[QTI] qti_v2p1_jaxb.jar
Steve Lay
swl10 at cam.ac.uk
Fri Apr 11 16:19:48 BST 2008
Ken,
Sorry to be a bit slow getting back - not sure which repository you've
been using to get the jar file. Is it through a Google code project?
I'm forwarding this reply to another list to see if I can flush out the
owners of the files.
Steve
Hamilton, Kenneth wrote:
> Hello.
>
> I have been attempting to develop some code to
> import QTI code into an existing assessment
> system. In this effort, I have been using
> the jar qti_v2p1_jaxb.jar, as I understood this
> to be available for such use under an open
> source (BSD) license. The version that I have
> been using has class files dated March 10, 2008,
> and has imsqti_v2p1 as its root package. It
> appears to work fine for my needs.
>
> Now I cannot find this version of the jar on
> the QTI development site. It has apparently been
> replaced with a new jar
>
> qti_v2p1_jaxb_no_mathml_no_xinclude.jar
>
> with a different package structure.
>
> I would like to continue to use the version I have,
> and not have to rewrite code.
>
> Typically we get versioned jars via maven, and
> I have the March 10 version of your jar in our
> local repository. It would be preferable to point
> to a stable reference version that could be
> downloaded by maven.
>
> I want to be sure that I am operating within the
> bounds of your license as I understood it when I
> copied this jar. I am planning to use it in an
> upcoming release of a commercial product, and
> I accept that it is "without warranty".
>
> I think it is very important for the adoption of QTI
> to have reference versions of such fundamental
> functionality freely available.
>
> Please let know if I have misunderstood the terms
> of use. I am operating under a tight schedule and
> need to know what I can rely upon.
>
> Thank you very much.
>
> Ken Hamilton
> Principal Software Engineer
> Follett Digital Resources
>
>
> _______________________________________________
> IMS-QTI mailing list
> IMS-QTI at lists.ucles.org.uk
> http://lists.ucles.org.uk/lists/listinfo/ims-qti
More information about the IMS-QTI
mailing list