![]() |
IMS GLC Person Management Service WSDL/XSD Binding Version 2.0 Final Release Specification Final 1.0 |
Date Issued: 30 June 2011
Latest version: http://www.imsglobal.org/lis/
IPR and Distribution Notices
Recipients of this document are requested to submit, with their comments, notification of any relevant patent claims or other intellectual property rights of which they may be aware that might be infringed by any implementation of the specification set forth in this document, and to provide supporting documentation.
IMS takes no position regarding the validity or scope of any intellectual property or other rights that might be claimed to pertain to the implementation or use of the technology described in this document or the extent to which any license under such rights might or might not be available; neither does it represent that it has made any effort to identify any such rights. Information on IMS's procedures with respect to rights in IMS specifications can be found at the IMS Intellectual Property Rights web page: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf.
Copyright © 2011 IMS Global Learning Consortium. All Rights Reserved.
If you wish to copy or distribute this document, you must complete a valid Registered User license registration with IMS and receive an email from IMS granting the license to distribute the specification. To register, follow the instructions on the IMS website: http://www.imsglobal.org/specificationdownload.cfm
This document may be copied and furnished to others by Registered Users who have registered on the IMS website provided that the above copyright notice and this paragraph are included on all such copies. However, this document itself may not be modified in any way, such as by removing the copyright notice or references to IMS, except as needed for the purpose of developing IMS specifications, under the auspices of a chartered IMS project group.
Use of this specification to develop products or services is governed by the license with IMS found on the IMS website: http://www.imsglobal.org/license.html
The limited permissions granted above are perpetual and will not be revoked by IMS or its successors or assigns.
THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTER'S OWN RISK, AND NEITHER THE CONSORTIUM, NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION.
This document is a part of the IMS GLC Person Management Service (PMS) v2.0 specification. The binding details how the Person Management Service Information Model is realised as a Web Service; in the form of a Web Services Description Language (WSDL) file. The PMS binding is contained in a set of WSDL, XSD and vocabulary files. The vocabulary files are instances of the IMS Vocabulary Definition Exchange specification [VDEX, 04a], [VDEX, 04b]. The IMS GLC Learning Information Services (LIS) Best Practice and Implementation Guide [LIS, 11b] provides non-normative guidance on how to use the Binding and Information Model. For a conceptual overview of the LIS Specification, please see the overall services description [LIS, 11a]. For a discussion of potential applications, see the Best Practice Guide.
The IMS GLC PMS WSDL Binding v2.0 is used in conjunction with the following documents:
As such the Person Management Services specification supersedes the original Enterprise Services specifications:
This WSDL binding takes the Membership Management Service Information Model and produces an encoding of that description in WSDL. This WSDL binding is generated as recommended by the IMS GLC General Web Services documents [GWS, 06a], [GWS, 06b]. The WSDL is created using the IMC GLC Binding Auto-generation Tool-kit (I-BAT) [I-BAT, 06].
The structure of this document is:
| 2. Platform Specific Model of the Binding | The description platform specific models in the form of the IMS GLC UML-Profile service/data models representation of the IMS GLC PMS specification information model. This representation is used by the IMS GLC I-BAT tool to auto-generate the corresponding WSDL/XSDs; |
| 3. Application of the Binding Guidelines | Explanation of how the platform specific model is realised as the WSDL/XSD binding. This addresses how the information model is realised as a Web Service; |
| 4. WSDL File Documentation | The description of the Web Services used to realise the service model components of the binding. This part of the binding document was created using the schema documentation tool provided as part of the Oxygen 12.2 product; |
| 5. XSD File Documentation | The description of the elements used within the data model components of the binding. This part of the binding document was created using the schema documentation tool provided as part of the Oxygen 12.2 product; |
| 6. Binding of the Vocabularies | Contains the description of how the set of external vocabulary files realised as VDEX files; |
| Appendix A - Listing of the WSDL Files | This is the full listing of the PMS WSDL files; |
| Appendix B - Listing of the XSD Files | This is the full listing of the PMS XSD files; |
| Appendix C - Vocabulary VDEX Instance File Listings | This is the full listing of the set of external vocabulary VDEX instance files; |
| Appendix D - Examples SOAP Messages | Examples of the SOAP messages that are exchanged to realise the service. |
| HTTP | HyperText Transfer Protocol |
| I-BAT | IMS GLC Binding Auto-generation Tool-kit |
| IMS GLC | IMS Global Learning Consortium |
| LIS | Learning Information Services |
| MDA | Model Driven Architecture |
| PIM | Protocol Independent Model |
| PMS | Person Management Service |
| PSM | Platform Specific Model |
| UML | Unified Modelling Language |
| VDEX | Vocabulary Definition Exchange |
| W3C | World Wide Web Consortium |
| WSDL | Wed Services Description Language |
| XMI | XML Meta-data Interchange |
| XML | Extensible Mark-up Language |
| XSD | XML Schema Definition |
| XSL | Extensible Stylesheet Language |
| XSLT | XSL Transformations |
| [GWS, 06a] |
IMS GLC General Web Services Base Profile Specification Final Release v1.0, C.Schroeder, J.Simon and C.Smythe, IMS Global Learning Consortium, January 2006. |
| [GWS, 06b] |
IMS GLC General Web Services WSDL Binding Guidelines Final Release v1.0, C.Schroeder, J.Simon and C.Smythe, IMS Global Learning Consortium, January 2006. |
| [I-BAT, 06] | IMS Binding Auto-generation Toolkit Manual v1.0, C.Smythe, IMS Global Learning Consortium, July 2006. |
| [LIS, 11a] |
IMS GLC Learning Information Services v2.0 Specification Final Release v1.0, L.Feng, B.Lee and C.Smythe, IMS Global Learning Consortium, June 2011. |
| [LIS, 11b] |
IMS GLC Learning Information Services v2.0 Best Practice and Implementation Guide Final Release v1.0, L.Feng, B.Lee and C.Smythe, IMS Global Learning Consortium, June 2011. |
| [PMS, 04a] |
IMS GLC Person Management Services Information Model Specification Final Release v1.0, C.Vento and C.Smythe, IMS Global Learning Consortium, June 2004. |
| [PMS, 04b] |
IMS GLC Person Management Services WSDL Binding Specification Final Release v1.0, C.Vento and C.Smythe, IMS Global Learning Consortium, June 2004. |
| [PMS, 11] |
IMS GLC Person Management Services v2.0 Information Model Specification Final Release v1.0, L.Feng, B.Lee and C.Smythe, IMS Global Learning Consortium, June 2011. |
| [SDN11, 06] |
IMS GLC Specification Note 11: Vocabulary Definition, Registration & Maintenance Procedures, C.Smythe, IMS Global Learning Consortium, October 2006. |
| [VDEX, 04a] |
IMS Vocabulary Definition Exchange Information Model Specification Final Release v1.0, A.Cooper, IMS Global Learning Consortium, February 2004. |
| [VDEX, 04b] |
IMS Vocabulary Definition Exchange XML Binding Specification Final Release v1.0, A.Cooper, IMS Global Learning Consortium, February 2004. |
Figure 2.1 is the PSM of the service group model description for the PMS. This information is used to establish the mapping to the binding flavors of WSDL.

Figure 2.1 The PSM representation of the service group model description for the GMS.
Figure 2.2 is the PSM of the service model description for the GMS. The PSM is derived from the Platform Independent Model that was documented within the information model for the PMS specification [PMS, 10].

Figure 2.2 The PSM representation of the service model description for the PMS.
The data model for the service operations is shown in Figure 2.3 and 2.4. Figure 2.3 shows the data models for the set of parameters. Figure 2.4 is the data model for the Status Information and other WSDL-specific binding data structures.

Figure 2.3 The PSM representation of the parameters data model description for the PMS.

Figure 2.4 The PSM representation of the status information data model description for the PMS.
The PSM for the Person data models are shown in Figures 2.5, 2.6, 2.7, 2.8, 2.9, 2.10, 2.11, 2.12 and 2.13. Figure 2.5 is the Person data model, Figure 2.6 the FormName data model, Figure 2.7 is the NAme data model, Figure 2.8 is the Address data model, Figure 2.9 is the ContactInfo data model, Figure 2.10 is the Demographics data model, Figure 2.11 is the Enterprise Roles data model, Figure 2.12 is the Agent data model and Figure 2.13 contains the set of common data model classes.

Figure 2.5 The PSM representation of the Person data model description for the PMS.

Figure 2.6 The PSM representation of the Address, Agent, ContactInfo and Names data model description for the PMS.

Figure 2.7 The PSM representation of the Demographics data model description for the PMS.

Figure 2.8 The PSM representation of the Enterprise Roles data model description for the PMS.

Figure 2.9 The PSM representation of the common data models description for the PMS.
The PSM for the file-based Person data models are shown in Figures 2.10, 2.11, 2.12, 2.13 and 2.14.

Figure 2.10 The PSM representation of the PersonRecord data model description for file storage in the PMS.

Figure 2.11 The PSM representation of the Address, Agent, ContactInfo, Names data model description for file storage in the PMS

Figure 2.12 The PSM representation of the Demographics data model description for file storage in the PMS

Figure 2.13 The PSM representation of the Enterprise Roles data model description for file storage in the PMS

Figure 2.14 The PSM representation of the common data model descriptions for file storage in the PMS.
The WSDL/XSD bindings have been generated using the methodology documented in [GWS 06a] and [GWS, 06b]. Only the synchronous service binding has been created. The binding files are available in two forms:
It is recommended that only the combined form is used (many WSDL-based code generation tools do not process the 'import' instructions).
The mapping between the PIM and PSM descriptions is detailed in Table 3.1.
Table 3.1 Mapping between the PIM, PSM and XSD descriptions for the data models.
| PSM Reference | PIM Reference | XSD Reference | ||||
|---|---|---|---|---|---|---|
| Name | UML Type | Figure | Type | Table | Name | Type |
|
PersonRecordSet |
Class | 2.5 |
–
|
– | PersonRecordSet.Type | ComplexType |
|
Attribute | 2.5 | PersonRecord | 5.3 | personRecord | Element |
|
PersonRecord |
Class | 2.5 | – | 5.4 | GroupRecord.Type | ComplexType |
|
Attribute | 2.5 | GUID | 5.5 | sourcedGUID | Element |
|
Attribute | 2.5 | Person | – | person | Element |
|
SourcedGUID |
Class | 2.5 | TBD. | 5.6 | SourcedGUID.Type | ComplexType |
|
Attribute | 2.5 | NormalizedString | 5.7 | refAgentInstanceId | Element |
|
Attribute | 2.5 | SourcedId | 5.8 | sourcedId | Element |
|
Person |
Class | 2.5 | – | 5.9 | Person.Type | ComplexType |
|
Attribute | 2.5 | FormName | 5.10 | formname | Element |
|
Attribute | 2.5 | Name | 5.11 | name | Element |
|
Attribute | 2.5 | Address | 5.12 | address | Element |
|
Attribute | 2.5 | ContactInfo | 5.13 | contactinfo | Element |
|
Attribute | 2.5 | Demographics | 5.14 | demographics | Element |
|
Attribute | 2.5 | Agent | 5.15 | agent | Element |
|
Attribute | 2.5 | EnterpriseRoles | 5.16 | roles | Element |
|
Attribute | 2.5 | GUID | 5.17 | dataSource | Element |
|
Attribute | 2.5 | IMSExtension | 5.18 | extension | Element |
|
FormName |
Class | 2.6 | – | 5.19 | FormName.Type | ComplexType |
|
Attribute | 2.6 | BaseValueToken | 5.20 | formnameType | Element |
|
Attribute | 2.6 | Text | 5.21 | formattedName | Element |
|
Name |
Class | 2.6 | – | 5.22 | Name.Type | ComplexType |
|
Attribute | 2.6 | BaseValueToken | 5.23 | nameType | Element |
|
Attribute | 2.6 | BaseValueSingle | 5.24 | partName | Element |
|
Address |
Class | 2.6 | – | 5.25 | Address.Type | ComplexType |
|
Attribute | 2.6 | BaseValueToken | 5.26 | addressType | Element |
|
Attribute | 2.6 | BaseValueMultiple | 5.27 | addressPart | Element |
|
ContactInfo |
Class | 2.6 | – | 5.28 | ContactInfo.Type | ComplexType |
|
Attribute | 2.6 | BaseValueToken | 5.29 | contactinfoType | Element |
|
Attribute | 2.6 | Text | 5.30 | contactinfoValue | Element |
|
Demographics |
Class | 2.7 | – | 5.31 | Demographics.Type | ComplexType |
|
Attribute | 2.7 | BaseValueToken | 5.32 | demographicsType | Element |
|
Attribute | 2.7 | Representation | 5.33 | representation | Element |
|
Attribute | 2.7 |
BaseValueToken
|
5.34 | eventDate | Element |
|
Attribute | 2.7 |
Enumerated
|
5.35 | gender | Element |
|
Attribute | 2.7 |
BaseValueSingle
|
5.36 | demographicsinfo | Element |
|
Representation |
Class | 2.7 | – | 5.37 | Representation.Type | ComplexType |
|
Attribute | 2.7 |
BaseValueToken
|
5.38 | representationType | Element |
|
Attribute | 2.7 |
Date
|
5.39 | date | Element |
|
Attribute | 2.7 |
Description
|
5.40 | description | Element |
|
Agent |
Class | 2.6 | – | 5.41 | Agent.Type | ComplexType |
|
Attribute | 2.6 |
BaseValueToken
|
5.42 | agentType | Element |
|
Attribute | 2.6 |
Text
|
5.43 | agentId | Element |
|
Attribute | 2.6 |
Text
|
5.44 | agentDomain | Element |
|
Attribute | 2.6 |
Description
|
5.45 | description | Element |
|
EnterpriseRoles |
Class | 2.8 | – | 5.46 | EnterpriseRoles.Type | ComplexType |
|
Attribute | 2.8 |
BaseValueToken
|
5.47 | enterpriserolesType | Element |
|
Attribute | 2.8 |
BaseValueSingle
|
5.48 | systemRole | Element |
|
Attribute | 2.8 |
InstitutionRole
|
5.49 | institutionRole | Element |
|
Attribute | 2.8 |
BaseValueSingle
|
5.50 | enrollment | Element |
|
Attribute | 2.8 |
UserId
|
5.51 | userId | Element |
|
UserId |
Class | 2.8 | – | 5.52 | UserId.Type | ComplexType |
|
Attribute | 2.8 |
Text
|
5.53 | userIdValue | Element |
|
Attribute | 2.8 |
Text
|
5.54 | userIdType | Element |
|
Attribute | 2.8 |
Text
|
5.55 | password | Element |
|
Attribute | 2.8 |
Text
|
5.56 | pwEncryption | Element |
|
Attribute | 2.8 |
Text
|
5.57 | authenticationType | Element |
|
InstitutionRole |
Class | 2.8 | – | 5.58 | InstitiutionRole.Type | ComplexType |
|
Attribute | 2.8 |
BaseValueToken
|
5.59 | institutionroletype | Element |
|
Attribute | 2.8 |
Boolean
|
5.60 | primaryroletype | Element |
|
BaseValueToken |
Class | 2.9 | – | 5.61 | BaseValueToken.Type | ComplexType |
|
Attribute | 2.9 | Text | 5.62 | instanceIdentifier | Element |
|
Attribute | 2.9 | AnyURI | 5.63 | instanceVocabulary | Element |
|
Attribute | 2.9 | Text | 5.64 | instanceValue | Element |
|
BaseValueSingle |
Class | 2.9 | – | 5.65 | BaseValueSingle.Type | ComplexType |
|
Attribute | 2.9 | Text | 5.66 | instanceIdentifier | Element |
|
Attribute | 2.9 | AnyURI | 5.67 | instanceVocabulary | Element |
|
Attribute | 2.9 | Text | 5.68 | instanceName | Element |
|
Attribute | 2.9 | Text | 5.69 | instanceValue | Element |
|
Description |
Class | 2.9 | – | 5.70 | Description.Type | ComplexType |
|
Attribute | 2.9 | Text | 5.71 | shortDescription | Element |
|
Attribute | 2.9 | Text | 5.72 | longDescription | Element |
|
Attribute | 2.9 | FullDescription | 5.73 | fullDescription | Element |
|
FullDescription |
Class | 2.9 | – | 5.74 | FullDescription.Type | ComplexType |
|
Attribute | 2.9 | Enumerated | 5.75 | mediamode | Element |
|
Attribute | 2.9 | Enumerated | 5.76 | contentRefType | Element |
|
Attribute | 2.9 | NormalizedString | 5.77 | mimeType | Element |
|
Attribute | 2.9 | Text | 5.78 | descriptionText | Element |
|
Text |
Class | 2.9 | – | 5.79 | Text.Type | ComplexType |
|
Attribute | 2.9 | NormalizedString | 5.80 | language | Element |
|
Attribute | 2.9 | String | 5.81 | textString | Element |
|
IMSExtension |
Class | 2.9 | – | 5.82 | IMSExtension.Type | ComplexType |
|
Attribute | 2.9 | AnyURI | 5.83 | extensionNameVocabulary | Element |
|
Attribute | 2.9 | AnyURI | 5.84 | extensionTypeVocabulary | Element |
|
Attribute | 2.9 | ExtensionField | 5.85 | extensionField | Element |
|
ExtensionField |
Class | 2.9 | – | 5.86 | ExtensionField.Type | ComplexType |
|
Attribute | 2.9 | NormalizedString | 5.87 | fieldName | Element |
|
Attribute | 2.9 | NormalizedString | 5.88 | fieldType | Element |
|
Attribute | 2.9 | NormalizedString | 5.89 | fieldValue | Element |
|
imsx_StatusInfo |
Class | 2.4 | – | See IMS GWSv1.0 | imsx_StatusInfo.Type | ComplexType |
|
Attribute | 2.4 | n/a | See IMS GWSv1.0 | imsx_codeMajor | Element |
|
Attribute | 2.4 | n/a | See IMS GWSv1.0 | imsx_severity | Element |
|
Attribute | 2.4 | n/a | See IMS GWSv1.0 | imsx_messageRefIdentifier | Element |
|
Attribute | 2.4 | n/a | See IMS GWSv1.0 | imsx_operationRefIdentifier | Element |
|
Attribute | 2.4 | n/a | See IMS GWSv1.0 | imsx_description | Element |
|
Attribute | 2.4 | n/a | See IMS GWSv1.0 | imsx_codeMinor | Element |
|
imsx_CodeMinor |
Class | 2.4 | – | See IMS GWSv1.0 | imsx_CodeMinor.Type | ComplexType |
|
Attribute | 2.4 | n/a | See IMS GWSv1.0 | imsx_codeMinorField | Element |
|
imsx_CodeMinorField |
Class | 2.4 | – | See IMS GWSv1.0 | imsx_CodeMinorField.Type | ComplexType |
|
Attribute | 2.4 | n/a | See IMS GWSv1.0 | imsx_codeMinorFieldName | Element |
|
Attribute | 2.4 | n/a | See IMS GWSv1.0 | imsx_codeMinorFieldValue | Element |
|
imsx_StatusBinding |
Class | 2.4 | – | See IMS GWSv1.0 | imsx_StatusBinding.Type | ComplexType |
|
Attribute | 2.4 | n/a | See IMS GWSv1.0 | imsx_syncRequestHeaderInfo | Element |
|
Attribute | 2.4 | n/a | See IMS GWSv1.0 | imsx_syncResponseHeaderInfo | Element |
|
imsx_RequestHeaderInfo |
Class | 2.4 | – | See IMS GWSv1.0 | imsx_RequestHeaderInfo.Type | ComplexType |
|
Attribute | 2.4 | n/a | See IMS GWSv1.0 | imsx_version | Element |
|
Attribute | 2.4 | n/a | See IMS GWSv1.0 | imsx_messageIdentifier | Element |
|
imsx_ResponseHeaderInfo |
Class | 2.4 | – | See IMS GWSv1.0 | imsx_ResponseHeaderInfo.Type | ComplexType |
|
Attribute | 2.4 | n/a | See IMS GWSv1.0 | imsx_version | Element |
|
Attribute | 2.4 | n/a | See IMS GWSv1.0 | imsx_messageIdentifier | Element |
|
Attribute | 2.4 | n/a | See IMS GWSv1.0 | imsx_statusInfo | Element |
Key:
WSDL file: "PersonManagementServiceSyncSingle.wsdl"
Target namespace: http://www.imsglobal.org/services/lis/pms2p0/wsdl11/sync/imspms_v2p0
| WSDL Definition | |
|---|---|
| Name | Documentation |
| PersonManagementServiceSyncServices |
WSDLv1.1 File InformationServices: PersonManagementService (Synchronous Communications) Author: Colin Smythe Date: 30 June 2011 Version: Final 1.0 Status: Final Release Description: The Person Management Service. This forms a part of the IMS GLC Learning Informaton Services v2.0 Specification. History: Release 1.0: This is the first formal release of version 2.0 of this service. This version supercedes v1.0. This is an integration of the Person Service from the Learning Information Services and the 'identification' data model from the IMS GLC Learner Information Package v1.0 specification. WSDL Binding: WSDL Binding is based upon the IMS GLC General Web Services Base Profile v1.0 The IMS GLC GWS Basic Profile is derived from the WS-I Basic Profile v1.1. This profile uses: WSDL 1.1, SOAP 1.1, HTTP 1.1 and XML 1.0. Extension profiles to the IMS GLC GWS Base Profile are available but are not supported using this tool version. License: IPR, License and Distribution Notices This machine readable file is derived from IMS Global Learning Consortium (GLC) specification IMS GLC Person Management ServiceVersion 2.0 found at http://www.imsglobal.org/lis/pmsv2p0/imspmsv2p0_InfoFinalv1.pdf and the original IMS GLC schema binding or code base http://www.imsglobal.org/lis/pmsv2p0/imspmsv2p0_BindFinalv1p0.html. Recipients of this document are requested to submit, with their comments, notification of any relevant patent claims or other intellectual property rights of which they may be aware that might be infringed by the schema binding contained in this document. IMS GLC takes no position regarding the validity or scope of any intellectual property or other rights that might be claimed to pertain to the implementation or use of the technology described in this document or the extent to which any license under such rights might or might not be available; neither does it represent that it has made any effort to identify any such rights. Information on IMS GLCs procedures with respect to rights in IMS GLC specifications can be found at the IMS GLC Intellectual Property Rights web page: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf. Copyright © IMS Global Learning Consortium 1999-2011. All Rights Reserved. License Notice for UsersUsers of products or services that include this document are hereby granted a worldwide, royalty-free, non-exclusive license to use this document. Distribution Notice for DevelopersDevelopers of products or services that are not original incorporators of this document and have not changed this document, that is, are distributing a software product that incorporates this document as is from a third-party source other than IMS, are hereby granted permission to copy, display and distribute the contents of this document in any medium for any purpose without fee or royalty provided that you include this IPR, License and Distribution notice in its entirety on ALL copies, or portions thereof. Developers of products or services that are original incorporators of this document and wish to provide distribution of this document as is or with modifications and developers of products and services that are not original incorporators of this document and have changed this document, are required to register with the IMS GLC community on the IMS GLC website as described in the following two paragraphs:-
The limited permissions granted above are perpetual and will not be revoked by IMS GLC or its successors or assigns. THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTERS OWN RISK, AND NEITHER THE CONSORTIUM NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION. UML Source File InformationChoreography: Sync Transport: SOAPv1.1 Source UML File InformationThe source file information must be supplied as an XMI file (without diagram layout information). The supported UML authoring tools are: (a) Poseidon – v6 (and later) Source XSLT File InformationXSL Generator: UMLtoWSDLv1.1Transformv0p9p5.xsl XSLT Processor: Xalan Release: 1.0 Beta 4 Date: 31st March, 2011 IMS GLC Auto-generation Binding Tool-kit (I-BAT)This file was auto-generated using the IMS GLC Binding Auto-generation Tool-kit (I-BAT). While every attempt has been made to ensure that this tool auto-generates the files correctly, users should be aware that this is an experimental tool. Permission is given to make use of this tool. IMS GLC makes no claim on the materials created by third party users of this tool. Details on how to use this tool are contained in the IMS GLC "I-BAT" Documentation available at the IMS GLC web-site. Tool Copyright: 2005-2011 (c) IMS Global Learning Consortium Inc. All Rights Reserved. |
| Services | ||
|---|---|---|
| Name | Documentation | |
| PersonManagementServiceSyncService |
|
|
| Service : PersonManagementServiceSyncService | ||||
|---|---|---|---|---|
| Port Name | Binding | Address Extensibility | Documentation | |
| PersonManagerSyncSoapPort | PersonManagerSyncSoapBinding | <soap11:address location="http://www.imsglobal.org/lis/pms2p0/PersonManagerSyncSoap/"/> |
|
|
| Binding : PersonManagerSyncSoapBinding | |
|---|---|
| Port Type | PersonManagerSyncPortType |
| Extensibility | <soap11:binding transport="http://schemas.xmlsoap.org/soap/http" style="document"/> |
| Operations | createPerson, createByProxyPerson, deletePerson, readPerson, readPersonCore, readAllPersonIds, readPersonIdsFromSavePoint, readPersons, readPersonsFromSavePoint, updatePerson, replacePerson, discoverPersonIds, changePersonIdentifier, |
| Port Type : PersonManagerSyncPortType | ||||
|---|---|---|---|---|
| Operation Name | Input message | Output message | Documentation | |
| createPerson | createPersonRequest | createPersonResponse |
|
|
| createByProxyPerson | createByProxyPersonRequest | createByProxyPersonResponse |
|
|
| deletePerson | deletePersonRequest | deletePersonResponse | When the source issues the 'deletePerson' request the target is instructed to delete the identified Person object and to remove the reference to the Person from any of the related Membership objects. This is a hard cascaded delete from which there is no recovery. If the object identified by the supplied 'sourcedId' cannot be located then the request is rejected and the appropriate failure code is returned. | |
| readPerson | readPersonRequest | readPersonResponse | When the source issues the 'readPerson' request the target is charged with retrieving the identified record from its database and returning this data to the source. The target is responsible for ensuring that the record contains valid data. If the object identified by the supplied 'sourcedId' cannot be located then the request is rejected and the appropriate failure code is returned. | |
| readPersonCore | readPersonCoreRequest | readPersonCoreResponse | When the source issues the 'readCorePerson' request the target is charged with retrieving the mandatory core data structures for the identified record from its database and returning this data to the source. The target is responsible for ensuring that the record contains valid data. If the object identified by the supplied 'sourcedId' cannot be located then the request is rejected and the appropriate failure code is returned. IIf any mandatory field is missing then the status returned is 'incompletedata'. | |
| readAllPersonIds | readAllPersonIdsRequest | readAllPersonIdsResponse | When the source issues the 'readAllPersonIds' the target returns the set of sourcedIds that have been allocated to Person objects. | |
| readPersonIdsFromSavePoint | readPersonIdsFromSavePointRequest | readPersonIdsFromSavePointResponse | When the source issues the 'readGroupIdsFromSavePoint' the target returns the set of SourcedIds that have been altered from the defined reference point, supplied by the source, to the latest reference point identified in the target. If the reference counter in the source is greater than that in the target then an error code is returned along with the target value for the reference point. | |
| readPersons | readPersonsRequest | readPersonsResponse | When the source issues the 'readPersons' request the target is charged with retrieving the identified set of objects from its database. The associated read savePoint reference is updated and returned. If the object identified by the supplied SourcedId cannot be located then the request is rejected and a partial success code is returned for the operation. The target is responsible for ensuring that the records contain valid data. The target should attempt to successfully complete as much of the request as possible. | |
| readPersonsFromSavePoint | readPersonsFromSavePointRequest | readPersonsFromSavePointResponse | When the source issues the readPersonsFromSavePoint' request the target is charged with reading the objects that have been altered from the defined reference point. If the reference counter in the source is greater than that in the target then an empty data file is returned and the target value for the reference point is returned. | |
| updatePerson | updatePersonRequest | updatePersonResponse | When the source issues the 'updatePerson' request the target is charged with writing the supplied information into the identified object. If any part of the write fails e.g. due to partial invalid data then the whole request is rejected and the record is left in its original state. This is an additive write operation of all the data fields supplied in the update request and fields not supplied remain unchanged. If a field is constrained with a multiplicity of one the 'updatePerson' request acts as a 'replacePerson' request for that field. If the object identified by the supplied 'SourcedId' cannot be located then the request is rejected and the appropriate failure code is returned. The reference pointer for the object is incremented in the target system. | |
| replacePerson | replacePersonRequest | replacePersonResponse | When the source issues the 'replacePerson' request the target is charged with writing the supplied information into the identified record. If any part of the write fails e.g. due to partial invalid data then the whole request is rejected and the record is left in its original state. This is a destructive write-over operation of the entire 'person' object. This is equivalent to a 'createPerson' but for an object that already exists. If the object identified by the supplied SourcedId cannot be located then the request is interpreted as a 'createPerson' invocation. The reference pointer for the object is incremented in the target system. | |
| discoverPersonIds | discoverPersonIdsRequest | discoverPersonIdsResponse | When the source issues the 'discoverPersonIds' the target applies the query/filter instructions to the set of Person objects and returns the set of sourcedIds that uphold the query. If no Person objects have the required properties the returned data set is empty and the success status code returned. If the target does not understand or cannot apply the requested query/filter then an error status is returned. | |
| changePersonIdentifier | changePersonIdentifierRequest | changePersonIdentifierResponse |
|
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Parameters | tns:createPersonRequest | N/A |
|
|
| HeaderInfoParameters | tns:imsx_syncRequestHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Response | tns:createPersonResponse | N/A |
|
|
| HeaderInfoResponse | tns:imsx_syncResponseHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Parameters | tns:createByProxyPersonRequest | N/A |
|
|
| HeaderInfoParameters | tns:imsx_syncRequestHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Response | tns:createByProxyPersonResponse | N/A |
|
|
| HeaderInfoResponse | tns:imsx_syncResponseHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Parameters | tns:deletePersonRequest | N/A |
|
|
| HeaderInfoParameters | tns:imsx_syncRequestHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Response | tns:deletePersonResponse | N/A |
|
|
| HeaderInfoResponse | tns:imsx_syncResponseHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Parameters | tns:readPersonRequest | N/A |
|
|
| HeaderInfoParameters | tns:imsx_syncRequestHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Response | tns:readPersonResponse | N/A |
|
|
| HeaderInfoResponse | tns:imsx_syncResponseHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Parameters | tns:readPersonCoreRequest | N/A |
|
|
| HeaderInfoParameters | tns:imsx_syncRequestHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Response | tns:readPersonCoreResponse | N/A |
|
|
| HeaderInfoResponse | tns:imsx_syncResponseHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Parameters | tns:readAllPersonIdsRequest | N/A |
|
|
| HeaderInfoParameters | tns:imsx_syncRequestHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Response | tns:readAllPersonIdsResponse | N/A |
|
|
| HeaderInfoResponse | tns:imsx_syncResponseHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Parameters | tns:readPersonIdsFromSavePointRequest | N/A |
|
|
| HeaderInfoParameters | tns:imsx_syncRequestHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Response | tns:readPersonIdsFromSavePointResponse | N/A |
|
|
| HeaderInfoResponse | tns:imsx_syncResponseHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Parameters | tns:readPersonsRequest | N/A |
|
|
| HeaderInfoParameters | tns:imsx_syncRequestHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Response | tns:readPersonsResponse | N/A |
|
|
| HeaderInfoResponse | tns:imsx_syncResponseHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Parameters | tns:readPersonsFromSavePointRequest | N/A |
|
|
| HeaderInfoParameters | tns:imsx_syncRequestHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Response | tns:readPersonsFromSavePointResponse | N/A |
|
|
| HeaderInfoResponse | tns:imsx_syncResponseHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Parameters | tns:updatePersonRequest | N/A |
|
|
| HeaderInfoParameters | tns:imsx_syncRequestHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Response | tns:updatePersonResponse | N/A |
|
|
| HeaderInfoResponse | tns:imsx_syncResponseHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Parameters | tns:replacePersonRequest | N/A |
|
|
| HeaderInfoParameters | tns:imsx_syncRequestHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Response | tns:replacePersonResponse | N/A |
|
|
| HeaderInfoResponse | tns:imsx_syncResponseHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Parameters | tns:discoverPersonIdsRequest | N/A |
|
|
| HeaderInfoParameters | tns:imsx_syncRequestHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Response | tns:discoverPersonIdsResponse | N/A |
|
|
| HeaderInfoResponse | tns:imsx_syncResponseHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Parameters | tns:changePersonIdentifierRequest | N/A |
|
|
| HeaderInfoParameters | tns:imsx_syncRequestHeaderInfo | N/A |
|
| Part Name | Element | Type | Documentation | |
|---|---|---|---|---|
| Response | tns:changePersonIdentifierResponse | N/A |
|
|
| HeaderInfoResponse | tns:imsx_syncResponseHeaderInfo | N/A |
|
The XSD file documentation has been produced by the Oxygen XML Editing tool.
Click on the Section header to access this documentation for the data models in the service description.
Click on the Section header to access this documentation for the data models used in the BDEMS-based file data exchange.
The vocabularies in the PMS are:
These vocabularies are the default set maintained under the IMS GLC Vocabulary Registry [SDN11, 06]. It is the responsibility of an implementation to ensure that it is using the correct and latest versions of the vocabulary files. Changes to the default vocabularies are permitted; this results in the creation of a new vocabulary that should be registered with IMS GLC. As part of a profiling process entirely new vocabularies may be defined to replace the default set.

Figure 6.1 The PSM representation of the formatted name type vocabulary for the PMS.

Figure 6.2 The PSM representation of the name type vocabulary for the PMS.

Figure 6.3a The PSM representation of the name part (1) vocabulary for the PMS.

Figure 6.3b The PSM representation of the name part (2) vocabulary for the PMS.

Figure 6.4a The PSM representation of the address type (1) vocabulary for the PMS.

Figure 6.4b The PSM representation of the address type (2) vocabulary for the PMS.

Figure 6.5a The PSM representation of the address part (1) vocabulary for the PMS.

Figure 6.5b The PSM representation of the address part (2) vocabulary for the PMS.

Figure 6.5c The PSM representation of the address part (3) vocabulary for the PMS.

Figure 6.6a The PSM representation of the type of contact information (1) vocabulary for the PMS.

Figure 6.6b The PSM representation of the type of contact information (2) vocabulary for the PMS.

Figure 6.6c The PSM representation of the type of contact information (3) vocabulary for the PMS.

Figure 6.6d The PSM representation of the type of contact information (4) vocabulary for the PMS.

Figure 6.7a The PSM representation of the type of demographics (1) vocabulary for the PMS.

Figure 6.7b The PSM representation of the type of demographics (2) vocabulary for the PMS.

Figure 6.7c The PSM representation of the type of demographics (3) vocabulary for the PMS.

Figure 6.8 The PSM representation of the demographics information vocabulary for the PMS.
