification of any relevant patent claims or other intellectual property rights of which they may be aware that might be infringed by any implementation of the specification set forth in this document, and to provide supporting documentation. IMS takes no position regarding the validity or scope of any intellectual property or other rights that might be claimed to pertain to the implementation or use of the technology described in this document or the extent to which any license under such rights might or might not be available; neither does it represent that it has made any effort to identify any such rights. Information on IMS's procedures with respect to rights in IMS specifications can be found at the IMS Intellectual Property Rights web page: http://www.imsglobal.org/specificationlicense.html. Copyright © IMS Global Learning Consortium 2006. All Rights Reserved. If you wish to distribute this document or use this document to implement a product or service, you must complete a valid license registration with IMS and receive an email from IMS granting the license. To register, follow the instructions on the IMS web site: http://www.imsglobal.org/specificationdownload.cfm. This document may be copied and furnished to others by Licensee organizations registered on the IMS web site provided that the above copyright notice and this paragraph are included on all such copies. However, this document itself may not be modified in any way, such as by removing the copyright notice or references to IMS, except as needed for the purpose of developing IMS specifications, under the auspices of a chartered IMS project group. Use of this specification to develop products or services is governed by the license with IMS found on the IMS web site: http://www.imsglobal.org/question/qtiv2p1pd2/qtiv2p1pd2speclicense.html. The limited permissions granted above are perpetual and will not be revoked by IMS or its successors or assigns. THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTER'S OWN RISK, AND NEITHER THE CONSORTIUM, NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION. |
|
The IMS Question & Test Interoperability (QTI) specification describes a data model for the representation of question (assessmentItem) and test (assessmentTest) data and their corresponding results reports. Therefore, the specification enables the exchange of this item, test, and results data between authoring tools, item banks, test constructional tools, learning systems, and assessment delivery systems. The data model is described abstractly, using [UML] to facilitate binding to a wide range of data-modeling tools and programming languages, however, for interchange between systems a binding is provided to the industry standard eXtensible Markup Language [XML] and use of this binding is strongly recommended. The IMS QTI specification has been designed to support both interoperability and innovation through the provision of well-defined extension points. These extension points can be used to wrap specialized or proprietary data in ways that allows it to be used alongside items that can be represented directly.
Specifically, QTI is designed to:
Figure 2.1 The Role of Assessment Tests and Assessment Items.
A system used by an author for creating or modifying an assessment item.
A system for collecting and managing collections of assessment items.
A system for assembling tests from individual items.
A system for managing the delivery of assessments to candidates. The system contains a delivery engine for delivering the items to the candidates and scores the responses automatically (where applicable) or by distributing them to scorers.
A system that enables or directs learners in learning activities, possibly coordinated with a tutor. For the purposes of this specification a learner exposed to an assessment item as part of an interaction with a learning system (i.e., through formative assessment) is still described as a candidate as no formal distinction between formative and summative assessment is made. A learning system is also considered to contain a delivery engine though the administration and security model is likely to be very different from that employed by an assessmentDeliverySystem.
The author of an assessment item. In simple situations an item may have a single author, in more complex situations an item may go through a creation and quality control process involving many people. In this specification we identify all of these people with the role of author. An author is concerned with the content of an item, which distinguishes them from the role of an itemBankManager. An author interacts with an item through an authoringTool.
An actor with responsibility for managing a collection of assessment items with an itemBank.
The person being assessed by an assessment test or assessment item.
The specification is spread over a number of documents:
| Title |
IMS Question and Test Interoperability Overview |
| Editors |
Steve Lay (Cambridge Assessment), Pierre Gorissen (SURF) |
| Version |
Public Draft v2.1 (revision 2) |
| Version Date |
8 June 2006 |
| Status |
Public Draft (revision 2) Specification |
| Summary |
This document describes the QTI Overview specification. |
| Revision Information |
8 June 2006 |
| Purpose |
This document has been approved by the IMS Technical Board and is made available for public review and comment. |
| Document Location |
http://www.imsglobal.org/question/qtiv2p1pd2/imsqti_oviewv2p1pd2.html |
| To register any comments or questions about this specification please visit:
http://www.imsglobal.org/developers/ims/imsforum/categories.cfm?catid=23 |
The following individuals contributed to the development of this document:
| Name | Organization |
|---|---|
| Dick Bacon |
University of Surrey |
| Niall Barr |
Question Mark |
| Lance Blackstone |
Pearson VUE |
| Jeanne Ferrante |
ETS |
| Pierre Gorissen |
SURF |
| Regina Hoag |
ETS |
| Gopal Krishnan |
Pearson VUE |
| Steve Lay |
Cambridge Assessment |
| Rowin Young |
CETIS |
| Version No. | Release Date | Comments |
|---|---|---|
| Base Document 2.1 |
14 October 2005 |
The first version of the QTI v2.1 specification. |
| Public Draft 2.1 |
9 January 2006 |
The Public Draft v2.1 of the QTI specification. |
| Public Draft 2.1 (revision 2) |
8 June 2006 |
The Public Draft v2.1 (revision 2) of the QTI specification. |
IMS Global Learning Consortium, Inc. ("IMS/GLC") is publishing the information contained in this IMS Question and Test Interoperability Overview ("Specification") for purposes of scientific, experimental, and scholarly collaboration only.
IMS/GLC makes no warranty or representation regarding the accuracy or completeness of the Specification.
This material is provided on an "As Is" and "As Available" basis.
The Specification is at all times subject to change and revision without notice.
It is your sole responsibility to evaluate the usefulness, accuracy, and completeness of the Specification as it relates to you.
IMS/GLC would appreciate receiving your comments and suggestions.
Please contact IMS/GLC through our website at http://www.imsglobal.org
Please refer to Document Name: IMS Question and Test Interoperability Overview Revision: 8 June 2006