
IMS Accessible Portable Item Protocol (APIP) Use Cases
Version 1.0
Candidate
Final
Version 1.0
Date Issued: 26 March 2012
Latest version: http://www.imsglobal.org/apip/
IPR and Distribution Notices
Recipients of this document are requested to submit, with their comments, notification of any relevant patent claims or other intellectual property rights of which they may be aware that might be infringed by any implementation of the specification set forth in this document, and to provide supporting documentation.
IMS takes no position regarding the validity or scope of any intellectual property or other rights that might be claimed to pertain to the implementation or use of the technology described in this document or the extent to which any license under such rights might or might not be available; neither does it represent that it has made any effort to identify any such rights. Information on IMS’s procedures with respect to rights in IMS specifications can be found at the IMS Intellectual Property Rights web page: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf.
Copyright © 2012 IMS Global Learning Consortium. All Rights Reserved.
Use of this specification to develop products or services is governed by the license with IMS found on the IMS website: http://www.imsglobal.org/speclicense.html.
Permission is granted to all parties to use excerpts from this document as needed in producing requests for proposals.
The limited permissions granted above are perpetual and will not be revoked by IMS or its successors or assigns.
THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY
WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF
NONINFRINGEMENT IS EXPRESSLY DISCLAIMED. ANY USE OF THIS
SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTER'S OWN
RISK, AND NEITHER THE CONSORTIUM, NOR ANY OF ITS MEMBERS OR
SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY
IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF ANY NATURE
WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS
SPECIFICATION.
Public contributions, comments and questions can be posted here:
http://www.imsglobal.org/community/forum/categories.cfm?catid=110
1.2 Structure of this Document
3.5 To Import a Set of APIP Items
3.6 To Export a Set of APIP Items
3.7 To Import a Set of APIP Tests
3.8 To Export a Set of APIP Tests
3.11 To Import an APIP Database
3.12 To Export an APIP Database
3.14 To Use an APIP Item in a Common Cartridge
3.15 To Use an APIP Test in a Common Cartridge
Figure 2.1 The set of use cases.
Table 2.1 List of supported uses-cases for each APIP version.
The Accessible Portable Item Protocol (APIP) Standard provides assessment programs and question item developers a data model for standardizing the file format of digital test items. When applied properly, the APIP standard accomplishes two important goals. First, the APIP standard allows digital test items to be ported across APIP compliant test item banks. Second, the APIP standard provides a test delivery interface with all the information and resources required to make a test item accessible for students with a variety of disabilities and special needs.
This document contains the use case descriptions for APIP. These use cases define the set of requirements that must be addressed by the technical approach for APIP. This document should be used in conjunction with the APIP Technical Specification [APIP, 12a] and the best practice examples [APIP, 12b].
This version of the document is Candidate Final, meaning the technical solution described in the specification is as definitive as possible in the absence of numerous systems and content that have implemented the specification and achieved official conformance. IMS strongly encourages its members and the community in general to continue/begin developing to the specification now. When a sufficient number of systems have proven the solution works through successful conformance achievement, the Candidate Final specification will be submitted to IMS members for Final approval. IMS expects only minor refinements based on implementation experience during this Candidate Final period.
Revisions to the APIP specification will be
posted here: http://www.imsglobal.org/APIP/
To join the IMS developer and conformance certification community
focused on APIP and QTI v2.1 please visit the IMS QTI2/APIP
Alliance online here: http://www.imsglobal.org/developers/apipalliance/index.cfm
Public contributions, comments and questions can be posted here:
http://www.imsglobal.org/community/forum/categories.cfm?catid=110
The structure of the rest of this document is:
|
2. Use Case Overview |
Presents the use case framework for APIP; |
|
2. The Key Use Cases |
The descriptions for the set of summary use cases that are supported by the APIP. These use case descriptions are documented using the Cockburn [Cockburn, 01] style. |
[APIP, 12a] Accessible Portable Item Protocol (APIP) v1.0 Technical Specification, Candidate Final Release, G.Driscoll, T.Hoffmann, W.Ostler, M.Russell, M.McKell and C.Smythe, IMS Global Learning Consortium Inc., March 2012.
[APIP, 12b] Accessible Portable Item Protocol (APIP) v1.0 Best Practices and Implementation Guide, Candidate Final Release, G.Driscoll, T.Hoffmann, W.Ostler, M.Russell, M.McKell and C.Smythe, IMS Global Learning Consortium Inc., March 2012.
[Cockburn, 01] Writing Effective Use-case, A.Cockburn, Addison-Wesley, 2001, ISBN 0-201-70225-8.
AfA Access for All
APIP Accessible Portable Item Protocol
CC Common Cartridge
CP Content Packaging
IEEE Institution of Electronic & Electrical Engineers
IMS Global IMS Global Learning Consortium
LOM Learning Object Metadata
LMS Learning Management System
LTI Learning Tools Interoperability
PNP Personal Needs & Preferences
QTI Question & Test Interoperability
UML Unified Modeling Language
XML Exchange Mark-up Language
The key use cases addressed by this profile are shown schematically in Figure 2.1.

Figure 2.1 The set of use cases.
The set of actors are:
· APIP Database – this is a digital repository that stores, in an appropriate format, the APIP Tests and APIP Items. These can now be made available to other APIP-compliant systems, tools and applications;
· Authoring Tool – this is a tool that can create and edit APIP Tests and/or APIP Items. This tool can combine APIP Items from several sources to create an APIP Test;
· Assessment System – this is a system that presents a learner with an assessment. In real-time it tailors and presents the assessment to meet the accessibility requirements and needs of the learner.
The list of use cases and the APIP versions in which they are supported is listed in Table 2.1:
Table 2.1 List of supported uses cases for each APIP version.
|
Use Case |
Supported in Version 1.0 |
|
Importing an APIP Item |
Y |
|
Exporting an APIP Item |
Y |
|
Importing an APIP Test |
Y |
|
Exporting an APIP Test |
Y |
|
Importing a Set of APIP Items |
Y |
|
Exporting a Set of APIP Items |
Y |
|
Importing a Set of APIP Tests |
Y |
|
Exporting a Set of APIP Tests |
Y |
|
Loading an APIP Test |
Y |
|
Loading an APIP Item |
Y |
|
Importing an APIP Database |
– |
|
Exporting an APIP Database |
– |
|
Reading an APIP PNP |
Y |
|
Using an APIP Item in a Common Cartridge |
– |
|
Using an APIP Test in a Common Cartridge |
– |
The use case descriptions in Section 3 use the Cockburn [Cockburn, 01] tabular style for documenting use cases. A broader set of use cases have been defined for APIP so that later versions of APIP can be extended without causing incompatibilities with version 1 implementations.
|
Use Case Title: |
To Import an APIP Item |
|
Brief Description: |
Upon request, the APIP Item and the associated asset files are imported in the form of the APIP interchange file from a source digital repository into either a target digital repository or an authoring tool. |
|
Level: |
Summary |
|
Actors: |
APIP Database, Authoring Tool |
|
Trigger: |
A user of an Authoring Tool or the APIP Database administrator request the import of an APIP Item. |
|
Preconditions: |
The APIP Item, and the associated asset files, are available for import in the form of an interchange file compliant with the APIP format. |
|
Success Post-condition: |
The APIP Item, and the associated set of asset files, are available in the new digital repository/authoring tool and available for editing, etc. |
|
Failure Post-condition: |
The APIP Item is not imported due to a problem in the interchange file. The problems may be in the availability of the asset files. |
|
Main Success Scenario: |
At receipt of the import request the system/application imports the interchange file into the target system/application (the manner of the import is outside the scope of this standard). The APIP Item is identified and stored in a form appropriate for the local system/application. All of the corresponding video, audio, image, etc. files are also stored appropriately. |
|
Exception Conditions: |
· The APIP Item is invalid; · The APIP content packaging manifest is missing or invalid. |
|
Use Case Title: |
To Export an APIP Item |
|
Brief Description: |
Upon request the APIP Item, is exported from a source digital repository or an authoring tool into an independent APIP interchange file that is stored where appropriate, e.g., in a file store. |
|
Level: |
Summary |
|
Actors: |
APIP Database, Authoring Tool |
|
Trigger: |
A user of an Authoring Tool or the APIP Database administrator request the export of the APIP Item. |
|
Preconditions: |
The APIP Item is available for export in the form suitable to the system/application/tool that will perform the export operation. |
|
Success Post-condition: |
The APIP interchange file has been created and stored. |
|
Failure Post-condition: |
The APIP interchange file cannot be created. This may be because one or more required asset files for the APIP Item cannot be located. |
|
Main Success Scenario: |
At receipt of the export request the system/application/tool responsible for the export identifies and collates the APIP Item and asset files. The APIP interchange file is then created and stored. |
|
Exception Conditions: |
· The APIP manifest cannot be created; · APIP Item cannot be created. |
|
Use Case Title: |
To Import an APIP Test |
|
Brief Description: |
Upon request the APIP Test and the associated APIP Items, is imported in the form of the APIP interchange file from a source digital repository into either a target digital repository or an authoring tool. |
|
Level: |
Summary |
|
Actors: |
APIP Database, Authoring Tool |
|
Trigger: |
A user of an Authoring Tool or the APIP Database administrator request the import of an APIP Test. |
|
Preconditions: |
The APIP Test, and the associated APIP Items, is available for import in the form of an interchange file compliant with the APIP format. |
|
Success Post-condition: |
The APIP Test, and the associated set of APIP Items, are available in the new digital repository/authoring tool and available for editing, etc. |
|
Failure Post-condition: |
The APIP Test is not imported due to a problem in the interchange file. The problems may be in the availability of APIP Items and/or the asset files. |
|
Main Success Scenario: |
At receipt of the import request the system/application imports the interchange file into the target system/application (the manner of the import is outside the scope of this standard). The APIP Test and the associated APIP Items are identified and stored in a form appropriate for the local system/application. All of the corresponding video, audio, image, etc. files are also stored appropriately. |
|
Exception Conditions: |
N/A |
|
Use Case Title: |
To Export an APIP Test |
|
Brief Description: |
Upon request the APIP Test, and the associated APIP Items, is exported from a source digital repository or an authoring tool into an independent APIP interchange file that is stored where appropriate e.g. in a file store. |
|
Level: |
Summary |
|
Actors: |
APIP Database, Authoring Tool |
|
Trigger: |
A user of an Authoring Tool or the APIP Database administrator request the export of an APIP Test. |
|
Preconditions: |
The APIP Test, and the associated APIP Items, are available for export in the form suitable to the system/application/tool that will perform the export operation. |
|
Success Post-condition: |
The APIP interchange file has been created and stored. |
|
Failure Post-condition: |
The APIP interchange file cannot be created. This may be due to size constraints or because one or more required APIP Items for the APIP Tests cannot be located. |
|
Main Success Scenario: |
At receipt of the export request the system/application/tool responsible for the export identifies and collates the APIP Test, the associated APIP Items and asset files. The APIP interchange file is then created and stored. |
|
Exception Conditions: |
N/A |
|
Use Case Title: |
To Import a Set of APIP Items |
|
Brief Description: |
Upon request a set of APIP Items, and the associated asset files, is imported in the form of the APIP interchange file from a source digital repository into either a target digital repository or an authoring tool. |
|
Level: |
Summary |
|
Actors: |
APIP Database, Authoring Tool |
|
Trigger: |
A user of an Authoring Tool or the APIP Database administrator requests the import of a set of APIP Items. |
|
Preconditions: |
The set of APIP Items, and the associated asset files, are available for import in the form of an interchange file compliant with the APIP format. |
|
Success Post-condition: |
The set of APIP Items, and the associated set of asset files, are available in the new digital repository/authoring tool and available for editing, etc. |
|
Failure Post-condition: |
The set of APIP Items are not imported due to a problem in the interchange file. Some of the Items may be successfully imported. The problems may be in the APIP Items and/or the asset files. |
|
Main Success Scenario: |
At receipt of the import request the system/application imports the interchange file into the target system/application (the manner of the import is outside the scope of this standard). The set of APIP Items are identified and stored in a form appropriate for the local system/application. All of the corresponding video, audio, image, etc. files are also stored appropriately. |
|
Exception Conditions: |
· One of more APIP Item(s) are invalid; · The APIP content packaging manifest is missing or invalid. |
|
Use Case Title: |
To Export a Set of APIP Items |
|
Brief Description: |
Upon request the set of APIP Items, is exported from a source digital repository or an authoring tool into an independent APIP interchange file that is stored where appropriate, e.g., in a file store. |
|
Level: |
Summary |
|
Actors: |
APIP Database, Authoring Tool |
|
Trigger: |
A user of an Authoring Tool or the APIP Database administrator requests the export of a set of APIP Items. |
|
Preconditions: |
The set of APIP Items are available for export in the form suitable to the system/application/tool that will perform the export operation. |
|
Success Post-condition: |
The APIP interchange file has been created and stored. |
|
Failure Post-condition: |
The APIP interchange file cannot be created. This may be due to size constraints or because one or more required asset files for the APIP Items cannot be located. |
|
Main Success Scenario: |
At receipt of the export request the system/application/tool responsible for the export identifies and collates all of the appropriate APIP Items and asset files. The APIP interchange file is then created and stored. |
|
Exception Conditions: |
· The APIP manifest cannot be created; · APIP Item(s) cannot be created. |
|
Use Case Title: |
To Import a Set of APIP Tests |
|
Brief Description: |
Upon request a set of APIP Tests, and the associated APIP Items, is imported from a source digital repository into either a target digital repository or an authoring tool. |
|
Level: |
Summary |
|
Actors: |
APIP Database, Authoring Tool |
|
Trigger: |
A user of an Authoring Tool or the APIP Database administrator requests the import of a set of APIP Tests. |
|
Preconditions: |
The set of APIP Tests, and the associated APIP Items, are available for import in the form of an interchange file compliant with the APIP format. |
|
Success Post-condition: |
The set of APIP Tests, and the associated set of APIP Items, are available in the new digital repository/authoring tool and available for editing, etc. |
|
Failure Post-condition: |
The set of APIP Tests are not imported due to a problem in the interchange file. Some of the Tests may be successfully imported. The problems may be in the APIP Tests and/or the APIP Items. |
|
Main Success Scenario: |
At receipt of the import request the system/application imports the interchange file into the target system/application (the manner of the import is outside the scope of this standard). The set of APIP Tests and Items are identified and stored in a form appropriate for the local system/application. All of the corresponding video, audio, image, etc. files are also stored appropriately. |
|
Exception Conditions: |
N/A |
|
Use Case Title: |
To Export a Set of APIP Tests |
|
Brief Description: |
Upon request the set of APIP Tests, and the associated APIP Items, is exported from a source digital repository or an authoring tool into an independent APIP interchange file that is stored where appropriate e.g. in a file store. |
|
Level: |
Summary |
|
Actors: |
APIP Database, Authoring Tool |
|
Trigger: |
A user of an Authoring Tool or the APIP Database administrator requests the export of a set of APIP Tests. |
|
Preconditions: |
The set of APIP Tests, and the associated APIP Items, are available for export in the form suitable to the system/application/tool that will perform the export operation. |
|
Success Post-condition: |
The APIP interchange file has been created and stored. |
|
Failure Post-condition: |
The APIP interchange file cannot be created. This may be due to size constraints or because one or more required APIP Items for the APIP Tests cannot be located. |
|
Main Success Scenario: |
At receipt of the export request the system/application/tool responsible for the export identifies and collates all of the appropriate APIP Tests, the associated APIP Items and asset files. The APIP interchange file is then created and stored. |
|
Exception Conditions: |
N/A |
|
Use Case Title: |
To Load an APIP Test |
|
Brief Description: |
When a learner activates an assessment, the assessment system loads in the APIP Test and configures it according to the learning and accessibility preferences of the learner. The assessment system selects the parts of the APIP Test that support the learning and accessibility preferences of the learner. |
|
Level: |
Summary |
|
Actors: |
Assessment System |
|
Trigger: |
A learner activates an assessment sessions while working with their LMS, local assessment system, or external assessment system. |
|
Preconditions: |
The APIP Test, and the associated APIP Items, is available for loading in the form of an interchange file compliant with the APIP format. |
|
Success Post-condition: |
The APIP Test has been loaded into the assessment system. The start of the APIP Test is presented to the learner and the set of related APIP Items have been identified and marked for loading into the assessment systems. |
|
Failure Post-condition: |
The APIP Test becomes marked as unavailable. The problems may be in the availability of APIP Items and/or the asset files. |
|
Main Success Scenario: |
At receipt of the APIP Test launch request by the learner, the APIP Test is loaded from the repository. This APIP file contains only the description of the test and the links to the set of related APIP Items, i.e., the APIP Items are not loaded into the assessment system as part of the load APIP Test call. |
|
Exception Conditions: |
N/A |
NOTE: This use case is not addressed in Version 1.0.
|
Use Case Title: |
To Load an APIP Item |
|
Brief Description: |
When a learner activates an assessment, the assessment system loads the APIP Test and configures it according to the learning and accessibility preferences of the learner. The assessment system loads the relevant APIP Items (it is the assessment system that determines when the APIP Items are to be loaded and this may be implementation specific). |
|
Level: |
Summary |
|
Actors: |
Assessment System |
|
Trigger: |
A learner activates an assessment sessions while working with their LMS, local assessment system, or external assessment system. The assessment system selects the APIP Items that need to be loaded. |
|
Preconditions: |
The APIP Test has been previously loaded into the assessment system. The associated APIP Items are available for loading in the form of an interchange file compliant with the APIP format. |
|
Success Post-condition: |
The APIP Item(s) have been loaded into the assessment system. Pre-rendering construction has been completed in response to the learning and accessibility preferences of the learner. |
|
Failure Post-condition: |
The APIP Items are unavailable. The problems may be due either to the failure to access/retrieve the associated asset files or it proves impossible to configure the Item as required by the learner’s accessibility and learning preferences. |
|
Main Success Scenario: |
Once the APIP test has been loaded the associated APIP Items are loaded according to the implementation approach of the assessment system. For example, the assessment system may use on-demand loading of APIP Items in real-time as required by the test being presented to the learner, or pre-caching of APIP Items may be used to ensure performance requirements, etc. Once loaded the APIP Item is processed to prepare its rendered form to reflect the learner’s accessibility and learning preferences. |
|
Exception Conditions: |
· The APIP Item is invalid; · The APIP content packaging manifest is missing or invalid. |
|
Use Case Title: |
To Import an APIP Database |
|
Brief Description: |
Upon request a complete APIP Database is imported from a source digital repository into the target digital repository. |
|
Level: |
Summary |
|
Actors: |
APIP Database |
|
Trigger: |
A Database Administrator is requested to make a new APIP Database available in a local repository. |
|
Preconditions: |
The APIP Database is available for import in the form of an interchange file compliant with the APIP format. |
|
Success Post-condition: |
The APIP Database is available in the new digital repository and available for use by APIP-complaint systems. |
|
Failure Post-condition: |
The APIP Database is not imported into the new target database system. |
|
Main Success Scenario: |
At receipt of the import request the digital repository issues an import request identifying the required APIP Database. The APIP Database interchange file is imported into the new repository that unpacks the APIP information and stores it in the appropriate local database form in the local repository (the manner of the import is outside the scope of this standard). The interchange must contain all of the files associated with the APIP Tests and APIP Items, i.e., any video, audio, image, etc. files. |
|
Exception Conditions: |
N/A |
NOTE: This use case is not addressed in Version 1.0.
|
Use Case Title: |
To Export an APIP Database |
|
Brief Description: |
Upon request a complete APIP Database is exported to the APIP interchange format. |
|
Level: |
Summary |
|
Actors: |
APIP Database |
|
Trigger: |
A Database Administrator is requested to export an APIP Database in the APIP interchange format. |
|
Preconditions: |
The APIP Database is available for export. |
|
Success Post-condition: |
The APIP interchange file is ready for use and/or import to some external digital repository. |
|
Failure Post-condition: |
The APIP interchange file has not been created. This may be due to size constraints on the target storage system. |
|
Main Success Scenario: |
At receipt of the export request the digital repository processes the identified APIP Database and creates the APIP interchange file. Each APIP Database is contained in its own APIP interchange file. If the interchange file is copied then either copy can be used to recreate one or more copies of the original APIP Database. The interchange will contain all of the files associated with the tests, i.e., any video, audio, image, etc. files. The relationships between these asset files and the actual test descriptions must be maintained within the new repository. |
|
Exception Conditions: |
N/A |
NOTE: This use case is not addressed in Version 1.0.
|
Use Case Title: |
To Read an APIP Personal & Needs Preference Profile |
|
Brief Description: |
This is the mechanism by which an assessment system is configured to match the accessibility and learning preferences for each and every learner. |
|
Level: |
Summary |
|
Actors: |
Assessment System |
|
Trigger: |
A learner logs into an Assessment System. Therefore, the Assessment System must query the ‘Preferences Server’ to acquire the learner’s accessibility and learning preferences. |
|
Preconditions: |
The learning and accessibility preferences for the learner are available to the Assessment System via a known Preferences Server. |
|
Success Post-condition: |
The Assessment System has received the accessibility and learning preferences. The Assessment System environment for the learner has been configured to reflect those preferences. The Assessment System will be able to tailor any presented tests in an appropriate manner. |
|
Failure Post-condition: |
The Assessment System fails to receive the accessibility and learning preferences information. Consequently, the learner must be asked to provide an alternative source for those preferences. |
|
Main Success Scenario: |
The learner logs into the Assessment System. During the login process, the Assessment System requires its Preferences Server to obtain the accessibility and learning preferences for the user. Once obtained, these preferences are used to configure the Assessment System and any subsequent assessments/tests appropriately (the latter will also require real-time rendering of the APIP Tests and Items to facilitate the accessibility preferences). The preferences are supplied in the form of an APIP Personal Needs and Preferences data file. |
|
Exception Conditions: |
· The XML instance is invalid. |
|
Use Case Title: |
To Use an APIP Item in a Common Cartridge |
|
Brief Description: |
An author wishes to create a learning activity that uses APIP Items. The learning activity is to be stored in an IMS Common Cartridge. |
|
Level: |
Summary |
|
Actors: |
Authoring Tool |
|
Trigger: |
A user of an Authoring Tool wishes to create a Common Cartridge that contains APIP compliant items. |
|
Preconditions: |
The APIP Items are available for import in the form of an interchange file compliant with the APIP format. |
|
Success Post-condition: |
The APIP Item is inserted in the Common Cartridge to form part of a broader learning activity. All of the appropriate Common Cartridge packaging rules are fulfilled. The LTI links will be defined to identify the associated third-party player. |
|
Failure Post-condition: |
The APIP Item is not imported due to a problem in the interchange file. The problems may be in the availability of the asset files. |
|
Main Success Scenario: |
At receipt of the import request the authoring tool imports the interchange file into the target system/application (the manner of the import is outside the scope of this standard). The APIP Item(s) are identified and stored in the Common cartridge format. All of the corresponding video, audio, image, etc. files are also stored appropriately. |
|
Exception Conditions: |
N/A |
NOTE: This use case is not addressed in Version 1.0.
|
Use Case Title: |
To Use an APIP Test in a Common Cartridge |
|
Brief Description: |
An author wishes to create an APIP compliant Test as part of a learning activity that is to be stored in an IMS Common Cartridge. |
|
Level: |
Summary |
|
Actors: |
Authoring Tool |
|
Trigger: |
A user of an Authoring Tool wishes to create a Common Cartridge that contains APIP compliant test and items. |
|
Preconditions: |
The APIP Test, and the associated APIP Items, is available for import in the form of an interchange file compliant with the APIP format. |
|
Success Post-condition: |
The APIP Test, and the associated set of APIP Items, is inserted in the Common Cartridge to form part of a broader learning activity. The LTI links will be defined to identify the associated third party player. |
|
Failure Post-condition: |
The APIP Test is not imported due to a problem in the interchange file. The problems may be in the availability of APIP Items and/or the asset files. |
|
Main Success Scenario: |
At receipt of the import request the authoring tool imports the interchange file into the target system/application (the manner of the import is outside the scope of this standard). The APIP Test and the associated APIP Items are identified and stored in the Common cartridge format. All of the corresponding video, audio, image, etc. files are also stored appropriately. |
|
Exception Conditions: |
N/A |
NOTE: This use case is not addressed in Version 1.0.
Title: IMS Global Accessible Portable Item Protocol (APIP) Use Cases
Editors: Colin Smythe (IMS Global) and Mark McKell (IMS Global)
Co-chairs: Gary Driscoll ETS (USA), Thomas Hoffmann (Measured Progress) and Wayne Ostler (Pearson)
Version: 1.0
Version Date: 26 March 2012
Release: Draft 1.0
Status: Candidate Final Release
Summary: The aim of the APIP Project is to use well established e-learning interoperability standards to enable the exchange of accessible assessment content between computer-based assessment systems, tools and applications. Users of systems, tools and applications that adopt the APIP are able to use their accessible assessment content on a wide range of systems. This document contains the use cases addressed by the APIP standard.
Revision Information: First release.
Purpose: This document is made available for adoption by the public community at large.
Document Location: http://www.imsglobal.org/apip/
The following individuals contributed to the development of this document:
|
Rob Abel IMS Global (USA) |
Devin Loftis McGraw-Hill/CTB (USA) |
|
Gary Driscoll ETS (USA) |
Mark McKell IMS Global (USA) |
|
Eric Hansen ETS (USA) |
Wayne Ostler Pearson (USA) |
|
Casey Hill ETS (USA) |
Zack Pierce Measured Progress (USA) |
|
Regina Hoag ETS (USA) |
Mike Russell Measured Progress (USA) |
|
Thomas Hoffmann Measured Progress (USA) |
Colin Smythe IMS Global (UK) |
|
Version No. |
Release Date |
Comments |
|
Candidate Final v1.0 |
26 March 2012 |
The first formal release of the Candidate Final version of this document. |
|
|
|
|
|
|
|
|
IMS Global Learning Consortium, Inc. (“IMS Global”) is publishing the information contained in this document (“Specification”) for purposes of scientific, experimental, and scholarly collaboration only.
IMS Global makes no warranty or representation regarding the accuracy or completeness of the Specification.
This material is provided on an “As Is” and “As Available” basis.
The Specification is at all times subject to change and revision without notice.
It is your sole responsibility to evaluate the usefulness, accuracy, and completeness of the Specification as it relates to you.
IMS Global would appreciate receiving your comments and suggestions.
Please contact IMS Global through our website at http://www.imsglobal.org.
Please refer to Document Name: IMS APIP Use Cases v1.0 Candidate Final Release v1.0
Date: 26 March 2012
[1] The IMS Common Cartridge specification has increasing adoption around the world. It is based upon the IMS Content Packaging and QTI specifications (and several others) and significantly improves content interoperability by mandating widely agreed best practices.