[QTI] QTI2 list of xsd
Steve Lay
swl10 at cam.ac.uk
Tue Jul 8 15:12:11 BST 2008
The starting point is the directory xsddocs, which is at the top level
when you unpack the zip folder downloaded from IMS.
In this directory you'll find the QTI schema files in DTD and XML Schema
forms:
imsqti_v2p0.dtd
imsqti_v2p0.xsd
Note that you should probably be using the v2p1 of the specification
now. Although the scope of 2.1 is wider (to include whole tests) you
should use it even if you are only interested in the scope of 2.0 as
there are some small differences to fix some bugs and issues raised by
developers.
The other schema files in the package are either supporting files
(schema files can include other schema files to incorporate externally
defined models, like the small xml.xsd file) or related specifications
such as IMS content packaging.
Steve
- -
> Hi everyone,
>
> I want to implement qti version 2.0 .
> I downloaded qti_item_v2p0all folder but there are many different xsd
> files in there...
> Now I generate java classes from xsd files.
> Could someone tell me which are the xsd files that I should use to
> generate java classes??
>
> Thanks!
>
>
>
> ------------------------------------------------------------------------
> Κατεβάστε 30 ΔΩΡΕΑΝ Emoticons για τον Windows Live Messenger σας!
> Windows Live Messenger! <http://www.livemessenger-emoticons.com/el-gr/>
>
>
> ------------------------------------------------------------------------
>
> _______________________________________________
> IMS-QTI mailing list
> IMS-QTI at lists.ucles.org.uk
> http://lists.ucles.org.uk/lists/listinfo/ims-qti
More information about the IMS-QTI
mailing list