1 Introduction
1.1 Access For All Overview
á A learnerÕs needs and preferences with respect to how the learner can best interact with digital resources, [1] . This is represented using the IMS Global Access For All Personal Needs and Preferences (PNP ) v3.0 [AfAPNP, 12] specification;
á Digital learning resources. This is represented using the IMS Global Access For All Digital Resource Description (DRD ) v3.0 [AfADRD, 12] specification.
1.2 Scope and Context
This part of the AfA specification provides the common vocabulary and terms used in both the DRD and PNP information model specifications [AfADRD, 12], [AfAPNP, 12].
The Data Element Specification (DES) vocabulary is defined as a set of classes used in the information model definitions. Each class includes a definition, its range of values, and a linguistic indicator. The possible value terms are defined in the DES. Each term provides a definition, a linguistic indicator, a value, content value rules, and a reference to terms the term is a refinement of.
1.3 Structure of this Document
The structure of this document is:
|
1. Terminology |
Definitions of the key terms for the AfA v3.0 specification as a whole; |
|
2. Vocabulary Classes |
The set of vocabulary classes used within the AfA DRD and AfA PNP definitions; |
|
3. Vocabulary Terms |
Definition of the vocabulary terms that are used as the values for the set of vocabulary classes. |
1.4 Nomenclature
AfA Access For All
AfA DRD Access For All Digital Resource Description
AfA PNP Access For All Personal Needs & Preferences
API Application Programming Interface
ARIA Accessible Rich Internet Applications
ASCII American Standard Code for Information Interchange
AT Assistive Technology
AT-SPI Assistive Technology Service Provider Interface
ATK Accessibility Toolkit
DAISY Digital Accessible Information System
DRD Digital Resource Description
IMS Global IMS Global Learning Consortium Inc.
ISO International Standards Organization
MSAA Microsoft Active Accessibility
NIMAS National Instructional Materials Accessibility Standard
OEBPS Open eBook Publication Structure
PDF Portable Document Format
PEF Portable Embosser Format
PNP Personal Needs & Preferences
UML Unified Modeling Language
URI Uniform Resource Identifier
W3C World Wide Web Consortium
WAI Web Accessibility Initiative
WCAG Web Content Accessibility Guidelines
XML Extensible Mark-up Language
1.5 References
[AfADRD, 12] IMS Global Access For All Digital Resource Description Information Model v3.0 , R.Schwerdtfeger, M.Rothberg and C.Smythe, CM/DN Release, IMS Global Inc., September 2012.
[AfAPNP, 12] IMS Global Access For All Personal Needs & Preferences Information Model v3.0, R.Schwerdtfeger, M.Rothberg and C.Smythe, CM/DN Release, IMS Global Inc., September 2012.
[ISO639, 98] ISO 639-2:1998 (E/F), Codes for the representation of names of languages — Part 2: Alpha-3 code/Codes pour la reprŽsentation des noms de langue — Partie 2: Code alpha-3 .
[RFC4646] RFC 4646: Tags for identifying Languages , A.Phillips and M.Davis, The Internet Society, September 2006.
[WCAG2, 98]
W3C
/WAI
Web Content Accessibility
Guidelines
2.0 [W3C/WAI WCAG
], W3C, 1998
{
http://www.w3.org/TR/2008/REC-WCAG20-20081211/
}.
2 Vocabulary Classes
This is the set of vocabulary classes that are used by the set of AfA DRD and AfA PNP attributes. The vocabulary terms in each of the enumerated lists are defined in Section 3.
2.1 AccessibilityAPI
|
Name: |
AccessibilityAPI |
|---|---|
|
Definition: |
Term identifying an adaptive technology API for reference in resource metadata. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
Enumerated set: {AndroidAccessibility | ARIAv1 | ATK | AT-SPI | BlackberryAccessibility | iAccessible2 | JavaAccessibility | MacOSXAccessibility | MSAA | UIAutomation }. |
2.2 AccessModeValue
|
Name: |
AccessModeValue |
|---|---|
|
Definition: |
Human sensory perceptual system or cognitive faculty through which a person may process or perceive information. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
The enumeration set is: { auditory | colour | itemSize | olfactory | orientation | position | tactile | textOnImage | textual | visual }. |
2.3 AdaptationDetailValue
|
Name: |
AdaptationDetailValue |
|---|---|
|
Definition: |
Term that gives fine detail of one or more adaptation type values. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
Enumeration set: { enhanced | realTime | recorded | symbolic | synthesized | verbatim }. |
2.4 AdaptationMediaTypeValue
|
Name: |
AdaptationMediaTypeValue |
|---|---|
|
Definition: |
Term identifying a media type commonly used to aggregate accessibility modalities or functionalities as media. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
Enumeration set: { braille | ChemML | Daisy | EPUB3 | LaTex | LIT | MathML | Nemeth | NIMAS | OEBPS | PD F }. |
2.5 AdaptationTypeValue
|
Name: |
AdaptationTypeValue |
|---|---|
|
Definition: |
Term describing an adaptation type. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
Enumerated set: { alternativeText | audioDescription | captions | e-book | haptic | highContrast | longDescription | signLanguage | transcript } |
2.6 ControlFlexibilityValue
|
Name: |
ControlFlexibilityValue |
|---|---|
|
Definition: |
Term describing an input method. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
Enumerated set: { fullKeyboardControl | fullMouseControl } |
2.7 DisplayTransformabilityValue
|
Name: |
DisplayTransformabilityValue |
|---|---|
|
Definition: |
Term describing a characteristic of a resource display that can be modified. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
Enumerated set: { backgroundColour | cursorPresentation | fontFace | fontSize | fontWeight | foregroundColour | highlightPresentation | layout | letterSpacing | lineHeight | structurePresentation | wordSpacing } |
2.8 EducationalComplexityValue
|
Name: |
EducationalComplexityValue |
|---|---|
|
Definition: |
Term describing a resource that is simplified or enriched relative to another resource that presents the same intellectual content. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
Enumerated set: { simplified | enriched } |
2.9 HazardValue
|
Name: |
HazardValue |
|---|---|
|
Definition: |
Term describing a characteristic of the described resource that must not be delivered to some users. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
Enumerated set: { flashing | motionSimulation | olfactoryHazard | sound } |
3 Vocabulary Terms
This is the set of terms, or tokens, that are used as the value ranges for the vocabulary classes defined in Section 2.
3.1 AlternativeText
|
Name: |
alternativeText |
|---|---|
|
Definition: |
Text that is programmatically associated with non-text content and that serves the equivalent purpose (WCAG2).
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.2 AndroidAccessibility
|
Name: |
androidAccessibility |
|---|---|
|
Definition: |
Indicates support of the Android Access API.
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.3 ARIAv1
|
Name: |
ARIAv1 |
|---|---|
|
Definition: |
Indicates the content supports W3C WAI-ARIA Accessible Rich Internet Applications version 1 (defined in http://www.w3.org/TR/wai-aria/). |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.4 ATK
|
Name: |
ATK |
|---|---|
|
Definition: |
Indicates the application provides support for the Gnome Accessibility Toolkit API, used in Unix applications (KDE and Gnome desktops).
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.5 AT-SPI
|
Name: |
AT-SPI |
|---|---|
|
Definition: |
Indicates the application provides support for the Gnome Assistive Technology Service Provider Interface, used by assistive technologies to access accessible Unix applications.
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.6 AudioDescription
|
Name: |
audioDescription |
|---|---|
|
Definition: |
Narration has been added to the soundtrack to describe important visual details that cannot be understood from the main soundtrack alone (WCAG2).
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.7 Auditory
|
Name: |
auditory |
|---|---|
|
Definition: |
Information is conveyed that requires the sense of hearing. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
N/A |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.8 BackgroundColour
|
Name: |
backgroundColour |
|---|---|
|
Definition: |
Indicates the ability to manipulate the background colour of a resourceÕs text content. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.9 BlackberryAccessibility
|
Name: |
BlackberryAccessibility |
|---|---|
|
Definition: |
Indicates the application provides support for the Blackberry Accessibility API for Blackberry Java Applications:
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.10 Braille
|
Name: |
braille |
|---|---|
|
Definition: |
Indicates that the resource is formatted in an electronic data format for representing braille books. Braille is a tactile system of raised dots representing letters of the alphabet:
One example of an electronic braille format is Portable Embosser Format (PEF):
Another example is BRF, a version of braille ASCI:
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.11 Captions
|
Name: |
captions |
|---|---|
|
Definition: |
Synchronized visual and/or text alternative for both speech and non-speech audio information needed to understand the media content (WCAG2):
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.12 ChemML
|
Name: |
ChemML |
|---|---|
|
Definition: |
Indicates that the resource is formatted using ChemML(Chemical Markup Language), an XML-based markup language for the management of chemical information:
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.13 Colour
|
Name: |
colour |
|---|---|
|
Definition: |
Information is conveyed that requires the ability to perceive colour. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
N/A |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.14 CursorPresentation
|
Name: |
cursorPresentation |
|---|---|
|
Definition: |
Indicates the ability to change the mouse cursor type. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.15 DAISY
|
Name: |
DAISY |
|---|---|
|
Definition: |
Indicates that the resource is formatted using DAISY (the Digital Accessible Information System), a digital talking book format.
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.16 E-book
|
Name: |
e-book |
|---|---|
|
Definition: |
Electronic book, a book published in electronic form:
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.17 Enhanced
|
Name: |
enhanced |
|---|---|
|
Definition: |
An adaptation with more extensive forms of alternative than the standard for that kind of adaptation; enhanced captions might include images or speech bubbles, and enhanced audio description might pause the video to insert extra audio. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.18 Enriched
|
Name: |
enriched |
|---|---|
|
Definition: |
Indicates a resource that presents the same intellectual content as another resource but at a higher education level or with more complexity. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.19 EPUB3
|
Name: |
EPUB3 |
|---|---|
|
Definition: |
Indicates that the resource is formatted using EPUB3, a distribution and interchange format standard for digital publications and documents.
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.20 Flashing
|
Name: |
flashing |
|---|---|
|
Definition: |
A resource whose visual pattern flashes more than three times in any one second; this level of flashing can cause seizures in some users (WCAG2 Guideline 2.3.2):
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.21 FontFace
|
Name: |
fontFace |
|---|---|
|
Definition: |
Indicates that the face of the font may be manipulated. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.22 FontSize
|
Name: |
fontSize |
|---|---|
|
Definition: |
Indicates that the size of the font may be manipulated. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.23 FontWeight
|
Name: |
fontWeight |
|---|---|
|
Definition: |
Indicates that the weight of glyphs in the font, their degree of blackness or stroke thickness may be manipulated. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.24 ForegroundColour
|
Name: |
foregroundColour |
|---|---|
|
Definition: |
Indicates the ability to manipulate the foreground colour of a resourceÕs text content. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.25 FullKeyboardControl
|
Name: |
fullKeyboardControl |
|---|---|
|
Definition: |
Indicates a resource that can be controlled effectively using only a keyboard. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.26 FullMouseControl
|
Name: |
fullMouseControl |
|---|---|
|
Definition: |
Indicates a resource that can be controlled effectively using only a mouse or other pointing device. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.27 Haptic
|
Name: |
haptic |
|---|---|
|
Definition: |
Of, or relating, to the sensation of touch; used here to identify resources that include force feedback or other three-dimensional interfaces:
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.28 HighContrast
|
Name: |
highContrast |
|---|---|
|
Definition: |
A resource offering an alternative visual version of another resource, with visual presentation of text and images of text that has a contrast ratio of at least 4.5:1, or, for larger text, a contrast ratio of at least 3:1 (WCAG2 Checkpoint 1.4.3):
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.29 HighlightPresentation
|
Name: |
highlightPresentation |
|---|---|
|
Definition: |
Indicates the ability to change the highlight colour of text. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.30 IAccessible2
|
Name: |
IAccessible2 |
|---|---|
|
Definition: |
Indicates the application provides support for the IAccessible2 accessibility API:
IAccessible2 must be used with Microsoft Active Accessibility; used for Windows applications from Windows XP forward. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.31 ItemSize
|
Name: |
itemSize |
|---|---|
|
Definition: |
Information is conveyed that requires the ability to distinguish the relative sizes of items using vision. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
N/A |
|
Content Value Rules: |
String |
|
Related to: |
Refines visual |
3.32 JavaAccessibility
|
Name: |
JavaAccessibility |
|---|---|
|
Definition: |
Indicates the application provides support for the Java accessibility API.
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.33 LaTeX
|
Name: |
LaTeX |
|---|---|
|
Definition: |
Indicates that the resource is formatted to be machine processable by a LaTeX processor. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.34 Layout
|
Name: |
layout |
|---|---|
|
Definition: |
Indicates the ability to change the layout of the resource to facilitate comprehension for a given user. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.35 LetterSpacing
|
Name: |
letterSpacing |
|---|---|
|
Definition: |
Indicates the ability to increases or decreases the space between characters in a text. |
|
Linguistic Indicator: |
Linguistic |
| Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.36 LIT
|
Name: |
LIT |
|---|---|
|
Definition: |
Indicates that the resource is formatted for use with Microsoft Reader, a free electronic book reader from Microsoft. Files stored in this format are named using an extension of ".lit" ( http://www.microsoft.com/reader/ ). |
|
Linguistic Indicator: |
Non-linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.37 LineHeight
|
Name: |
lineHeight |
|---|---|
|
Definition: |
Indicates the ability to manipulate the text line height. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.38 LongDescription
|
Name: |
longDescription |
|---|---|
|
Definition: |
An alternative text that is longer than a few sentences. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.39 MacOSX Accessibility
|
Name: |
MacOSXAccessibility |
|---|---|
|
Definition: |
Indicates the application provides support for the Mac OSX Accessibility Protocol:
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.40 MathML
|
Name: |
MathML |
|---|---|
|
Definition: |
Indicates that the resource is formatted using MathML, an XML-based specification for describing mathematical expressions so that they can be displayed, manipulated and shared over the World Wide Web ( http://www.w3.org/Math/ ). |
|
Linguistic Indicator: |
Non-linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.41 MotionSimulation
|
Name: |
motionSimulation |
|---|---|
|
Definition: |
A resource that simulates motion; this may result in a feeling of nausea to the user. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.42 MSAA
|
Name: |
MSAA |
|---|---|
|
Definition: |
Indicates the application provides support for the Microsoft Active Accessibility API, used for Windows applications from Windows XP forward:
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.43 Nemeth
|
Name: |
Nemeth |
|---|---|
|
Definition: |
Indicates that the resource is formatted using Nemeth (the Nemeth Braille Code for Mathematics), a braille code for encoding mathematical and scientific notation linearly ( http://www.dotlessbraille.org/NemethIntro.htm ). |
|
Linguistic Indicator: |
Non-linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.44 NIMAS
|
Name: |
NIMAS |
|---|---|
|
Definition: |
Indicates that the resource is formatted using NIMAS (National Instructional Materials Accessibility Standard), a technical standard used by publishers to produce source files (in XML) that may be used to develop multiple specialized formats (such as braille or audio books) for students with print disabilities ( http://nimas.cast.org/ ). |
|
Linguistic Indicator: |
Non-linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.45 OEBPS
|
Name: |
OEPBS |
|---|---|
|
Definition: |
Indicates that the resource is formatted using Open eBook Publication Structure (OEBPS) , an XML-based specification for the content, structure, and presentation of electronic books ( http://www.openebook.org/oebps/oebps1.2/index.htm ). |
|
Linguistic Indicator: |
Non-linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.46 Olfactory
|
Name: |
olfactory |
|---|---|
|
Definition: |
Information is conveyed that requires the sense of smell. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
N/A |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.47 OlfactoryHazard
|
Name: |
olfactoryHazard |
|---|---|
|
Definition: |
A resource generating a smell that may generate an allergic reaction [ISO 29138]. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.48 Orientation
|
Name: |
orientation |
|---|---|
|
Definition: |
Information is conveyed that requires the ability to distinguish the direction in which an item is pointing using vision. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
N/A |
|
Content Value Rules: |
String |
|
Related to: |
Refines visual |
3.49 PDF
|
Name: |
|
|---|---|
|
Definition: |
Indicates that the resource is formatted using Portable Document Format (PDF), a common document format used to represent documents in a manner independent of the application software, hardware, and operating system: |
|
Linguistic Indicator: |
Non-linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.50 Position
|
Name: |
position |
|---|---|
|
Definition: |
Information is conveyed that requires the ability to distinguish the relative locations of items using vision. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
N/A |
|
Content Value Rules: |
String |
|
Related to: |
Refines visual |
3.51 RealTime
|
Name: |
realTime |
|---|---|
|
Definition: |
An adaptation produced at the time a resource is being produced; real-time captions are often used for live newscasts. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.52 Recorded
|
Name: |
recorded |
|---|---|
|
Definition: |
An audio adaptation featuring a human voice reading the material. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.53 SignLanguage
|
Name: |
signLanguage |
|---|---|
|
Definition: |
A language using combinations of movements of the hands and arms, facial expressions, or body positions to convey meaning (WCAG2):
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.54 Simplified
|
Name: |
simplified |
|---|---|
|
Definition: |
Indicates a resource that presents the same intellectual content as another resource but at a lower education level or with less complexity. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.55 Sound
|
Name: |
sound |
|---|---|
|
Definition: |
A resource generating audio pattern that can cause the user to have seizures [ISO 29138]. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.56 StructurePresentation
|
Name: |
structurePresentation |
|---|---|
|
Definition: |
Indicates the ability to change the presentation of structured information such as a table of contents or document overview. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.57 Symbolic
|
Name: |
symbolic |
|---|---|
|
Definition: |
An adaptation offering a symbolic rendition of the material, for example a document using Bliss symbolics:
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.58 Synthesized
|
Name: |
synthesized |
|---|---|
|
Definition: |
An audio adaptation featuring text-to-speech technology. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.59 Tactile
|
Name: |
tactile |
|---|---|
|
Definition: |
Information is conveyed that requires the sense of touch. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
N/A |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.60 TextOnImage
|
Name: |
textOnImage |
|---|---|
|
Definition: |
Information is conveyed using text where the text is embedded in an image. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
N/A |
|
Content Value Rules: |
String |
|
Related to: |
Refines visual |
3.61 Textual
|
Name: |
textual |
|---|---|
|
Definition: |
Information is conveyed that requires the processing of text. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
N/A |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.62 Transcript
|
Name: |
transcript |
|---|---|
|
Definition: |
A written, typewritten, or printed copy; something transcribed or made by transcribing:
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.63 UIAutomation
|
Name: |
UIAutomation |
|---|---|
|
Definition: |
Indicates the application provides support for the Microsoft User Interface Automation API, used for Windows applications from Windows Vista forward:
|
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.64 Verbatim
|
Name: |
verbatim |
|---|---|
|
Definition: |
An exact transcription of audio; verbatim captions capture all speech word for word. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
3.65 Visual
|
Name: |
visual |
|---|---|
|
Definition: |
Information is conveyed that requires the sense of vision. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
N/A |
|
Content Value Rules: |
String |
|
Related to: |
Refined by colour, itemSize, orientation, position, and textOnImage |
3.66 WordSpacing
|
Name: |
wordSpacing |
|---|---|
|
Definition: |
Indicates the ability to increases or decreases the space between words in a text. |
|
Linguistic Indicator: |
Linguistic |
|
Value (Range): |
String |
|
Content Value Rules: |
String |
|
Related to: |
N/A |
About This Document
Title: IMS Global Access For All Data Element Specification
Editor: Colin Smythe (IMS Global)
Co-chairs: Madeleine Rothberg (WGBH) and Richard Schwerdtfeger (IBM)
Version: 3.0
Version Date : 31 September 2012
Release : 1.0
Status: Public Draft
Summary: This document contains the IMS Global Access For All Data Element Specification v3.0. The set of data vocabularies described in this document are used as the basis for the AfA DRD and AfA PNP information models.
Revision Information: This version supersedes the IMS Global Access For All v2.0 specification. This document contains the of definitions for data classes, Access For All Vocabulary data types, their definitions, and the application of the specific values to those data types.
Purpose: This document is made available for adoption by the public community at large.
Document Location: http://www.imsglobal.org/accessibility/
List of Contributors
The following individuals contributed to the development of this document: