
Date Issued: 31 August 2012
Latest version: http://www.imsglobal.org/question/
IPR and Distribution Notices
Recipients of this document are requested to submit, with their comments, notification of any relevant patent claims or other intellectual property rights of which they may be aware that might be infringed by any implementation of the specification set forth in this document, and to provide supporting documentation.
IMS takes no position regarding the validity or scope of any intellectual property or other rights that might be claimed to pertain to the implementation or use of the technology described in this document or the extent to which any license under such rights might or might not be available; neither does it represent that it has made any effort to identify any such rights. Information on IMS's procedures with respect to rights in IMS specifications can be found at the IMS Intellectual Property Rights web page: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf.
Copyright © 2005-2012 IMS Global Learning Consortium. All Rights Reserved.
Use of this specification to develop products or services is governed by the license with IMS found on the IMS website: http://www.imsglobal.org/license.html.
Permission is granted to all parties to use excerpts from this document as needed in producing requests for proposals.
The limited permissions granted above are perpetual and will not be revoked by IMS or its successors or assigns.
THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTER'S OWN RISK, AND NEITHER THE CONSORTIUM, NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION.
Join the discussion and post comments on the QTI Public Forum: http://www.imsglobal.org/community/forum/categories.cfm?catid=52
The IMS Question & Test Interoperability (QTI) specification describes a data model for the representation of question (assessmentItem) and test (assessmentTest) data and their corresponding results reports. Therefore, the specification enables the exchange of this item, test and results data between authoring tools, item banks, test constructional tools, learning systems and assessment delivery systems. The data model is described abstractly, using [UML] to facilitate binding to a wide range of data-modelling tools and programming languages, however, for interchange between systems a binding is provided to the industry standard eXtensible Markup Language [XML] and use of this binding is strongly recommended. The IMS QTI specification has been designed to support both interoperability and innovation through the provision of well-defined extension points. These extension points can be used to wrap specialized or proprietary data in ways that allows it to be used alongside items that can be represented directly.
An initial V0.5 specification was released for discussion in March 1999 and in November it was agreed to develop IMS Question & Test Interoperability v1.0 which was released as a public draft in February 2000 and as a final specification in May that year. The specification was extended and updated twice, in March 2001 and January 2002. By February of that year in excess of 6000 copies of the IMS QTI 1.x specifications had been downloaded from the IMS web-site.
Since then, a number of issues of have been raised by implementers and reviewed by the QTI project team. Many of them were dealt with in an addendum, which defined version 1.2.1 of the specification and was released in March 2003. Some of the issues could not be dealt with this way as they required changes to the specification that would not be backwardly compatible or because they uncovered more fundamental issues that would require extensive clarification or significant extension of the specification to resolve.
Since the QTI specification was first conceived, the breadth of IMS specifications has grown and work on Content Packaging, Simple Sequencing and most recently Learning Design created the need for a cross-specification review. This review took place during 2003 and a number of harmonization issues affecting QTI were identified. In September that year a project charter was agreed to address both the collected issues from 1.x and the harmonization issues and to draft QTI V2.0. In order to make the work manageable and ensure that results were returned to the community at the earliest opportunity some restrictions were placed on the scope of the recommended work. Therefore, the QTI V2.0 release of the specification concentrated only on the individual assessmentItem and did not update those parts of the specification that dealt with the aggregation of items into sections and tests or the reporting of results. This QTI 2.1 release completes the update from 1.x to 2.x by replacing those remaining parts of the QTI specification.
The IMS QTI work specifically relates to content providers (that is, question and test authors and publishers), developers of authoring and content management tools, assessment delivery systems and learning systems. The data model for representing question-based content is suitable for targeting users in learning, education and training across all age ranges and national contexts.
QTI is designed to facilitate interoperability between a number of systems that are described here in relation to the actors that use them.
Specifically, QTI is designed to:

Figure 2.1 The Role of Assessment Tests and Assessment Items.
A system used by an author for creating or modifying an assessment item.
A system for collecting and managing collections of assessment items.
A system for assembling tests from individual items.
A system for managing the delivery of assessments to candidates. The system contains a delivery engine for delivering the items to the candidates and scores the responses automatically (where applicable) or by distributing them to scorers.
A system that enables or directs learners in learning activities, possibly coordinated with a tutor. For the purposes of this specification a learner exposed to an assessment item as part of an interaction with a learning system (i.e., through formative assessment) is still described as a candidate as no formal distinction between formative and summative assessment is made. A learning system is also considered to contain a delivery engine though the administration and security model is likely to be very different from that employed by an assessmentDeliverySystem.
The set of roles identified in this specification have been reduced to a small set of abstract actors for simplicity. Typically roles in real learning and assessment systems are more complex but, for the purposes of this specification, it is assumed that they can be generalized by one or more of the roles defined here.
The author of an assessment item. In simple situations an item may have a single author, in more complex situations an item may go through a creation and quality control process involving many people. In this specification we identify all of these people with the role of author. An author is concerned with the content of an item, which distinguishes them from the role of an itemBankManager. An author interacts with an item through an authoringTool.
An actor with responsibility for managing a collection of assessment items with an itemBank.
The role of test constructor is to create tests (test forms) from individual items. The items are typically drawn from an item bank.
A person charged with overseeing the delivery of an assessment. Often referred to as an invigilator. For the purposes of this specification a proctor is anyone (other than the candidate) who is involved in the delivery process but who does not have a role in assessing the candidate's responses.
A person or external system responsible for assessing the candidate's responses during assessment delivery. Scorers are optional, for example, many assessment items can be scored automatically using response processing rules defined in the item itself.
Someone involved in managing, directing or supporting the learning process for a learner but who is not subject to (the same) assessment.
The person being assessed by an assessment test or assessment item.
The specification is spread over a number of documents:
Because the QTI 2.1 specification is designed to accommodate a wide range of practices, conformance is defined in, and tested against, specific profiles. Such a profile can define which parts of the specification a community intends to support (items, tests, packages, results), and what specific features in each of those areas. In some cases, profiles can also include extensions to the specification, which are outlined in further detail below.
A certification of conformance against an existing profile is granted by passing a series of tests, submitting the results to IMS Global and agreeing to become part of the support community [QTI_APIP]. IMS records all certifications of conformance to current profiles on the public IMS certification website [IMS_CERT]. At the time conformance is certified, IMS issues a unique registration number designator for the product name and version for use in proposals. Buyers and users are invited to visit the certification website to find certified products and to log any issues with certified products.
Communities that are interested in defining their own profiles are encouraged to examine current profiles for appropriateness or for inspiration. Contact IMS Global for the possibilities of adopting, adapting or defining a profile of QTI to meet the requirements of your particular community.
Details about conformance related to both QTI and [APIP] are available on [ASSESS_PRIMER]. This page also lists the profiles that are currently available for conformance certification. One of these is the QTI Formative Entry profile, which captures the same assessment requirements represented in Common Cartridge v1.x (based on a profile of the QTI v1.2 specification). Interoperability with this profile was demonstrated by systems involved in the development of the v2.1 specification.
The IMS QTI/APIP Assessment APMG (Accredited Profile Management Group) is responsible for the ongoing maintenance of the QTI and APIP specifications, as well as those profiles that are available for conformance testing.
QTI 2.1 can be extended in two ways: with Custom Interactions and Custom Operators. Custom operators are a means of introducing more sophisticated processing of candidate's responses. This is particularly useful where the responses are likely to contain subject specific constructs such as computer code fragments or mathematical proofs. Further information and guidance on using custom operators is available in section 3.4.1 of the Implementation Guide of this specification.
Custom Interactions are a means of using interaction types that are not covered by the interaction types of the specification itself. These custom interactions trade a degree of interoperability for a wider range of user experiences. Because of the interoperability cost, care should be taken in defining such custom interaction types, since they may well be covered by a particular configuration of an already existing interactiontype. More information and best practice about sharing and running custom interactions is available at [INTERACT]. Work is underway to make types of custom interactions 'runnable', and therefore interoperable and sharable. More information will be made available at [INTERACT] in due course.
Custom operators and custom interactions can be shared by registering them at [QTI_INPUT]; already registered custom extensions can be viewed at [QTI_REG]. The [QTI_INPUT] form requires the submitter to specify the title of the submitted custom extension, a short description, a schema (XSD or DTD) that defines the structure of the custom item, and the name and organization of the author of the custom extension. The name and affiliation of the submitter is automatically recorded. Optionally, the submission can include images, long descriptions, the name of a tool that implements the custom extension, and a website URL where more information about the tool and/or the custom extension is available.
Once the vocabulary is submitted, the process proceeds as follows:
In the cases where a vocabulary is rejected, then an explanation will be given for the rejection. An amended vocabulary can be resubmitted and this will be treated without prejudice.
Between the second Public Draft and this Final Release, the following changes have been incorporated into the specification:
|
Description |
XSD change |
Information Model change |
|---|---|---|
|
New Response Processing templates added |
||
|
New infoControl element; a simple hint without consequences |
yes |
yes |
|
Outcome variable identifier reserved names MAXSCORE and PASSED added |
yes |
|
|
Clarification of the meaning of the expectedlength attribute value |
yes |
|
|
Clarification of the meaning of extendedTextInteraction's expectedlines attribute |
yes |
|
|
Clarification of datatypes such as duration |
yes |
|
|
Interaction attributes harmonised; they all have the same set, described similarly |
yes |
yes |
|
New roundTo operator with roundingMode attribute |
yes |
yes |
|
New templateConstraint element to enable interdependent variables to be generated in a template |
yes |
yes |
|
New repeat operator; enables authors to set variables whose size is itself a variable |
yes |
yes |
|
Index datatype now has relaxed constraints to allow integers and variables |
yes |
yes |
|
printedVariable cardinality and datatype restrictions relaxed, new attributes added: powerForm, field, index, delimiter, mappingIndicator |
yes |
yes |
|
APIP namespace imported into QTI feedbackBlock, rubricBlock and templateBlock |
yes |
yes |
|
IMS_LIP replaced with simpler IMS_LIS derived sourcedID structure defined under the QTI namespace for the identification of learners. |
yes |
yes |
|
sum operator relaxed to allow multiple children (i.e. become a container) |
yes |
|
|
New mathOperator element; provides access to common numerical math functions |
yes |
yes |
|
New mathConstant element; returns mathematical constants as a single float, e.g. π and e. |
yes |
yes |
|
yes |
yes |
|
|
New statsOperator element; performs common statistical functions |
yes |
yes |
|
Relaxing product content restrictions; it takes multiple cardinalities now |
yes |
|
|
yes |
||
|
New gcd and lcm operators offer access to more math functions |
yes |
yes |
|
Missing candidateComment fixed |
yes |
|
|
New allowLateSubmission attribute |
yes |
yes |
|
New caseSensitive attribute on mapEntry; allows greater flexibility without using regular expressions |
yes |
yes |
|
Clarification of the meaning and handling of the initial state of sliderInteraction. |
yes |
|
|
New assessmentSectionRef element; it enables assessment section reference |
yes |
yes |
|
Block level elements are now allowed inside prompt |
yes |
yes |
|
New powerForm attribute for printedVariable |
yes |
yes |
|
stylesheet capability added to feedbackBlock, rubricBlock and templateBlock |
yes |
yes |
|
'matchGroup' element deleted |
yes |
yes |
|
use attribute on rubricBlock added |
yes |
yes |
|
Datatype and cardinality of the tolerance attribute changed |
yes |
yes |
|
positionObjectStage now allowed to appear in div |
yes |
yes |
|
align="center" valign="baseline" attributes enabled in HTML's <td> |
yes |
|
|
Multiple nested feedbackBlock and templateBlock examples added to the implementation guide |
||
|
More explanation about customOperators added to the Implementation Guide |
||
|
alt attribute of HTML's <image> element allowed to contain more than 250 characters |
yes |
yes |
|
Examples added to the Implementation Guide that are more representative, or demonstrate new numerate features, block behavior, adaptive tests or custom extensions |
||
|
feedbackBlock, rubricBlock now allow both HTML block and inline elements |
yes |
yes |
|
feedback elements no longer allowed in rubricBlock |
yes |
yes |
|
A body element collocation table has been made available as an implementation aide |
||
|
Old Mexican President feedback example in the Implementation Guide replaced |
||
|
The 'adaptive', 'shuffle' and 'maxAssociation' attributes that were required now have a default value. Display of these attributes in instances is optional |
yes | yes |
| Title |
IMS Question & Test Interoperability Overview |
| Editors |
Wilbert Kraan (JISC/CETIS), Steve Lay (Cambridge Assessment),
Pierre Gorissen (SURF) |
| Version |
Final v2.1 |
| Version Date |
31 August 2012 |
| Status |
Final Release Specification |
| Summary |
This document provides an overview of the QTI specification. |
| Revision Information |
31 August 2012 |
| Purpose |
This document has been approved by the IMS Technical Advisory Board
and is made available for adoption and conformance. |
| Document Location |
http://www.imsglobal.org/question/qtiv2p1/imsqti_oviewv2p1.html |
| To register any comments or questions about this
specification please visit:
http://www.imsglobal.org/community/forum/categories.cfm?catid=52 |
|
The following individuals contributed to the development of this document:
| Name | Organization |
|---|---|
| Odette Auzende |
Université Pierre et Marie Curie (France) |
| Dick Bacon |
JISC/CETIS (UK) |
| Niall Barr |
University of Glasgow/IMS Global (UK) |
| Lance Blackstone |
Pearson (USA) |
| Jeanne Ferrante |
ETS (USA) |
| Helene Giroire |
Université Pierre et Marie Curie (France) |
| Pierre Gorissen |
SURF (The Netherlands) |
| Regina Hoag |
ETS (USA) |
| Wilbert Kraan |
JISC/CETIS (UK) |
| Gopal Krishnan |
Pearson (USA) |
| Young Jin Kweon |
KERIS (South Korea) |
| Steve Lay |
Cambridge Assessment (UK) |
| Francoise LeCalvez |
Université Pierre et Marie Curie (France) |
| David McKain |
JISC/CETIS (UK) |
| Mark McKell |
IMS Global (USA) |
| Sue Milne |
JISC/CETIS (UK) |
| Jens Schwendel |
BPS Bildungsportal Sachsen GmbH (Germany) |
| Graham Smith |
JISC/CETIS (UK) |
| Colin Smythe |
IMS Global (UK) |
| Yvonne Winkelmann |
BPS Bildungsportal Sachsen GmbH (Germany) |
| Rowin Young |
JISC/CETIS (UK) |
| Version No. | Release Date | Comments |
|---|---|---|
| Base Document 2.1 |
14 October 2005 |
The first version of the QTI v2.1 specification. |
| Public Draft 2.1 |
9 January 2006 |
The Public Draft v2.1 of the QTI specification. |
| Public Draft 2.1 (revision 2) |
8 June 2006 |
The Public Draft v2.1 (revision 2) of the QTI
specification. |
| Final Release v2.1 |
31 August 2012 |
The Final Release v2.1 of the QTI specification. Includes
updates, error corrections, and additional details. |
IMS Global Learning Consortium, Inc. ("IMS Global") is
publishing the information contained in this IMS Question
and Test Interoperability Overview
("Specification") for purposes of scientific, experimental,
and scholarly collaboration only.
IMS Global makes no warranty or representation regarding the
accuracy or completeness of the Specification.
This material is provided on an "As Is" and "As Available"
basis.
The Specification is at all times subject to change and revision
without notice.
It is your sole responsibility to evaluate the usefulness,
accuracy, and completeness of the Specification as it relates to
you.
IMS Global would appreciate receiving your comments and
suggestions.
Please contact IMS Global through our website at http://www.imsglobal.org
Please refer to Document Name: IMS Question and Test
Interoperability Overview Revision: 31
August 2012