Learning Resource Meta-data Specification
Version 1.3 - Final Specification - HTML
- 1EdTech Meta-data Best Practice Guide for IEEE 1484.12.1-2002 Standard for Learning Object Metadata
- Guidelines for Using the 1EdTech LRM v1.2.1 to IEEE LOM 1.0 Transform
1EdTech Transform and Examples
Download all the Examples and Tranforms
1EdTech Schemas v1.3
The following schemas are a simplified profile of the LOM binding in a single binding file that have been created by 1EdTech's auto generation tool. Schematron was used to create unique bindings.The following schemas are a simplified profile of the LOM binding in a single binding file that have been created by 1EdTech's auto generation tool. Schematron was used to create unique bindings.
- imsmd_loose_v1p3p2.xsd (updated May 2012)
- imsmd_strict_v1p3p2.xsd(updated May 2012)
- imsmd_strict_v1p3.xsd
- imsmd_loose_v1p3.xsd
Version 1.3 - Final Specification - PDF
Alignment of 1EdTech Learning Resource Meta-data with IEEE Learning Object Metadata
Following the publication of the IEEE Std 1484.12.1 - 2002, IEEE Standard for Learning Object Metadata (LOM) in July 2002 and meetings involving stakeholders from the 1EdTech contributing membership, the specification for 1EdTech Learning Resource Meta-data, is updated as described below:
- The 1EdTech Learning Resource Meta-data Information Model 1.2.1 Final Specification is superseded by IEEE Std 1484.12.1 - 2002, IEEE Standard for Learning Object Metadata (LOM) found here, http://shop.ieee.org/store/: IEEE Standard for Learning Object Metadata, IEEE 2002;Softcover;2002;ISBN 0-7381-3297-7; Product No.: SH95001-TBR; IEEE, Standard No.: 1484.12.1-2002 OR IEEE Standard for Learning Object Metadata, IEEE 2002;PDF;2002;ISBN 0-7381-3298-5; Product No.: SS95001-TBR; IEEE Standard No.: 1484.12.1-2002
- The 1EdTech Learning Resource Meta-data Information Model 1.2.2 Public Draft is replaced by the IEEE Std 1484.12.1 - 2002, IEEE Standard for Learning Object Metadata (LOM) also found here http://shop.ieee.org/store/: IEEE Standard for Learning Object Metadata, IEEE 2002;Softcover;2002;ISBN 0-7381-3297-7; Product No.: SH95001-TBR; IEEE, Standard No.: 1484.12.1-2002 OR IEEE Standard for Learning Object Metadata, IEEE 2002;PDF;2002;ISBN 0-7381-3298-5; Product No.: SS95001-TBR; IEEE Standard No.: 1484.12.1-2002
- The 1EdTech Learning Resource Meta-data Best Practices and Information Guide 1.2.1 has been revised and is superseded by 1EdTech Meta-data Best Practice Guide for IEEE 1484.12.1-2002 Standard for Learning Object Metadata, Version 1.3 .
- The 1EdTech Learning Resource Meta-data XML Binding Specification is replaced by the IEEE Std 1484.12.3-2005, IEEE Standard for Learning Technology -- Extensible Markup Language (XML) Schema Definition Language Binding for Learning Object Metadata. IEEE Std 1484.12.3-2005 is available from http://shop.ieee.org/store/ in PDF format (Product No:SS95339 ISBN:0-7381-4710-9) or in print (Product No:SH95339 ISBN:0-7381-4079-5).
Version 1.2.4 - XSD Schema - Maintenance Release
The following changes have been made for v1.2.4:
1. Added the 1EdTech Copyright statement ;
2. Removed the x: prefix references and ensured the import statement uses the W3C namespace (http://www.w3.org/XML/1998/namespace) and schemalocation (http://www.w3.org/2001/03/xml.xsd);
3. Changed name of schema file to "imsmd_v1p2p4.xsd" and made sure the version attribute to "1EdTech MD 1.2.4" to reflect minor version change;
4. The multiplicity of 'taxon' in 'taxon' path has been changed from 0..1 to 0..*. This problem was identified in the 1EdTech Maintenance Database as issue: 198. This is now consistent with IEEE LOM;
5. The recursive element of 'taxon' within 'taxon' has been removed. This problem was identified in the 1EdTech Maintenance Database as issue: 198. This is now consistent with IEEE LOM.
1EdTech Meta-Data v1.2.2 specification is is the public draft of an errata update to correct minor discrepancies in the schema. For descriptions of the Schema changes, see the Change History in the header of the Schema document.
Version 1.2.2 - Public Draft Specification - HTML
Schema Updates Document New documents will be posted shortly. Read the
1EdTech XML Bindings, DTDs, and Examples
- imsmd_v1p2p2.xsd
- ims_xml.xsd
- imsmdexample_schema.xml
- test_schema.xml
- cancore_ex1.xml
- cancore_ex2.xml
- MERLOTexample1_schema.xml
- MERLOTexample2_schema.xml
- MD_NETg_en_US72475.xml
- MD_NETg_en_US_72475_355.xml
- MD_NETg_EN_US_72475_Assmt3_Pre.xml
- Download Schema Update pdf, Sample Files and Tests
1EdTech Meta-Data v1.2.1 specification is an errata update to correct minor discrepancies between element descriptions in the 1EdTech Meta-Data Binding and Information Model. The Meta-Data Schema (imsmd_rootv1p2p1.xsd) has also been updated. For descriptions of the Schema changes, see the Change History in the header of the Schema document.
Version 1.2.1 - Final Specification - HTML
- 1EdTech Learning Resource Meta-data Information Model
- 1EdTech Learning Resource Meta-data XML Binding Specification
- 1EdTech Learning Resource Meta-data Best Practices and Implementation Guide
Version 1.2.1 - Final Specification - PDF
1EdTech XML Bindings, DTDs, and Examples
- imsmd_rootv1p2p1.xsd
- ims_xml.xsd
- imsmdexample_schema.xml
- test_schema.xml
- cancore_ex1.xml
- cancore_ex2.xml
- MERLOTexample1_schema.xml
- MERLOTexample2_schema.xml
- MD_NETg_en_US72475.xml
- MD_NETg_en_US_72475_355.xml
- MD_NETg_EN_US_72475_Assmt3_Pre.xml
- Download Sample Files

