Showing:

Annotations
Diagrams
Facets
Instances
Properties
Source
Used by

4.2 Core Profile Data Model XSD Documentation

Group by:
Main schema imsafa3p0pnp_corev1p0.xsd
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Annotations

XSD Data File Information

Author: Colin Smythe (IMS Global) Date: 31st August, 2012 Version: Final 3.0 Status: Public Draft Description: This is the PSM for the Core Profile for the Access For All Personal Needs and Preferences (PNP) data model. History: Version 3.0: This supercedes the original IMS Global AfA PNP v3.0 data model (also the binding for ISO /IEC 24751-2:2008(E) standard). PROFILE: This is the "AfA PNP Core". THIS IS A PROFILE OF THE BASE SPECIFICATION. The changes to the base specification are: * The "AdaptationDetailRequired" class/complexType and set of XML attributes have been deleted; * The "AdaptationMediaRequired" class/complexType and set of XML attributes have been deleted; * The "Access_For_All_User" class/complexType has been modified by:- - The "educationalLevelOfAdaptation" attribute has been prohibited; - The "extension" attribute has been prohibited; * The "AccessModeVocabulary" class/complexType has been modified by:- - The "itemSize" attribute has been prohibited; - The "olfactory" attribute has been prohibited; - The "orientation" attribute has been prohibited; - The "position" attribute has been prohibited; * The "ExtensionString" class/complexType has been modified by:- - The "pattern" attribute has been assigned a new default value; License: IPR, License and Distribution Notices This machine readable file is derived from IMS Global specification IMS Access for All (AfA) Personal Needs and Preferences (PNP) Version 3.0 found at http://www.imsglobal.org/afa and the original IMS Global schema binding or code base http://www.imsglobal.org/afa. Recipients of this document are requested to submit, with their comments, notification of any relevant patent claims or other intellectual property rights of which they may be aware that might be infringed by the schema binding contained in this document. IMS GLC takes no position regarding the validity or scope of any intellectual property or other rights that might be claimed to pertain to the implementation or use of the technology described in this document or the extent to which any license under such rights might or might not be available; neither does it represent that it has made any effort to identify any such rights. Information on IMS Global procedures with respect to rights in IMS Global specifications can be found at the IMS Global Intellectual Property Rights web page: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf. Copyright (c) IMS Global Learning Consortium 1999-2012. All Rights Reserved. License Notice for Users Users of products or services that include this document are hereby granted a worldwide, royalty-free, non-exclusive license to use this document. Distribution Notice for Developers Developers of products or services that are not original incorporators of this document and have not changed this document, that is, are distributing a software product that incorporates this document as is from a third-party source other than IMS, are hereby granted permission to copy, display and distribute the contents of this document in any medium for any purpose without fee or royalty provided that you include this IPR, License and Distribution notice in its entirety on ALL copies, or portions thereof. Developers of products or services that are original incorporators of this document and wish to provide distribution of this document as is or with modifications and developers of products and services that are not original incorporators of this document and have changed this document, are required to register with the IMS GLC community on the IMS GLC website as described in the following two paragraphs:- * If you wish to distribute this document as is, with no modifications, you are hereby granted permission to copy, display and distribute the contents of this document in any medium for any purpose without fee or royalty provided that you include this IPR, License and Distribution notice in its entirety on ALL copies, or portions thereof, that you make and you complete a valid license registration with IMS and receive an email from IMS granting the license. To register, follow the instructions on the IMS website: http://www.imsglobal.org/specificationdownload.cfm. Once registered you are granted permission to transfer unlimited distribution rights of this document for the purposes of third-party or other distribution of your product or service that incorporates this document as long as this IPR, License and Distribution notice remains in place in its entirety; * If you wish to create and distribute a derived work from this document, you are hereby granted permission to copy, display and distribute the contents of the derived work in any medium for any purpose without fee or royalty provided that you include this IPR, License and Distribution notice in its entirety on ALL copies, or portions thereof, that you make and you complete a valid profile registration with IMS GLC and receive an email from IMS GLC granting the license. To register, follow the instructions on the IMS GLC website: http://www.imsglobal.org/profile/. Once registered you are granted permission to transfer unlimited distribution rights of the derived work for the purposes of third-party or other distribution of your product or service that incorporates the derived work as long as this IPR, License and Distribution notice remains in place in its entirety. The limited permissions granted above are perpetual and will not be revoked by IMS GLC or its successors or assigns. THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTERS OWN RISK, AND NEITHER THE CONSORTIUM NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION.

Source UML File Information

The source file information must be supplied as an XMI file (without diagram layout information). The supported UML authoring tools are: (a) Poseidon - v6 (and later)

Source XSLT File Information

XSL Generator: UMLtoXSDTransformv1p0.xsl XSLT Processor: Xalan Release: 1.0 Date: 31st March, 2012 Autogen Engineer: Colin Smythe (IMS GLC, UK) Autogen Date: 2012-05-31

IMS GLC Auto-generation Binding Tool-kit (I-BAT)

This file was auto-generated using the IMS GLC Binding Auto-generation Tool-kit (I-BAT). While every attempt has been made to ensure that this tool auto-generates the files correctly, users should be aware that this is an experimental tool. Permission is given to make use of this tool. IMS GLC makes no claim on the materials created by third party users of this tool. Details on how to use this tool are contained in the IMS GLC "I-BAT" Documentation available at the IMS GLC web-site. Tool Copyright: 2005-2012 (c) IMS Global Learning Consortium Inc. All Rights Reserved.
Properties
attribute form default: unqualified
element form default: qualified
version: IMS AFAPNP CORE V3.0
[ top ]
Element educationalComplexityOfAdaptation
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Diagram
Diagram
Type union of(restriction of xs:string, ExtensionString.Type)
Properties
content: simple
Used by
Source
<xs:element name="educationalComplexityOfAdaptation">
  <xs:simpleType>
    <xs:union>
      <xs:simpleType>
        <xs:restriction base="xs:string">
          <xs:enumeration value="enriched"/>
          <xs:enumeration value="simplified"/>
        </xs:restriction>
      </xs:simpleType>
      <xs:simpleType>
        <xs:restriction base="ExtensionString.Type"/>
      </xs:simpleType>
    </xs:union>
  </xs:simpleType>
</xs:element>
[ top ]
Element hazardAvoidance
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Diagram
Diagram
Type union of(restriction of xs:string, ExtensionString.Type)
Properties
content: simple
Used by
Source
<xs:element name="hazardAvoidance">
  <xs:simpleType>
    <xs:union>
      <xs:simpleType>
        <xs:restriction base="xs:string">
          <xs:enumeration value="flashing"/>
          <xs:enumeration value="sound"/>
          <xs:enumeration value="olfactoryHazard"/>
          <xs:enumeration value="motionSimulation"/>
        </xs:restriction>
      </xs:simpleType>
      <xs:simpleType>
        <xs:restriction base="ExtensionString.Type"/>
      </xs:simpleType>
    </xs:union>
  </xs:simpleType>
</xs:element>
[ top ]
Element inputRequirements
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Diagram
Diagram
Type union of(ExtensionString.Type, restriction of xs:string)
Properties
content: simple
Used by
Source
<xs:element name="inputRequirements">
  <xs:simpleType>
    <xs:union>
      <xs:simpleType>
        <xs:restriction base="ExtensionString.Type"/>
      </xs:simpleType>
      <xs:simpleType>
        <xs:restriction base="xs:string">
          <xs:enumeration value="fullKeyboardControl"/>
          <xs:enumeration value="fullMouseControl"/>
        </xs:restriction>
      </xs:simpleType>
    </xs:union>
  </xs:simpleType>
</xs:element>
[ top ]
Element atInteroperable
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Diagram
Diagram
Type xs:boolean
Properties
content: simple
Used by
Source
<xs:element name="atInteroperable" type="xs:boolean"/>
[ top ]
Element languageOfAdaptation
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Diagram
Diagram
Type xs:normalizedString
Properties
content: simple
Used by
Source
<xs:element name="languageOfAdaptation" type="xs:normalizedString"/>
[ top ]
Element languageOfInterface
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Diagram
Diagram
Type xs:normalizedString
Properties
content: simple
Used by
Source
<xs:element name="languageOfInterface" type="xs:normalizedString"/>
[ top ]
Element accessModeRequired
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Diagram
Diagram test.tmp#AccessModeRequired.Type_existingAccessMode test.tmp#AccessModeRequired.Type_adaptationRequest test.tmp#AccessModeRequired.Type
Type AccessModeRequired.Type
Properties
content: complex
mixed: false
Used by
Model existingAccessMode , adaptationRequest
Children adaptationRequest, existingAccessMode
Instance
<accessModeRequired xmlns="http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0">
  <existingAccessMode>{1,1}</existingAccessMode>
  <adaptationRequest>{1,1}</adaptationRequest>
</accessModeRequired>
Source
<xs:element name="accessModeRequired" type="AccessModeRequired.Type"/>
[ top ]
Element AccessModeRequired.Type / existingAccessMode
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Diagram
Diagram
Type union of(restriction of xs:string, ExtensionString.Type)
Properties
content: simple
minOccurs: 1
maxOccurs: 1
Source
<xs:element name="existingAccessMode" minOccurs="1" maxOccurs="1">
  <xs:simpleType>
    <xs:union>
      <xs:simpleType>
        <xs:restriction base="xs:string">
          <xs:enumeration value="auditory"/>
          <xs:enumeration value="colour"/>
          <xs:enumeration value="tactile"/>
          <xs:enumeration value="textOnImage"/>
          <xs:enumeration value="textual"/>
          <xs:enumeration value="visual"/>
        </xs:restriction>
      </xs:simpleType>
      <xs:simpleType>
        <xs:restriction base="ExtensionString.Type"/>
      </xs:simpleType>
    </xs:union>
  </xs:simpleType>
</xs:element>
[ top ]
Element AccessModeRequired.Type / adaptationRequest
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Diagram
Diagram
Type union of(restriction of xs:string, ExtensionString.Type)
Properties
content: simple
minOccurs: 1
maxOccurs: 1
Source
<xs:element name="adaptationRequest" minOccurs="1" maxOccurs="1">
  <xs:simpleType>
    <xs:union>
      <xs:simpleType>
        <xs:restriction base="xs:string">
          <xs:enumeration value="auditory"/>
          <xs:enumeration value="colour"/>
          <xs:enumeration value="tactile"/>
          <xs:enumeration value="textOnImage"/>
          <xs:enumeration value="textual"/>
          <xs:enumeration value="visual"/>
        </xs:restriction>
      </xs:simpleType>
      <xs:simpleType>
        <xs:restriction base="ExtensionString.Type"/>
      </xs:simpleType>
    </xs:union>
  </xs:simpleType>
</xs:element>
[ top ]
Element adaptationTypeRequired
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Diagram
Diagram test.tmp#AdaptationTypeRequired.Type_existingAccessMode test.tmp#AdaptationTypeRequired.Type_adaptationRequest test.tmp#AdaptationTypeRequired.Type
Type AdaptationTypeRequired.Type
Properties
content: complex
mixed: false
Used by
Model existingAccessMode , adaptationRequest
Children adaptationRequest, existingAccessMode
Instance
<adaptationTypeRequired xmlns="http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0">
  <existingAccessMode>{1,1}</existingAccessMode>
  <adaptationRequest>{1,1}</adaptationRequest>
</adaptationTypeRequired>
Source
<xs:element name="adaptationTypeRequired" type="AdaptationTypeRequired.Type"/>
[ top ]
Element AdaptationTypeRequired.Type / existingAccessMode
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Diagram
Diagram
Type union of(restriction of xs:string, ExtensionString.Type)
Properties
content: simple
minOccurs: 1
maxOccurs: 1
Source
<xs:element name="existingAccessMode" minOccurs="1" maxOccurs="1">
  <xs:simpleType>
    <xs:union>
      <xs:simpleType>
        <xs:restriction base="xs:string">
          <xs:enumeration value="auditory"/>
          <xs:enumeration value="colour"/>
          <xs:enumeration value="tactile"/>
          <xs:enumeration value="textOnImage"/>
          <xs:enumeration value="textual"/>
          <xs:enumeration value="visual"/>
        </xs:restriction>
      </xs:simpleType>
      <xs:simpleType>
        <xs:restriction base="ExtensionString.Type"/>
      </xs:simpleType>
    </xs:union>
  </xs:simpleType>
</xs:element>
[ top ]
Element AdaptationTypeRequired.Type / adaptationRequest
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Diagram
Diagram
Type union of(restriction of xs:string, ExtensionString.Type)
Properties
content: simple
minOccurs: 1
maxOccurs: 1
Source
<xs:element name="adaptationRequest" minOccurs="1" maxOccurs="1">
  <xs:simpleType>
    <xs:union>
      <xs:simpleType>
        <xs:restriction base="xs:string">
          <xs:enumeration value="alternativeText"/>
          <xs:enumeration value="audioDescription"/>
          <xs:enumeration value="captions"/>
          <xs:enumeration value="e-book"/>
          <xs:enumeration value="haptic"/>
          <xs:enumeration value="highContrast"/>
          <xs:enumeration value="longDescription"/>
          <xs:enumeration value="signLanguage"/>
          <xs:enumeration value="transcript"/>
        </xs:restriction>
      </xs:simpleType>
      <xs:simpleType>
        <xs:restriction base="ExtensionString.Type"/>
      </xs:simpleType>
    </xs:union>
  </xs:simpleType>
</xs:element>
[ top ]
Element accessForAllUser
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Diagram
Diagram test.tmp#accessModeRequired test.tmp#adaptationTypeRequired test.tmp#atInteroperable test.tmp#educationalComplexityOfAdaptation test.tmp#hazardAvoidance test.tmp#inputRequirements test.tmp#languageOfAdaptation test.tmp#languageOfInterface test.tmp#Access_For_All_User.Type
Type Access_For_All_User.Type
Properties
content: complex
mixed: false
Model accessModeRequired* , adaptationTypeRequired* , atInteroperable{0,1} , educationalComplexityOfAdaptation{0,1} , hazardAvoidance* , inputRequirements{0,1} , languageOfAdaptation* , languageOfInterface*
Children accessModeRequired, adaptationTypeRequired, atInteroperable, educationalComplexityOfAdaptation, hazardAvoidance, inputRequirements, languageOfAdaptation, languageOfInterface
Instance
<accessForAllUser xmlns="http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0">
  <accessModeRequired>{0,unbounded}</accessModeRequired>
  <adaptationTypeRequired>{0,unbounded}</adaptationTypeRequired>
  <atInteroperable>{0,1}</atInteroperable>
  <educationalComplexityOfAdaptation>{0,1}</educationalComplexityOfAdaptation>
  <hazardAvoidance>{0,unbounded}</hazardAvoidance>
  <inputRequirements>{0,1}</inputRequirements>
  <languageOfAdaptation>{0,unbounded}</languageOfAdaptation>
  <languageOfInterface>{0,unbounded}</languageOfInterface>
</accessForAllUser>
Source
<xs:element name="accessForAllUser" type="Access_For_All_User.Type"/>
[ top ]
Simple Type ExtensionString.Type
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Diagram
Diagram
Type restriction of xs:string
Facets
pattern 123456789_To_Effectively_Make_The_Extension_Unavailable_987654321
Source
<xs:simpleType name="ExtensionString.Type">
  <xs:restriction base="xs:string">
    <xs:pattern value="123456789_To_Effectively_Make_The_Extension_Unavailable_987654321"/>
  </xs:restriction>
</xs:simpleType>
[ top ]
Complex Type Access_For_All_User.Type
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Annotations

umldocumentation

The Access_for_All_User complexType is the container for a collection of information that contains the set of preferences and needs statements for a user.
[AfA PNP Core] Profile - the changes to the XML element list are:
* The "educationalLevelOfAdaptation" element has been prohibited;
* The "extension" element has been prohibited;
Diagram
Diagram test.tmp#accessModeRequired test.tmp#adaptationTypeRequired test.tmp#atInteroperable test.tmp#educationalComplexityOfAdaptation test.tmp#hazardAvoidance test.tmp#inputRequirements test.tmp#languageOfAdaptation test.tmp#languageOfInterface
Properties
mixed: false
Used by
Model accessModeRequired* , adaptationTypeRequired* , atInteroperable{0,1} , educationalComplexityOfAdaptation{0,1} , hazardAvoidance* , inputRequirements{0,1} , languageOfAdaptation* , languageOfInterface*
Children accessModeRequired, adaptationTypeRequired, atInteroperable, educationalComplexityOfAdaptation, hazardAvoidance, inputRequirements, languageOfAdaptation, languageOfInterface
Source
<xs:complexType name="Access_For_All_User.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The Access_for_All_User complexType is the container for a collection of information that contains the set of preferences and needs statements for a user. [AfA PNP Core] Profile - the changes to the XML element list are: * The "educationalLevelOfAdaptation" element has been prohibited; * The "extension" element has been prohibited;</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element ref="accessModeRequired" minOccurs="0" maxOccurs="unbounded"/>
    <xs:element ref="adaptationTypeRequired" minOccurs="0" maxOccurs="unbounded"/>
    <xs:element ref="atInteroperable" minOccurs="0" maxOccurs="1"/>
    <xs:element ref="educationalComplexityOfAdaptation" minOccurs="0" maxOccurs="1"/>
    <xs:element ref="hazardAvoidance" minOccurs="0" maxOccurs="unbounded"/>
    <xs:element ref="inputRequirements" minOccurs="0" maxOccurs="1"/>
    <xs:element ref="languageOfAdaptation" minOccurs="0" maxOccurs="unbounded"/>
    <xs:element ref="languageOfInterface" minOccurs="0" maxOccurs="unbounded"/>
  </xs:sequence>
</xs:complexType>
[ top ]
Complex Type AccessModeRequired.Type
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Annotations

umldocumentation

The AccessModeRequired complexType is the container for describing the relationship between the existing access mode and the adaptation value required.
Diagram
Diagram test.tmp#AccessModeRequired.Type_existingAccessMode test.tmp#AccessModeRequired.Type_adaptationRequest
Properties
mixed: false
Used by
Model existingAccessMode , adaptationRequest
Children adaptationRequest, existingAccessMode
Source
<xs:complexType name="AccessModeRequired.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The AccessModeRequired complexType is the container for describing the relationship between the existing access mode and the adaptation value required.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element name="existingAccessMode" minOccurs="1" maxOccurs="1">
      <xs:simpleType>
        <xs:union>
          <xs:simpleType>
            <xs:restriction base="xs:string">
              <xs:enumeration value="auditory"/>
              <xs:enumeration value="colour"/>
              <xs:enumeration value="tactile"/>
              <xs:enumeration value="textOnImage"/>
              <xs:enumeration value="textual"/>
              <xs:enumeration value="visual"/>
            </xs:restriction>
          </xs:simpleType>
          <xs:simpleType>
            <xs:restriction base="ExtensionString.Type"/>
          </xs:simpleType>
        </xs:union>
      </xs:simpleType>
    </xs:element>
    <xs:element name="adaptationRequest" minOccurs="1" maxOccurs="1">
      <xs:simpleType>
        <xs:union>
          <xs:simpleType>
            <xs:restriction base="xs:string">
              <xs:enumeration value="auditory"/>
              <xs:enumeration value="colour"/>
              <xs:enumeration value="tactile"/>
              <xs:enumeration value="textOnImage"/>
              <xs:enumeration value="textual"/>
              <xs:enumeration value="visual"/>
            </xs:restriction>
          </xs:simpleType>
          <xs:simpleType>
            <xs:restriction base="ExtensionString.Type"/>
          </xs:simpleType>
        </xs:union>
      </xs:simpleType>
    </xs:element>
  </xs:sequence>
</xs:complexType>
[ top ]
Complex Type AdaptationTypeRequired.Type
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Annotations

umldocumentation

The AdaptationTypeRequired complexType is the container for describing the relationship between the existing access mode and the adaptation value required.
Diagram
Diagram test.tmp#AdaptationTypeRequired.Type_existingAccessMode test.tmp#AdaptationTypeRequired.Type_adaptationRequest
Properties
mixed: false
Used by
Model existingAccessMode , adaptationRequest
Children adaptationRequest, existingAccessMode
Source
<xs:complexType name="AdaptationTypeRequired.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The AdaptationTypeRequired complexType is the container for describing the relationship between the existing access mode and the adaptation value required.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element name="existingAccessMode" minOccurs="1" maxOccurs="1">
      <xs:simpleType>
        <xs:union>
          <xs:simpleType>
            <xs:restriction base="xs:string">
              <xs:enumeration value="auditory"/>
              <xs:enumeration value="colour"/>
              <xs:enumeration value="tactile"/>
              <xs:enumeration value="textOnImage"/>
              <xs:enumeration value="textual"/>
              <xs:enumeration value="visual"/>
            </xs:restriction>
          </xs:simpleType>
          <xs:simpleType>
            <xs:restriction base="ExtensionString.Type"/>
          </xs:simpleType>
        </xs:union>
      </xs:simpleType>
    </xs:element>
    <xs:element name="adaptationRequest" minOccurs="1" maxOccurs="1">
      <xs:simpleType>
        <xs:union>
          <xs:simpleType>
            <xs:restriction base="xs:string">
              <xs:enumeration value="alternativeText"/>
              <xs:enumeration value="audioDescription"/>
              <xs:enumeration value="captions"/>
              <xs:enumeration value="e-book"/>
              <xs:enumeration value="haptic"/>
              <xs:enumeration value="highContrast"/>
              <xs:enumeration value="longDescription"/>
              <xs:enumeration value="signLanguage"/>
              <xs:enumeration value="transcript"/>
            </xs:restriction>
          </xs:simpleType>
          <xs:simpleType>
            <xs:restriction base="ExtensionString.Type"/>
          </xs:simpleType>
        </xs:union>
      </xs:simpleType>
    </xs:element>
  </xs:sequence>
</xs:complexType>
[ top ]
Element Group grpStrict.any
Namespace http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0
Annotations
Any namespaced element from any namespace may be included within an "any" element.
The namespace for the imported element must be defined in the instance, and the schema must be imported.
The extension has a definition of "strict" i.e. they must have their own namespace.
Diagram
Diagram
Model ANY element from ANY namespace OTHER than 'http://www.imsglobal.org/xsd/accessibility/afapnpv3p0/imsafa3p0pnp_corev1p0'
Source
<xs:group name="grpStrict.any">
  <xs:annotation>
    <xs:documentation>Any namespaced element from any namespace may be included within an "any" element. The namespace for the imported element must be defined in the instance, and the schema must be imported. The extension has a definition of "strict" i.e. they must have their own namespace.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:any namespace="##other" processContents="strict" minOccurs="0" maxOccurs="unbounded"/>
  </xs:sequence>
</xs:group>
[ top ]