IMS Logo IMS Content Packaging Information Model
Version 1.1.2 Final Specification
Copyright © 2001 IMS Global Learning Consortium, Inc. All Rights Reserved.
The IMS Logo is a trademark of IMS Global Learning Consortium, Inc.
Document Name: IMS Content Packaging Information Model
Revision: 8 August 2001

IPR and Distribution Notices

Recipients of this document are requested to submit, with their comments, notification of any relevant patent claims or other intellectual property rights of which they may be aware that might be infringed by any implementation of the specification set forth in this document, and to provide supporting documentation.

IMS takes no position regarding the validity or scope of any intellectual property or other rights that might be claimed to pertain to the implementation or use of the technology described in this document or the extent to which any license under such rights might or might not be available; neither does it represent that it has made any effort to identify any such rights. Information on IMS's procedures with respect to rights in IMS specifications can be found at the IMS Intellectual Property Rights web page: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf.

Copyright © IMS Global Learning Consortium 2006. All Rights Reserved.

If you wish to distribute this document or use this document to implement a product or service, you must complete a valid license registration with IMS and receive an email from IMS granting the license. To register, follow the instructions on the IMS website: http://www.imsglobal.org/specificationdownload.cfm.

This document may be copied and furnished to others by Licensee organizations registered on the IMS website provided that the above copyright notice and this paragraph are included on all such copies. However, this document itself may not be modified in any way, such as by removing the copyright notice or references to IMS, except as needed for the purpose of developing IMS specifications, under the auspices of a chartered IMS work group.

Use of this specification to develop products or services is governed by the license with IMS found on the IMS website: http://www.imsglobal.org/content/packaging/cpv1p1p2/cpv1p1p2speclicense.html.

The limited permissions granted above are perpetual and will not be revoked by IMS or its successors or assigns.

THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTER'S OWN RISK, AND NEITHER THE CONSORTIUM, NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION.

Table of Contents


1. Introduction
     1.1 Overview
     1.2 Scope & Context
     1.3 Structure of this Document
     1.4 Nomenclature

2. IMS Content Packaging Conceptual Model
     2.1 Key Elements
     2.2 Standard Name for the Manifest File

3. Extensibility

4. Manifest Elements
     4.1 (Sub)Manifests

Appendix A - List of Contributors

About This Document

Revision History

Index

1. Introduction

1.1 Overview

The IMS Content Packaging Information Model describes data structures that are used to provide interoperability of Internet based content with content creation tools, learning management systems (LMS), and run time environments.

The objective of the IMS Content Packaging Information Model is to define a standardized set of structures that can be used to exchange content. These structures provide the basis for standardized data bindings that allow software developers and implementers to create instructional materials that interoperate across authoring tools, LMSs, and run time environments that have been developed independently by various software developers.

Note: The scope of the IMS Content Packaging specification is focused on defining interoperability between systems that wish to import, export, aggregate, and disaggregate Packages of content. Future documents comprising the IMS Content specification will address requirements regarding content data models and communication between run time environments and LMSs.

1.2 Scope & Context

This document is the IMS Content Packaging (CP) Information Model specification. As such it will be used as the basis for the production of the following documents:

1.3 Structure of this Document

The structure of the rest of this document is:

2. IMS Content Packaging Conceptual model
The underlying usage, processing control and data structures comprising Content Packaging.
3. Extensibility
The ways in which proprietary extensions are supported through this specification.
4. Manifest Elements
The detailed description of the Manifest elements in terms of their properties and attributes.
Appendix A - Contributors
A listing of individuals who contributed to the development of this document.

1.4 Nomenclature

CDATA Character Data
CPI Content & Packaging Interchange
DTD Document Type Definition
PCDATA Parsed Character Date
W3C World Wide Web Consortium
XML Extensible Mark-up Language

2. IMS Content Packaging Conceptual Model

In Figure 2.1 is a conceptual diagram that illustrates the components of the IMS Content Packaging Information Model. As indicated in the IMS Content Packaging Best Practice Guide, this is part of the larger IMS Content Framework, which forms the basis for this and future specifications.

IMS Content Packaging scope

Figure 2.1 IMS Content Packaging scope.

2.1 Key Elements

The IMS Package depicted in Figure 2.1 consists of two major elements: a special XML file describing the content organization and resources in a Package, and the physical files being described by the XML. The special XML file is called the IMS Manifest file, because course content and organization is described in the context of 'manifests'. Once a Package has been incorporated into a single file for transportation, it is called a Package Interchange File. The relationship of these parts to the content container is described below:

Package Interchange File - a single file, (e.g., .zip, .jar, .cab) which includes a top-level manifest file named "imsmanifest.xml" and all other physical files as identified by the Manifest. A Package Interchange File is a concise Web delivery format, a means of transporting related, structured information. PKZip v2.04g (.zip) is recommended as the default Package Interchange File format.

Package - a logical directory, which includes a specially named XML file, any XML control documents it references (such as a DTD or XSD file), and sub-directories containing the actual physical resources.

Package - A Package represents a unit of usable (and reusable) content. This may be part of a course that has instructional relevance outside of a course organization and can be delivered independently, as an entire course or as a collection of courses. Once a Package arrives at its destination to a run time service, such as an LMS vendor, the Package must allow itself to be aggregated or disaggregated into other Packages. A Package must be able to stand-alone; that is, it must contain all the information needed to use the contents for learning when it has been unpacked.

Packages are not required to be incorporated into a Package Interchange File. A Package may also be distributed on a CD-ROM or other removable media without being compressed into a single file. An IMS Manifest file and any other supporting XML files required by it (DTD, XSD) must be at the root of the distribution medium.

Manifest - A manifest is a description in XML of the resources comprising meaningful instruction. A manifest may also contain zero or more static ways of organizing the instructional resources for presentation.

The scope of manifest is elastic. A manifest can describe part of a course that can stand by itself outside of the context of a course (an instructional object), an entire course, or a collection of courses. The decision is given to content developers to describe their content in the way they want it to be considered for aggregation or disaggregation. The general rule is that a Package always contains a single top-level manifest that may contain one or more (sub)Manifests. The top-level manifest always describes the Package. Any nested (sub)Manifests describe the content at the level to which the (sub)Manifest is scoped, such as a course, instructional object, or other.

For example, if all content comprising a course is so tightly coupled that no part of it may be presented out of the course context, a content developer would want to use a single manifest to describe that course's resources and organization. However, content developers who create "instructional objects" that could be recombined with other instructional objects to create different course presentations would want to describe each instructional object in its own manifest, then aggregate those manifests into a higher-level manifest containing a course organization. Finally, a content developer who wants to move multiple courses in a single Package (a curriculum), would use a top-level manifest to contain each course-level manifest and any instructional object manifests that each course might contain.

Resource - The resources described in the manifest are physical assets such as web pages, media files, text files, assessment objects or other pieces of data in file form. Resources may also include assets that are outside the Package but available through a URL, or collections of resources described by (sub)Manifests. The combination of resources is generally categorized as content. Each resource may be described in a <resource> element within a manifest's XML. This element includes a list of all the assets required to use the resource. The files included in the Package are listed as <file> elements within such <resource> elements.

2.2 Standard Name for the Manifest File

Content distributed according to the IMS Content Packaging specification must contain an IMS Manifest file. To ensure that the IMS Manifest file can always be found within a Package, it has a pre-defined name and location:

imsmanifest.xml

The IMS Manifest file and any of its supporting XML files (DTD, XSD) must be placed at the root of the Package Interchange File or any other packaging image (like a CD-ROM).

In the absence of this file, the package is not an IMS Package and cannot be processed. It is required that the name be kept, as above, in all lowercase letters.

3. Extensibility

An important underpinning of the IMS Content Packaging specification is rich support for extensibility. While the base Content Packaging Information Model leverages the rich set of meta-data elements defined in the IMS Meta-Data Specification v1.2, it defines only the basic structures for organization and resources (Web Content). It is expected that implementers of this specification will define new types of resources and organizations to describe and transport rich learning resources, and over time, it may be possible to incorporate widely used extensions into future versions of this specification.

4. Manifest Elements

This section provides a conceptual, informative description of the elements contained in a Manifest. Figure 4.1 illustrates the primary elements of a Manifest.

Manifest elements

Figure 4.1 Manifest elements.

The table below provides a conceptual, informative description of the data objects. The columns used in the table refer to:

No: The number of the data element. An element may be composed of sub-elements. The numbering scheme reflects these relationships.
Name: The descriptive name of the element.
Explanation: A brief functional description of the element.
Reqd: Indicates if the element is required.

M = mandatory element that must be included in the data object, if the element at the higher level is included.

C = conditional element, existence is dependent on values of other elements.

O = optional element.
Mult: Multiplicity of the element. Repeatability of an Element implies that all sub-elements repeat with the Element.

Blank (-) = single instance.

Number = maximum number of times the element is repeatable.

n = multiple occurrences allowed, no limit.
Type: A description of formatting rules for the data element: Type includes the maximum length of the element. The international character set specified by ISO 10646 will be used for all fields.

Container = 'tag' element, of fixed length.

ID = element used to uniquely identify an object.

IDRef = a reference to an ID.

String (n) = descriptive element (smallest permitted maximum).

Boolean = True | False.

Note: Additional descriptive information about the element.

  1. In the table below, the Manifest elements contained in the Content Packaging Information Model are described using mixed case to enhance readability. Implementers of this specification should refer to particular binding specifications. For example, some XML bindings follow the W3C convention of using lowercase for all elements.
  2. Elements surrounded by braces ({}) indicate areas in the Information Model where elements from other information models or specifications are expected to be included.

No. Name Explanation Reqd Mult Type Note
0
Manifest
A reusable unit of instruction. Encapsulates meta-data, organizations, and resource references.
M
-
Container


0.1
Identifier
An identifier that is unique within the Manifest.
M
-
ID
See the Best Practice Guide for guidelines on the use of identifiers.
0.2
Version
Identifies the version of this Manifest (e.g., 1.0).
O
-
String (20)
Used to identify if there have been any changes to the Package. Identifier is the same in two Manifest files.
1
Meta-data
Meta-data describing the Manifest.
O
-
Container

1.1
Schema
Describes the schema that defines and controls the Manifest.
O
-
String (100)
If no schema element is present, it is assumed to be "IMS Content".
1.2
SchemaVersion
Describes the version of the above schema (e.g., 1,0, 1.1).
O
-
String (20)
If no version is present, it is assumed to be "1.1"
1.3
{IMS Meta-Data}
This is where IMS Meta-data is inserted.
O
n
-
The information contained in this section is defined by the IMS Meta-Data specification.
2
Organizations
Describes one or more structures or organizations for this package.
M
-
Container


2.1
Default
Indicates which organization scheme is the default one.
O
-
IDRef
If not supplied, the first organization element encountered is assumed to be the default.
2.2
Organization
Describes a particular hierarchical organization.
O
n
Container
Different views or organizational paths through the content can be described using multiple instances of organization.
2.2.1
Identifier
An identifier that is unique within the Manifest file.
M
-
ID
See the Best Practice Guide for guidelines on the use of identifiers.
2.2.2
Structure
Has a default value of "hierarchical" for describing the shape of an organization.
O
-
String
(200)
Other values for structure will likely become part of a future specification.
2.2.3
Title
Describes the title of the organization.
O
-
String (200)
Used to help user decide which organization to choose.
2.2.4
Item
A node that describes the shape of the organization.
M
n
Container
Can be used in a hierarchical organizational scheme by ordering and nesting.
2.2.4.1
Identifier
An identifier that is unique within the Manifest file.
M
-
ID
See the Best Practice Guide for guidelines on the use of identifiers.
2.2.4.2
IdentifierRef
A reference to an identifier in the resources section or a (sub)Manifest.
O
-
String (2000)


2.2.4.3
Title
Title of the item.
O
-
String (200)


2.2.4.4
IsVisible
Indicates whether or not this item is displayed when the Package is displayed or rendered.
O
-
Boolean
If not present, value is assumed to be "true".
2.2.4.5
Parameters
Static parameters to be passed to the resource at launch time.
O
-
String (1000)


2.2.4.6
Item
A sub-node within this organization.
O
n
Container
This is a sub-item and repeats all the parts of <item>.
2.2.4.7
Meta-data
Meta-data describing this item.
O
-
Container
See item 1. above
2.2.4.7.1
{IMS Meta-Data}
This is where IMS Meta-data is inserted.
O
n
-
The information contained in this section is defined by the IMS Meta-Data specification.
2.2.5
Meta-data
Meta-data describing this organization.
O
-
Container
See item 1. above
2.2.5.1
{IMS Meta-Data}
This is where IMS Meta-data is inserted.
O
n
-
The information contained in this section is defined by the IMS Meta-Data specification.
3
Resources
A collection of references to resources. There is no assumption of order or hierarchy.
M
-
Container


3.1
Resource
A reference to a resource.
O
n
Container


3.1.1
Identifier
An identifier that is unique within the scope of its containing manifest file.
M
-
ID
See the Best Practice Guide for guidelines on the use of identifiers.
3.1.2
Type
Indicates the type of resource.
M
-
String (1000)
The only current type is "webcontent", defined as content that can be hosted in or launched by an Internet browser.
This includes:
- HTML-based content.
- Content that requires plug-ins (e.g. Flash, Real Media.)
- Executables that are launched by a browser.
3.1.3
HRef
A reference to a URL.
O
-
String (2000)


3.1.4
Meta-data
Meta-data describing this resource.
O
-
Container
See item 1. above
3.1.4.1
{IMS Meta-Data}
This is where IMS Meta-data is inserted.
O
n
-
The information contained in this section is defined by the IMS Meta-Data specification.
3.1.5
File
A listing of files that this resource is dependent on.
O
-
Container
An element identifying a single file this resource is dependent on. Repeat as needed for each file for a given resource.
3.1.5.1
HRef
Identifies the location of the file.
M
n
String (2000)


3.1.5.2
Meta-data
Meta-data describing this file.
O
-
Container
See item 1. above
3.1.5.2.1
{IMS Meta-Data}
This is where IMS Meta-data is inserted.
O
n
-
The information contained in this section is defined by the IMS Meta-Data specification.
3.1.6
Dependency
Identifies a resource whose files this resource depends upon.
O
n
IDref
This element identifies a single resource which can act as a container for multiple files that this resource depends upon.
3.1.6.1
IdentifierRef
A reference to an identifier in the resources section.
M
-
String (2000)


4
Manifest
A reusable unit of instruction. Encapsulates meta-data, organizations, and resource references.
O
n
Container
See section 4.1 (Sub)Manifests below for more information.

4.1 (Sub)Manifests

When the identifierref of an <item> in an <organization> references a (sub)Manifest rather than another type of resource, this shall be interpreted as follows:

The diagram in Figure 5.1 explains how the content of a (sub)Manifest is virtually merged with the content of a referencing manifest. The circles represent <items> in an <organization> structure.

Merging organization from a (sub)Manifest

Figure 5.1 Merging <organization> from a (sub)Manifest.

In Figure 5.2, the diagram explains how the content of a (sub)Manifest is merged with an <item> that has children of its own, and how the referencing <item>'s children take precendence over those they merge with.

Merging organization from a (sub)Manifest when the referencing item has children

Figure 5.2 Merging <organization> from a (sub)Manifest when the referencing <item> has children.

Appendix A - List of Contributors

The following individuals contributed to the development of this specification:

Jay Beavers
Microsoft
Claude Ostyn
Click2Learn, Inc.
Adam Cooper
Fretwell-Downing
Mike Pettit
Blackboard
Rich Cushman
SCT
Daniel Rehak
Carnegie Mellon University
Philip Dodds
ADL
Tyde Richards
IBM
Steve Griffin
Eduprise
Udo Schuermann
Blackboard
Mike Halm
Penn State
Colin Smythe
IMS
Alan Hoberney
ADL
Schawn Thropp
ADL
Chris Moffatt
Microsoft
Tom Wason
IMS
Boyd Nielsen
NETg
Bill Young
Sun Microsystems
Bill Olivier
CETIS
Kenny Young
Microsoft

About This Document

Title
IMS Content Packaging Information Model
Editors
Thor Anderson, Mark McKell
Team Co-Lead
Adam Cooper (Fretwell-Downing)
Version
1.1.2
Version Date
August 2001
Status
Final Specification
Summary
This document describes the IMS Content Packaging Information Model, which is used to support content interoperability between different authors, publishers and other corresponding content developers.
Revision Information
8 August 2001
Purpose
Defines the Content Packaging Information Model
Document Location
http://www.imsglobal.org/content/packaging/

Revision History

Version No. Release Date Comments
Base 1.0
23 December 1999
The first formally released version of the full IMS Content Packaging Information Model Base Document.
Draft 0.9
8 February 2000
Draft of final version 1 specification accepted by IMS Technical Board
Public Draft 0.91
15 February 2000
Updated to address
a) more consistent W3C-like handling of external files
cleaner way to handle extended resource in the <resources> section
0.92
20 March 2000
Format updated with following changes:
a) Move "isvisible" attribute from <resource> element to <item> element
b) Add <title> to <tableofcontents>
c) Revert back to the <resource type="webcontent"> approach introduced in the v0.9 document
d) Rename <organization> to <organizations>
1.0
2 May 2000
Final specification release presented to the IMS Technical Board:
a) Adopted IMS meta-data version 1.1
b) Updated version information to 1.0
1.0
25 May 2000
Updated document to address the following open issues:
a) Added a definition to the table for element 3.2.2 with the name "webcontent".
b) Note #1 added about using mixed case to enhance table readability.
c) Added section 4.8.1 on identifiers
d) Note #2 added as description about how element names within curly braces are really just section placeholders and not real elements.
Public Draft 1.1
8 December 2000
Made minor text changes and updated the document to address the following issues:
a) Replaced <tableofcontents> element with the <organization> element.
b) Made <title> a sub-element of <item> rather than an attribute of it.
c) Changed resource <item> element attribute "identifieref" to "resourceref".
d) Made sub-level <manifest> a sub-element of <manifestref>, rather than <manifest>.
e) Changed references from URL Base to XML Base.
f) Reworded parts of section 2.1 in clarifying the definition of <organizations> and package.
g) Added <dependency> element as a sub-element of <resource>.
h) Updated XML samples.
Final 1.1
19 April 2001
Updated document to address the following open issues:
a) Clarified the use of the <organization> and <item> elements.
b) Added statement of recommendation to use PKZip v2.04g as the default Package Interchange File format in Section 1.2.
c) Extended meta-data functionality to <organization>, <item>, and <file>.
d) Changed the type attribute on <organization> to structure with a default value of hierarchical.
e) Changed the href attribute on the <resource> element from Mandatory to Optional.
f) Deprecated the use of <manifestref> and moved (sub)Manifests out of the <resources> block.
g) Changed resource <item> element attribute back to "identifieref" from "resourceref".
h) Made several minor edits; changed references to sub-manifest to (sub)Manifest; updated the graphics.
i) Changed Boolean type in the elements table from (0,1) to (true | false), in order to work with schemas.
Update 1.1.1
23 May 2001
a) Updated XML-Schema sample in Binding Appendix B.
Final 1.1.2
8 August 2001
Made several editorial corrections, and:
a) Updated references to IMS Meta-Data v1.2.
b) Added explanation and diagrams to clarify the use of (sub)Manifests.
c) Corrected the Manifest elements drawing.

Index

A
Aggregation 1

C
Co-Leads 1
Contributors 1

D
DTD 1

E
Editors 1
Elements
     Default 1
     Dependency 1
     File 1
     HRef 1
     Identifier 1, 2
     IdentifierRef 1, 2
     IsVisible 1
     Item 1
     Manifest 1, 2
     Meta-data 1, 2
     Organization 1
     Parameters 1
     Resource 1
     Resources 1
     Schema 1
     SchemaVersion 1
     Structure 1
     Title 1, 2
     Type 1
     Version 1
extensibility 1

I
IMS Manifest File 1
IMS Manifest file 1
imsmanifest.xml 1, 2

L
LMS 1, 2

M
Manifest 1, 2

O
Organizations 1

P
Package 1, 2
Package Interchange File 1, 2

R
Resource 1
Revision History 1
run time environment 1

S
scope 1
sub-Manifest 1, 2, 3

W
W3C 1

X
XML 1

Z
zip 1

 

 

 

IMS Global Learning Consortium, Inc. ("IMS") is publishing the information contained in this IMS Content Packaging Information Model ("Specification") for purposes of scientific, experimental, and scholarly collaboration only.

IMS makes no warranty or representation regarding the accuracy or completeness of the Specification.
This material is provided on an "As Is" and "As Available" basis.

The Specification is at all times subject to change and revision without notice.

It is your sole responsibility to evaluate the usefulness, accuracy, and completeness of the Specification as it relates to you.

IMS would appreciate receiving your comments and suggestions.

Please contact IMS through our website at http://www.imsglobal.org

Please refer to Document Name:
IMS Content Packaging Information Model Revision: 8 August 2001