
IMS GLC Common Cartridge Profile: Appendices
Version 1.1 Final Specification
Date Issued: 10 January 2011
Latest version: http://www.imsglobal.org/cc/index.html
IPR and Distribution Notices
Recipients of this document are requested to submit, with their comments, notification of any relevant patent claims or other intellectual property rights of which they may be aware that might be infringed by any implementation of the specification set forth in this document, and to provide supporting documentation.
IMS takes no position regarding the validity or scope of any intellectual property or other rights that might be claimed to pertain to the implementation or use of the technology described in this document or the extent to which any license under such rights might or might not be available; neither does it represent that it has made any effort to identify any such rights. Information on IMS's procedures with respect to rights in IMS specifications can be found at the IMS Intellectual Property Rights web page: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf.
Copyright ) 2008-2011 IMS Global Learning Consortium. All Rights Reserved.
Permission is granted to all parties to use excerpts from this document as needed in producing requests for proposals.
Use of this specification to develop products or services is governed by the license with IMS found on the IMS website: http://www.imsglobal.org/license.html.
The limited permissions granted above are perpetual and will not be revoked by IMS or its successors or assigns.
THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTER'S OWN RISK, AND NEITHER THE CONSORTIUM, NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION.
The Common Cartridge profile schema and auxiliary schemas are located at: http://www.imsglobal.org/profile/cc/ccv1p1
The following table lists the namespaces applied to the CC profile, each with the corresponding physical location for the actual schema.
Table A.1: Map of namespaces to schema locations.
|
Namespace |
Path |
|
http://www.imsglobal.org/xsd/imsccv1p1/imscp_v1p1 |
http://www.imsglobal.org/profile/cc/ccv1p1/ccv1p1_imscp_v1p2_v1p0.xsd |
|
http://www.imsglobal.org/xsd/imsccv1p1/imsccauth_v1p1 |
http://www.imsglobal.org/profile/cc/ccv1p1/ccv1p1_imscp_v1p1_v1p0.xsd |
|
http://ltsc.ieee.org/xsd/imsccv1p1/LOM/manifest |
http://www.imsglobal.org/profile/cc/ccv1p1/LOM/ccv1p1_lommanifest_v1p0.xsd |
|
http://ltsc.ieee.org/xsd/imsccv1p1/LOM/resource |
http://www.imsglobal.org/profile/cc/ccv1p1/LOM/ccv1p1_lomresource_v1p0.xsd |
|
http://www.imsglobal.org/xsd/ims_qtiasiv1p2 |
http://www.imsglobal.org/profile/cc/ccv1p1/ccv1p1_qtiasiv1p2p1_v1p0.xsd |
|
http://www.imsglobal.org/xsd/imsccv1p1/imswl_v1p1 |
http://www.imsglobal.org/profile/cc/ccv1p1/ccv1p1_imswl_v1p1.xsd |
|
http://www.imsglobal.org/xsd/imsccv1p1/imsdt_v1p1 |
http://www.imsglobal.org/profile/cc/ccv1p1/ccv1p1_imsdt_v1p1.xsd |
Title: IMS GLC Common Cartridge Profile: Appendices
Editor: Jeff Kahn (IMS GLC)
Version: 1.1
Version Date: 10 January 2011
Status: Final Version
Summary: This document contains the profile information for Common Cartridge, an open format for the distribution of rich, web-based content.
Purpose: This document has been approved by the Common Cartridge Accredited Profile Management Group and is made available for pubic adoption.
Document Location: http://www.imsglobal.org/cc/ccv1p1/imscc_profilev1p1-Appendices.html
The following individuals contributed to the development of this document:
|
Name |
Organization |
|
Thor Anderson |
Utah Valley University |
|
Brent Bailey |
Elsevier |
|
Warwick Bailey |
Icodeon |
|
Jeff Bradley |
Blackboard Inc. |
|
Ingo Dahn |
University of Koblenz-Landau |
|
Jeff Kahn (editor) |
IMS Global Learning Consortium |
|
Lisa Mattson |
IMS Global Learning Consortium |
|
Chris Moffatt |
Microsoft Inc. |
|
Mark O’Neil |
Blackboard Inc. |
|
Colin Smythe |
IMS Global Learning Consortium |
|
Erik Unhjem |
Pearson Education |
|
Claude Vervoort |
Blackboard Inc. |
|
Jennifer Whiting |
Florida Virtual School |
|
Yong-Sang Cho |
KERIS |
|
Version No. |
Release Date |
Comments |
|
Final v1.0 |
29 January 2009 |
The first formal release of the CC specification. |
|
Public Draft v1.1 |
9 November 2010 |
The Public Draft of the CC v1.1 specification. |
|
Revised Draft v1.1 |
24 December 2010 |
Revision to reflect namespace changes. |
|
Final v1.1 |
18 April 2011 |
The Final CC v1.1 specification. Correction made to the path locations of the schema files. |
|
|
|
|
IMS Global
Learning Consortium, Inc. ("IMS GLC") is publishing the
information contained in this IMS GLC Common Cartridge
Profile: Appendices ("Specification") for purposes of
scientific, experimental, and scholarly collaboration
only.
IMS GLC makes no warranty or
representation regarding the accuracy or completeness of the
Specification.
This material is provided on an
"As Is" and "As Available" basis.
The
Specification is at all times subject to change and revision
without notice.
It is your sole responsibility
to evaluate the usefulness, accuracy, and completeness of the
Specification as it relates to you.
IMS GLC
would appreciate receiving your comments and
suggestions.
Please contact IMS GLC through
our website at http://www.imsglobal.org
Please refer to this as Document Name: IMS GLC
Common Cartridge Profile: Appendices
Revision: 10 January 2011