Interactive Whiteboard / Common File Format (IWB/CFF)

 

The Interactive WhiteBoard/Common File Format (IWB/CFF) specification defines a file format to hold content primarily designed to be viewed on a large display. Much of this content will be designed to be interactive, so objects can move around the page.

The primary goal of this format is to establish a format that can be opened, edited, saved and used across many whiteboard applications so that teaching content can be exchanged between establishments. To this goal the format must be simple but extendible in a restricted way to ensure compatibility.

The initial work on the Common File Format was done in 2009 by Becta in the UK. Changes from the Becta specification include:

  1. Replace the Becta namespace declaration (xmlns:iwb=http://www.becta.org.uk/iwb) with the IMS IWB namespace (xmlns=http://www.imsglobal.org/xsd/iwb_v1p0).
  2. Declare the IMS IWB namespace as the default namespace for the IWB elements and remove the “iwb:” namespace prefix from those IWB elements (<iwb version="1.0" xmlns="http://www.imsglobal.org/xsd/iwb_v1p0").
  3. Use the schemaLocation attribute to specifically declare all of the namespaces and their document locations in each content.xml XML instance document like this:
    xsi:schemaLocation="http://www.imsglobal.org/xsd/iwb_v1p0 http://www.imsglobal.org/profile/iwb/iwbv1p0_v1p0.xsd http://www.w3.org/2000/svg http://www.imsglobal.org/profile/iwb/svgsubsetv1p0_v1p0.xsd http://www.w3.org/1999/xlink http://www.imsglobal.org/xsd/w3/1999/xlink.xsd">

    Figure 1 - Original CFF FIle

    Figure 1: Example of original CFF file namespace declarations.

    Figure2: Converted IMS IWB File

    Figure 2: Example of converted IMS IWB 1.0 file namespace declarations.

     

The Interactive Whiteboard / Common File Format (IWB/CFF) Public draft is available for comment. Comments and Feedback may be posted in the IMS Public Forums at: http://www.imsglobal.org/community/forum/categories.cfm?catid=145&flcache=8460711&entercat=y

Conformance will be available for IWB/CFF Alliance members.

IMS GLC IWB/CFF Specification Public Draft v1.0 - HTML

 

IWB/CFF Version 1.0 Public Draft Specification

IWB/CFF Version 1.0 Public Draft Conformance Specification

 

IMS GLC IWB/CFF Specification Public Draft v1.0 - PDF

Download the pdf documents


To inquire about the IWB/CFF workgroup or IWB/CFF Alliance, contact us.