IMS Logo

IMS GLC Outcomes Management Service WSDL/XSD Binding

Version 1.0 Public Draft Specification

Draft 2.0


Date Issued: 30 June 2011

Latest version: http://www.imsglobal.org/lis/

IPR and Distribution Notices

Recipients of this document are requested to submit, with their comments, notification of any relevant patent claims or other intellectual property rights of which they may be aware that might be infringed by any implementation of the specification set forth in this document, and to provide supporting documentation.

IMS takes no position regarding the validity or scope of any intellectual property or other rights that might be claimed to pertain to the implementation or use of the technology described in this document or the extent to which any license under such rights might or might not be available; neither does it represent that it has made any effort to identify any such rights. Information on IMS's procedures with respect to rights in IMS specifications can be found at the IMS Intellectual Property Rights web page: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf.

Copyright © 2011 IMS Global Learning Consortium. All Rights Reserved.

If you wish to copy or distribute this document, you must complete a valid Registered User license registration with IMS and receive an email from IMS granting the license to distribute the specification. To register, follow the instructions on the IMS website: http://www.imsglobal.org/specificationdownload.cfm

This document may be copied and furnished to others by Registered Users who have registered on the IMS website provided that the above copyright notice and this paragraph are included on all such copies. However, this document itself may not be modified in any way, such as by removing the copyright notice or references to IMS, except as needed for the purpose of developing IMS specifications, under the auspices of a chartered IMS project group.

Use of this specification to develop products or services is governed by the license with IMS found on the IMS website: http://www.imsglobal.org/license.html

The limited permissions granted above are perpetual and will not be revoked by IMS or its successors or assigns.

THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTER'S OWN RISK, AND NEITHER THE CONSORTIUM, NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION.

top

Table of Contents

  1. Introduction
    1. Scope and Context
    2. Structure of this Document
    3. Nomenclature
    4. References

  2. Platform Specific Model of the Binding
    1. Service Description
    2. Data for the Service Operations
    3. Outcomes Data Model
    4. File Data Model

  3. Application of the Binding Guidelines
  4. WSDL File Documentation
    1. Overview
    2. Messages

  5. XSD File Documentation
    1. Service Data Model
    2. File Data Model

  6. Binding of the Vocabularies
  7. Appendix A - Listing of the WSDLs
  8. Appendix B - Listing of the XSDs
  9. Appendix C - Vocabulary VDEX Instance File Listings
  10. Appendix D - Example SOAP Messages
  11. About This Document
  12. Revision History

top

1. Introduction

This document is a part of the IMS GLC Outcomes Management Service (OMS) v1.0 specification. The binding details how the Outcomes Management Service Information Model is realised as a Web Service; in the form of a Web Services Description Language (WSDL) file. The OMS binding is contained in a set of WSDL, XSD and vocabulary files. The vocabulary files are instances of the IMS Vocabulary Definition Exchange specification [VDEX, 04a], [VDEX, 04b]. The IMS GLC Learning Information Services (LIS) Best Practice and Implementation Guide [LIS, 11b] provides non-normative guidance on how to use the Binding and Information Model. For a conceptual overview of the LIS Specification, please see the overall services description [LIS, 11a]. For a discussion of potential applications, see the Best Practice Guide.

1.1 Scope and Context

The IMS GLC OMS WSDL Binding v1.0 is used in conjunction with the following documents:

  1. IMS GLC Outcomes Management Service Information Model v1.0 [OMS, 011] – the behaviour and data model definition of the Outcomes Management Service;
  2. IMS GLC Learning Information Services Best Practice and Implementation Guide v1.0 [LIS, 11b] – key information on how to adopt and implement the specification.

This is the frst version of the Outcomes Management Services specification..

This WSDL binding takes the Outcomes Management Service Information Model and produces an encoding of that description in WSDL. This WSDL binding is generated as recommended by the IMS GLC General Web Services documents [GWS, 06a], [GWS, 06b]. The WSDL is created using the IMC GLC Binding Auto-generation Tool-kit (I-BAT) [I-BAT, 06].

1.2 Structure of this Document

The structure of this document is:

2. Platform Specific Model of the Binding
The description platform specific models in the form of the IMS GLC UML-Profile service/data models representation of the IMS GLC OMS specification information model. This representation is used by the IMS GLC I-BAT tool to auto-generate the corresponding WSDL/XSDs;
3. Application of the Binding Guidelines
Explanation of how the platform specific model is realised as the WSDL/XSD binding. This addresses how the information model is realised as a Web Service;
4. WSDL File Documentation
The description of the Web Services used to realise the service model components of the binding. This part of the binding document was created using the schema documentation tool provided as part of the Oxygen 12.1 product;
5. XSD File Documentation
The description of the elements used within the data model components of the binding. This part of the binding document was created using the schema documentation tool provided as part of the Oxygen 12.1 product;
6. Vocabulary Binding Using VDEX Instances
Contains the description of how the set of external vocabulary files realised as VDEX files;
Appendix A - Listing of the WSDL Files This is the full listing of the OMS WSDL files;
Appendix B - Listing of the XSD Files This is the full listing of the OMS XSD files;
Appendix C - Vocabulary VDEX Instance File Listings This is the full listing of the set of external vocabulary VDEX instance files.
Appendix D - Examples SOAP Messages Examples of the SOAP messages that are exchanged to realise the service.

1.3 Nomenclature

HTTP HyperText Transfer Protocol
I-BAT IMS GLC Binding Auto-generation Tool-kit
IMS GLC IMS Global Learning Consortium
LIS Learning Information Services
MDA Model Driven Architecture
OMS Outcomes Management Service
PIM Protocol Independent Model
PSM Platform Specific Model
UML Unified Modelling Language
VDEX Vocabulary Definition Exchange
W3C World Wide Web Consortium
WSDL Wed Services Description Language
XMI XML Meta-data Interchange
XML Extensible Mark-up Language
XSD XML Schema Definition
XSL Extensible Stylesheet Language
XSLT XSL Transformations

1.4 References

[GWS, 06a]
IMS GLC General Web Services Base Profile Specification Final Release v1.0, C.Schroeder, J.Simon and C.Smythe, IMS Global Learning Consortium, January 2006.
[GWS, 06b]
IMS GLC General Web Services WSDL Binding Guidelines Final Release v1.0, C.Schroeder, J.Simon and C.Smythe, IMS Global Learning Consortium, January 2006.
[I-BAT, 06] IMS Binding Auto-generation Toolkit Manual v1.0, C.Smythe, IMS Global Learning Consortium, July 2006.
[LIS, 11a]
IMS GLC Learning Information Services v2.0 Specification Final Release v1.0, L.Feng, B.Lee and C.Smythe, IMS Global Learning Consortium, May 2011.
[LIS, 11b]
IMS GLC Learning Information Services v2.0 Best Practice and Implementation Guide Final Release v1.0, L.Feng, B.Lee and C.Smythe, IMS Global Learning Consortium, May 2011.
[OMS, 11]
IMS GLC Outcomes Management Services v2.0 Information Model Specification Final Release v1.0, L.Feng, B.Lee and C.Smythe, IMS Global Learning Consortium, May 2011.
[SDN11, 06]
IMS GLC Specification Note 11: Vocabulary Definition, Registration & Maintenance Procedures, C.Smythe, IMS Global Learning Consortium, October 2006.
[VDEX, 04a]
IMS Vocabulary Definition Exchange Information Model Specification Final Release v1.0, A.Cooper, IMS Global Learning Consortium, February 2004.
[VDEX, 04b]
IMS Vocabulary Definition Exchange XML Binding Specification Final Release v1.0, A.Cooper, IMS Global Learning Consortium, February 2004.

top | toc

2. Platform Specific Model of the Binding

2.1 Service Description

Figure 2.1 is the PSM of the service group model description for the OMS. This information is used to establish the mapping to the binding flavors of WSDL.

Figure 2.1 The PSM representation of the service group model description for the OMS.

Figure 2.2 is the PSM of the service model description for the OMS. The PSM is derived from the Platform Independent Model that was documented within the information model for the OMS specification [OMS, 10].

Figure 2.2 The PSM representation of the service model description for the OMS.

2.2 Data for the Service Operations

The data model for the service operations is shown in Figure 2.3 and 2.4. Figure 2.3 shows the data models for the set of parameters. Figure 2.4 is the data model for the Status Information and other WSDL-specific binding data structures.

Figure 2.3 The PSM representation of the parameters data model description for the OMS.

Figure 2.4 The PSM representation of the status information data model description for the OMS.

2.3 Outcomes Data Models

The PSM for the Outcomes data models are shown in Figures 2.5, 2.6, 2.7 and 2.8. Figure 2.5 is the LineItem data model, Figure 2.6 is the Result data model, Figure 2.7 is the ResultValue data model and Figure 2.8 contains the set of common data model classes.

Figure 2.5 The PSM representation of the LineItem data model description for the OMS.

Figure 2.6 The PSM representation of the Result data model description for the OMS.

Figure 2.7 The PSM representation of the ResultValue data model description for the OMS.

Figure 2.8 The PSM representation of the common data models description for the OMS.

2.4 File-based Data Exchange Data Model

The PSM for the file-based Outcomes data models are shown in Figures 2.9, 2.10, 2.11 and 2.12. Figure 2.9 is the LIneItemRecord data model, Figure 2.10 is the ResultRecord data model, Figure 2.11 is the ResultValueRecord data model and Figure 2.12 contains the set of common data model classes.

Figure 2.9 The PSM representation of the LineItemRecord data model description for file storage in the OMS.

Figure 2.10 The PSM representation of the ResultRecord data model description for file storage in the OMS.

Figure 2.11 The PSM representation of the ResultValueRecord data model description for file storage in the OMS.

Figure 2.12 The PSM representation of the common data model description for file storage in the OMS.

top | toc

3. Application of the Binding Guidelines

The WSDL/XSD bindings have been generated using the methodology documented in [GWS 06a] and [GWS, 06b]. Only the synchronous service binding has been created. The binding files are available in three forms:

It is recommended that only the combined form is used (many WSDL-based code generation tools do not process the 'import' instructions).

The mapping between the PIM and PSM descriptions is detailed in Table 3.1.

Table 3.1 Mapping between the PIM, PSM and XSD descriptions for the data models.

PSM Reference PIM Reference XSD Reference
Name UML Type Figure Type Table Name Type

LineItemRecordSet

Class 2.5 _ LineItemRecordSet.Type ComplexType
  • lineItemRecord
Attribute 2.5 LineItemRecord 5.3 lineItemRecord Element

LineItemRecord

Class 2.5 5.6 LineItemRecord.Type ComplexType
  • sourcedGUID
Attribute 2.5 SourcedGUID 5.7 sourcedGUID Element
  • lineItem
Attribute 2.5 LineItem 5.8 lineItem Element

LineItem

Class 2.5 5.23 LineItem.Type ComplexType
  • context
Attribute 2.5 Context 5.24 context Element
  • lineItemType
Attribute 2.5 LineItemType 5.25 lineItemType Element
  • label
Attribute 2.5 NormalizedString 5.26 label Element
  • resultValueSourcedId
Attribute 2.5 GUID 5.27 resultValueSourcedId Element
  • resultValue
Attribute 2.5 ResultValue 5.28 resultValue Element
  • lineItemMessageSettings
Attribute 2.5 PropertySet 5.29 lineItemMessageSettings Element
  • outcomesHandlerSourcedId
Attribute 2.5 URI 5.30 outcomesHandlerSourcedId Element
  • dataSource
Attribute 2.5 GUID 5.31 dataSource Element
  • recordInfo
Attribute 2.5 Metadata 5.32 recordInfo Element
  • extension
Attribute 2.5 IMSExtension 5.33 extension Element

Context

Class 2.5 5.34 Context.Type ComplexType
  • contextIdentifier
Attribute 2.5 GUID 5.35 contextIdentifier Element
  • contextType
Attribute 2.5 URI 5.36 contextType Element

LineItemType

Class 2.5 5.37 LineItemType.Type ComplexType
  • lineItemTypeVocabulary
Attribute 2.5 URI 5.38 lineItemTypeVocabulary Element
  • lineItemTypeValue
Attribute 2.5 Text 5.39 lineItemTypeValue Element
  • resourceHandlerSourcedId
Attribute 2.5 URI 5.40 resourceHandlerSourcedId Element
  • localKey
Attribute 2.5 NormalizedString 5.41 localKey Element
  • defaultDisplayName
Attribute 2.5 NormalizedString 5.42 defaultDisplayName Element

ResultRecordSet

Class 2.6 _ ResultRecordSet.Type ComplexType
  • resultRecord
Attribute 2.6 resultRecord 5.4 resultRecord Element

ResultRecord

Class 2.6 5.9 ResultRecord.Type ComplexType
  • sourcedGUID
Attribute 2.5 SourcedGUID 5.10 sourcedGUID Element
  • result
Attribute 2.6 Result 5.11 result Element

Result

Class 2.6 5.43 Result.Type ComplexType
  • statusofResult
Attribute 2.6 ResultStatus 5.44 statusofResult Element
  • lineItemSourcedId
Attribute 2.6 GUID 5.45 lineItemSourcedId Element
  • personSourcedId
Attribute 2.6 GUID 5.46 personSourcedId Element
  • date
Attribute 2.6 DateTime 5.47 dateTime Element
  • resultValueSourcedId
Attribute 2.6 GUID 5.48 resultValueSourcedId Element
  • resultValue
Attribute 2.6 ResultValue 5.49 resultValue Element
  • resultScore
Attribute 2.6 Text 5.50 resultScore Element
  • resultMessageSettings
Attribute 2.5 PropertySet 5.51 resultMessageSettings Element
  • dataSource
Attribute 2.6 GUID 5.52 dataSource Element
  • recordInfo
Attribute 2.6 Metadata 5.53 recordInfo Element
  • extension
Attribute 2.6 IMSExtension 5.54 extension Element

ResultStatus

Class 2.6 TBD ResultStatus.Type ComplexType
  • resultStatusVocabulary
Attribute 2.5 URI 5.55 resultStatusVocabulary Element
  • resultStatusValue
Attribute 2.5 Text 5.56 resultStatusValue Element
  • localKey
Attribute 2.5 NormalizedString 5.57 localKey Element
  • defaultDisplayName
Attribute 2.5 NormalizedString 5.58 defaultDisplayName Element

ResultValueRecordSet

Class 2.7 _ ResultValueRecordSet.Type ComplexType
  • resultValueRecord
Attribute 2.7 resultValueRecord 5.5 resultValueRecord Element

ResultValueRecord

Class 2.7 5.12 ResultValueRecord.Type ComplexType
  • sourcedGUID
Attribute 2.7 SourcedGUID 5.13 sourcedGUID Element
  • resultValue
Attribute 2.7 ResultValue 5.14 resultValue Element

ResultValue

Class 2.7 5.59 ResultValue.Type ComplexType
  • label
Attribute 2.7 Text 5.60 label Element
  • valueList
Attribute 2.7 ValueList 5.61 valueList Element
  • valueRange
Attribute 2.7 ValueRange 5.62 valueRange Element
  • dataSource
Attribute 2.7 GUID 5.63 dataSource Element
  • recordInfo
Attribute 2.7 Metadata 5.64 recordInfo Element
  • extension
Attribute 2.7 IMSExtension 5.65 extension Element

ValueList

Class 2.7 5.66 ValueList.Type ComplexType
  • orderedValue
Attribute 2.7 OrderedValue 5.67 orderedValue Element

OrderedValue

Class 2.7 5.68 OrderedValue.Type ComplexType
  • ordinal
Attribute 2.7 Integer 5.69 ordinal Element
  • grade
Attribute 2.7 Text 5.70 grade Element
  • valueRange
Attribute 2.7 ValueRange 5.71 valueRange Element

ValueRange

Class 2.7 5.72 ValueList.Type ComplexType
  • min
Attribute 2.7 Real 5.73 min Element
  • max
Attribute 2.7 Real 5.74 max Element

Metadata

Class 2.8 5.75 Metadata.Type ComplexType
  • metadataNameVocabulary
Attribute 2.8 URI 5.76 metadataNameVocabulary Element
  • metadataValueVocabulary
Attribute 2.8 URI 5.77 metadataValueVocabulary Element
  • metadataField
Attribute 2.8 ExtensionField 5.78 metadataField Element

IMSExtension

Class 2.8 5.79 IMSExtension.Type ComplexType
  • extensionNameVocabulary
Attribute 2.8 URI 5.80 extensionNameVocabulary Element
  • extensionValueVocabulary
Attribute 2.8 URI 5.81 extensionValueVocabulary Element
  • extensionField
Attribute 2.8 ExtensionField 5.82 extensionField Element

ExtensionField

Class 2.8 5.83 ExtensionField.Type ComplexType
  • fieldName
Attribute 2.8 NormalizedString 5.84 fieldName Element
  • fieldType
Attribute 2.8 NormalizedString 5.85 fieldType Element
  • fieldValue
Attribute 2.8 NormalizedString 5.86 fieldValue Element

Text

Class 2.8 5.87 Text.Type ComplexType
  • language
Attribute 2.8 NormalizedString 5.88 language Element
  • textString
Attribute 2.8 String 5.89 textString Element

SourcedGUID

Class 2.8 5.90 SourcedGUID.Type ComplexType
  • refAgentInstanceID
Attribute 2.8 NormalizedString 5.91 refAgentInstanceID Element
  • sourcedId
Attribute 2.8 GUID 5.92 sourcedGUID Element

imsx_StatusInfo

Class 2.4 See IMS GWSv1.0 imsx_StatusInfo.Type ComplexType
  • imsx_codeMajor
Attribute 2.4 n/a See IMS GWSv1.0 imsx_codeMajor Element
  • imsx_severity
Attribute 2.4 n/a See IMS GWSv1.0 imsx_severity Element
  • imsx_messageRefIdentifier
Attribute 2.4 n/a See IMS GWSv1.0 imsx_messageRefIdentifier Element
  • imsx_operationRefIdentifier
Attribute 2.4 n/a See IMS GWSv1.0 imsx_operationRefIdentifier Element
  • imsx_description
Attribute 2.4 n/a See IMS GWSv1.0 imsx_description Element
  • imsx_codeMinor
Attribute 2.4 n/a See IMS GWSv1.0 imsx_codeMinor Element

imsx_CodeMinor

Class 2.4 See IMS GWSv1.0 imsx_CodeMinor.Type ComplexType
  • imsx_codeMinorField
Attribute 2.4 n/a See IMS GWSv1.0 imsx_codeMinorField Element

imsx_CodeMinorField

Class 2.4 See IMS GWSv1.0 imsx_CodeMinorField.Type ComplexType
  • imsx_codeMinorFieldName
Attribute 2.4 n/a See IMS GWSv1.0 imsx_codeMinorFieldName Element
  • imsx_codeMinorFieldValue
Attribute 2.4 n/a See IMS GWSv1.0 imsx_codeMinorFieldValue Element

imsx_StatusBinding

Class 2.4 See IMS GWSv1.0 imsx_StatusBinding.Type ComplexType
  • imsx_syncRequestHeaderInfo
Attribute 2.4 n/a See IMS GWSv1.0 imsx_syncRequestHeaderInfo Element
  • imsx_syncResponseHeaderInfo
Attribute 2.4 n/a See IMS GWSv1.0 imsx_syncResponseHeaderInfo Element

imsx_RequestHeaderInfo

Class 2.4 See IMS GWSv1.0 imsx_RequestHeaderInfo.Type ComplexType
  • imsx_version
Attribute 2.4 n/a See IMS GWSv1.0 imsx_version Element
  • imsx_messageIdentifier
Attribute 2.4 n/a See IMS GWSv1.0 imsx_messageIdentifier Element

imsx_ResponseHeaderInfo

Class 2.4 See IMS GWSv1.0 imsx_ResponseHeaderInfo.Type ComplexType
  • imsx_version
Attribute 2.4 n/a See IMS GWSv1.0 imsx_version Element
  • imsx_messageIdentifier
Attribute 2.4 n/a See IMS GWSv1.0 imsx_messageIdentifier Element
  • imsx_statusInfo
Attribute 2.4 n/a See IMS GWSv1.0 imsx_statusInfo Element

Key:

  1. The 'PSM Reference' field refers to information in the PSM description (Section 2 in this document). The sub-fields are:
    1. Name – the name of the data structure in the PSM and PIM
    2. UML Type – the type of UML construct i.e. either Class or Attribute
    3. Figure – the reference Figure number in this document;
  2. The 'PIM Reference' field refers to infomation in the OMS Information Model [OMS, 11]. The sub-fields are:
    1. Type – the type of the data structure in the Information Model
    2. Table – the reference number of Tabular description in the corresponding Information Model document;
  3. The 'XSD Reference' field refers to infrmation in the XSD descriptions (Section 5 in this document). The sub-fields are:
    1. Name – the name of the field in the XSD(s)
    2. Type – the type of XSD construct i.e. either a ComplexType or Element.
top | toc

4. WSDL File Documentation

WSDL file: "WSDL file: "OutcomesManagementServicev1p0_SyncSingle_v1p0.wsdl"

Target namespace: http://www.imsglobal.org/services/lis/oms1p0/wsdl11/sync/imsoms_v1p0

4.1 Overview

Services
OutcomesManagementServiceSyncService
Bindings
LineItemManagerSyncSoapBinding
ResultManagerSyncSoapBinding
ResultValueManagerSyncSoapBinding
Port types
LineItemManagerSyncPortType
ResultManagerSyncPortType
ResultValueManagerSyncPortType
Messages
createLineItemRequest, createLineItemResponse, createByProxyLineItemRequest, createByProxyLineItemResponse, deleteLineItemRequest, deleteLineItemResponse, readLineItemRequest, readLineItemResponse, readAllLineItemIdsRequest, readAllLineItemIdsResponse, readLineItemIdsForPersonRequest, readLineItemIdsForPersonResponse, readLineItemIdsForCourseOfferingRequest, readLineItemIdsForCourseOfferingResponse, readLineItemIdsForCourseSectionRequest, readLineItemIdsForCourseSectionResponse, readLineItemIdsForCourseSectionWithLineItemTypeRequest, readLineItemIdsForCourseSectionWithLineItemTypeResponse, readLineItemIdsWithLineItemTypeRequest, readLineItemIdsWithLineItemTypeResponse, readLineItemIdsFromSavePointRequest, readLineItemIdsFromSavePointResponse, readLineItemsRequest, readLineItemsResponse, readLineItemsFromSavePointRequest, readLineItemsFromSavePointResponse, updateLineItemRequest, updateLineItemResponse, replaceLineItemRequest, replaceLineItemResponse, discoverLineItemIdsRequest, discoverLineItemIdsResponse, changeLineItemIdentifierRequest, changeLineItemIdentifierResponse, createResultRequest, createResultResponse, createByProxyResultRequest, createByProxyResultResponse, deleteResultRequest, deleteResultResponse, readResultRequest, readResultResponse, readAllResultIdsRequest, readAllResultIdsResponse, readResultIdsForPersonRequest, readResultIdsForPersonResponse, readResultIdsForLineItemRequest, readResultIdsForLineItemResponse, readResultIdsForCourseOfferingRequest, readResultIdsForCourseOfferingResponse, readResultIdsForCourseSectionRequest, readResultIdsForCourseSectionResponse, readResultIdsForCourseSectionWithStatusRequest, readResultIdsForCourseSectionWithStatusResponse, readResultIdsForLineItemWithLineItemTypeRequest, readResultIdsForLineItemWithLineItemTypeResponse, readResultIdsFromSavePointRequest, readResultIdsFromSavePointResponse, readResultsRequest, readResultsResponse, readResultsFromSavePointRequest, readResultsFromSavePointResponse, updateResultRequest, updateResultResponse, replaceResultRequest, replaceResultResponse, replaceResultsForLineItemRequest, replaceResultsForLineItemResponse, discoverResultIdsRequest, discoverResultIdsResponse, changeResultIdentifierRequest, changeResultIdentifierResponse, createResultValueRequest, createResultValueResponse, createByProxyResultValueRequest, createByProxyResultValueResponse, deleteResultValueRequest, deleteResultValueResponse, readResultValueRequest, readResultValueResponse, readAllResultValueIdsRequest, readAllResultValueIdsResponse, readResultValueIdForLineItemRequest, readResultValueIdForLineItemResponse, readResultValueIdForResultRequest, readResultValueIdForResultResponse, readResultValueIdsFromSavePointRequest, readResultValueIdsFromSavePointResponse, readResultValuesRequest, readResultValuesResponse, readResultValuesFromSavePointRequest, readResultValuesFromSavePointResponse, updateResultValueRequest, updateResultValueResponse, replaceResultValueRequest, replaceResultValueResponse, discoverResultValueIdsRequest, discoverResultValueIdsResponse, changeResultValueIdentifierRequest, changeResultValueIdentifierResponse,

WSDL Definition
Name Documentation
OutcomesManagementServiceSyncServices

WSDL File Information

Services: OutcomesManagementService (Synchronous Communications)

Author: Colin Smythe

Date: 30th June, 2011

Version: 2.0

Status: Public Draft

Description: The Outcomes Management Service.

History: Version 1.0: This is the first formal release of this service.

WSDL Binding: WSDL Binding is based upon the IMS General Web Services Base Profile v1.0 The IMS GWS Basic Profile is derived from the WS-I Basic Profile v1.1. This profile uses: WSDL 1.1, SOAP 1.1, HTTP 1.1 and XML 1.0. Extension profiles to the IMS GWS Base Profile are available but are not supported using this tool version.

License: IPR, License and Distribution Notices

This machine readable file is derived from IMS Global Learning Consortium (GLC) specification IMS GLC Outcome Management Version 1.0 found at http://www.imsglobal.org/lis/omsv1p0/imsoms_InfoModelCMv1.pdf and the original IMS schema binding or code base http://www.imsglobal.org/lis/omsv1p0/imsomsv1p0_BindingCMv1.html.

Recipients of this document are requested to submit, with their comments, notification of any relevant patent claims or other intellectual property rights of which they may be aware that might be infringed by the schema binding contained in this document.

IMS GLC takes no position regarding the validity or scope of any intellectual property or other rights that might be claimed to pertain to the implementation or use of the technology described in this document or the extent to which any license under such rights might or might not be available; neither does it represent that it has made any effort to identify any such rights. Information on IMS GLCs procedures with respect to rights in IMS GLC specifications can be found at the IMS GLC Intellectual Property Rights web page: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf.

Copyright © IMS Global Learning Consortium 1999-2011. All Rights Reserved.

License Notice for Users

Users of products or services that include this document are hereby granted a worldwide, royalty-free, non-exclusive license to use this document.

Distribution Notice for Developers

Developers of products or services that are not original incorporators of this document and have not changed this document, that is, are distributing a software product that incorporates this document as is from a third-party source other than IMS, are hereby granted permission to copy, display and distribute the contents of this document in any medium for any purpose without fee or royalty provided that you include this IPR, License and Distribution notice in its entirety on ALL copies, or portions thereof.

Developers of products or services that are original incorporators of this document and wish to provide distribution of this document as is or with modifications and developers of products and services that are not original incorporators of this document and have changed this document, are required to register with the IMS GLC community on the IMS GLC website as described in the following two paragraphs:-

  • If you wish to distribute this document as is, with no modifications, you are hereby granted permission to copy, display and distribute the contents of this document in any medium for any purpose without fee or royalty provided that you include this IPR, License and Distribution notice in its entirety on ALL copies, or portions thereof, that you make and you complete a valid license registration with IMS and receive an email from IMS granting the license. To register, follow the instructions on the IMS website: http://www.imsglobal.org/specificationdownload.cfm. Once registered you are granted permission to transfer unlimited distribution rights of this document for the purposes of third-party or other distribution of your product or service that incorporates this document as long as this IPR, License and Distribution notice remains in place in its entirety.
  • If you wish to create and distribute a derived work from this document, you are hereby granted permission to copy, display and distribute the contents of the derived work in any medium for any purpose without fee or royalty provided that you include this IPR, License and Distribution notice in its entirety on ALL copies, or portions thereof, that you make and you complete a valid profile registration with IMS GLC and receive an email from IMS GLC granting the license. To register, follow the instructions on the IMS GLC website: http://www.imsglobal.org/profile/. Once registered you are granted permission to transfer unlimited distribution rights of the derived work for the purposes of third-party or other distribution of your product or service that incorporates the derived work as long as this IPR, License and Distribution notice remains in place in its entirety.

The limited permissions granted above are perpetual and will not be revoked by IMS GLC or its successors or assigns.

THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTERS OWN RISK, AND NEITHER THE CONSORTIUM NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION.

UML Source File Information

Choreography: Sync

Transport: SOAPv1.1

Source XSLT File Information

XSL Generator: UMLtoWSDLTransformv0p9p5.xsl

XSLT Processor: Xalan

Release: 1.0 Beta 4

Date: 31st March, 2011

IMS GLC Auto-generation Binding Tool-kit (I-BAT)

This file was auto-generated using the IMS GLC Binding Auto-generation Tool-kit (I-BAT). While every attempt has been made to ensure that this tool auto-generates the files correctly, users should be aware that this is an experimental tool. Permission is given to make use of this tool. IMS GLC makes no claim on the materials created by third party users of this tool. Details on how to use this tool are contained in the IMS GLC "I-BAT" Documentation available at the IMS GLC web-site.

Tool Copyright: 2005-2011 (c) IMS Global Learning Consortium Inc. All Rights Reserved.


Services
Name Documentation
OutcomesManagementServiceSyncService

Service Information

Author: Colin Smythe

Date: 30th June, 2011

Version: 2.0

Status: Public Draft

Description: The Outcomes Management Service is composed of three interfaces each of which has several operations.

History: Version 1.0: This is the first formal release of this service. This service is a part of the IMS LIS v2.0 specification.



Service : OutcomesManagementServiceSyncService
Port Name Binding Address Extensibility Documentation
LineItemManagerSyncSoapPort LineItemManagerSyncSoapBinding <soap11:address location="http://www.imsglobal.org/lis/oms1p0/LineItemManagerSyncSoap/"/>
N/A
ResultManagerSyncSoapPort ResultManagerSyncSoapBinding <soap11:address location="http://www.imsglobal.org/lis/oms1p0/ResultManagerSyncSoap/"/>
N/A
ResultValueManagerSyncSoapPort ResultValueManagerSyncSoapBinding <soap11:address location="http://www.imsglobal.org/lis/oms1p0/ResultValueManagerSyncSoap/"/>
N/A


Binding : LineItemManagerSyncSoapBinding
Port Type LineItemManagerSyncPortType
Extensibility <soap11:binding transport="http://schemas.xmlsoap.org/soap/http" style="document"/>
Operations createLineItem, createByProxyLineItem, deleteLineItem, readLineItem, readAllLineItemIds, readLineItemIdsForPerson, readLineItemIdsForCourseOffering, readLineItemIdsForCourseSection, readLineItemIdsForCourseSectionWithLineItemType, readLineItemIdsWithLineItemType, readLineItemIdsFromSavePoint, readLineItems, readLineItemsFromSavePoint, updateLineItem, replaceLineItem, discoverLineItemIds, changeLineItemIdentifier,


Binding : ResultManagerSyncSoapBinding
Port Type ResultManagerSyncPortType
Extensibility <soap11:binding transport="http://schemas.xmlsoap.org/soap/http" style="document"/>
Operations createResult, createByProxyResult, deleteResult, readResult, readAllResultIds, readResultIdsForPerson, readResultIdsForLineItem, readResultIdsForCourseOffering, readResultIdsForCourseSection, readResultIdsForCourseSectionWithStatus, readResultIdsForLineItemWithLineItemType, readResultIdsFromSavePoint, readResults, readResultsFromSavePoint, updateResult, replaceResult, replaceResultsForLineItem, discoverResultIds, changeResultIdentifier,


Binding : ResultValueManagerSyncSoapBinding
Port Type ResultValueManagerSyncPortType
Extensibility <soap11:binding transport="http://schemas.xmlsoap.org/soap/http" style="document"/>
Operations createResultValue, createByProxyResultValue, deleteResultValue, readResultValue, readAllResultValueIds, readResultValueIdForLineItem, readResultValueIdForResult, readResultValueIdsFromSavePoint, readResultValues, readResultValuesFromSavePoint, updateResultValue, replaceResultValue, discoverResultValueIds, changeResultValueIdentifier,


Port Type : LineItemManagerSyncPortType
Operation Name Input message Output message Documentation
createLineItem createLineItemRequest createLineItemResponse
The 'createLineItem' operation requests the service provider to create a new LineItem object with the supplied sourcedId value.
createByProxyLineItem createByProxyLineItemRequest createByProxyLineItemResponse
The 'createByProxyLineItem' operation requests the service provider to create a new LineItem object with a sourcedId allocated by the service provider itself.
deleteLineItem deleteLineItemRequest deleteLineItemResponse
The 'deleteLineItem' operation requests the service provider to delete the identified LineItem object.
readLineItem readLineItemRequest readLineItemResponse
The 'readLineItem' operation requests the service provider to supply the stored data for the identified LineItem object.
readAllLineItemIds readAllLineItemIdsRequest readAllLineItemIdsResponse
The 'readAllLineItemIds' operation requests the service provider to supply all of the SourcedIds that have been assigned to LineItem objects.
readLineItemIdsForPerson readLineItemIdsForPersonRequest readLineItemIdsForPersonResponse
The 'readLineItemIdsForPerson' operation requests the service provider to supply the SourcedIds of the LineItem objects that contain results for the identified Person.
readLineItemIdsForCourseOffering readLineItemIdsForCourseOfferingRequest readLineItemIdsForCourseOfferingResponse
The 'readLineItemIdsForCourseOffering' operation requests the service provider to supply the SourcedIds of the LineItem objects that contain results associated with the identified CourseOffering.
readLineItemIdsForCourseSection readLineItemIdsForCourseSectionRequest readLineItemIdsForCourseSectionResponse
The 'readLineItemIdsForCourseSection' operation requests the service provider to supply the SourcedIds of the LineItem objects that contain results associated with the identified CourseSection.
readLineItemIdsForCourseSectionWithLineItemType readLineItemIdsForCourseSectionWithLineItemTypeRequest readLineItemIdsForCourseSectionWithLineItemTypeResponse
The 'readLineItemIdsForCourseSectionWithLineItemType' operation requests the service provider to supply the SourcedIds of the LineItem objects for the identified CourseSection with the identified LineItemType.
readLineItemIdsWithLineItemType readLineItemIdsWithLineItemTypeRequest readLineItemIdsWithLineItemTypeResponse
The 'readLineItemIdsWithLineItemTypen' operation requests the service provider to supply the SourcedIds of the LineItem objects with the identified LineItemType.
readLineItemIdsFromSavePoint readLineItemIdsFromSavePointRequest readLineItemIdsFromSavePointResponse
The 'readLineItemIdsFromSavePoint' operation requests the service provider to supply the SourcedIds of the LineItem objects that have been altered after the defined reference point (SavePoint).
readLineItems readLineItemsRequest readLineItemsResponse
The 'readLineItems' operation requests the service provider to supply the LineItem objects that have been identified by the service consumer.
readLineItemsFromSavePoint readLineItemsFromSavePointRequest readLineItemsFromSavePointResponse
The 'readLineItemsFromSavePoint' operation requests the service provider to supply the LineItem objects that have been altered after the defined reference point (SavePoint).
updateLineItem updateLineItemRequest updateLineItemResponse
The 'updateLineItem' operation requests the service provider to write the new data into identified LineItem object (this is an additive write).
replaceLineItem replaceLineItemRequest replaceLineItemResponse
The 'replaceLineItem' operation requests the service provider to write the new data into identified LineItem object (this is an destructive overwrite of all the previously stored data). If the identified object does not exist, this becomes a 'createLineItem' operation.
discoverLineItemIds discoverLineItemIdsRequest discoverLineItemIdsResponse
The 'discoverLineItem' operation requests the service provider to supply the SourcedIds for all of the LineItem objects that comply to the supplied search criteria.
changeLineItemIdentifier changeLineItemIdentifierRequest changeLineItemIdentifierResponse
The 'changeLineItemIdentifier' operation requests the service provider to change the SourcedId for the identified LineItem object.


Port Type : ResultManagerSyncPortType
Operation Name Input message Output message Documentation
createResult createResultRequest createResultResponse
The 'createLineItem' operation requests the service provider to create a new LineItem object with the supplied sourcedId value.
createByProxyResult createByProxyResultRequest createByProxyResultResponse
The 'createByProxyResult' operation requests the service provider to create a new LineItem object with a sourcedId allocated by the service provider itself.
deleteResult deleteResultRequest deleteResultResponse
The 'deleteResult' operation requests the service provider to delete the identified Result object.
readResult readResultRequest readResultResponse
The 'readResult' operation requests the service provider to supply the stored data for the identified Result object.
readAllResultIds readAllResultIdsRequest readAllResultIdsResponse
The 'readAllResultIds' operation requests the service provider to supply all of the SourcedIds that have been assigned to Result objects.
readResultIdsForPerson readResultIdsForPersonRequest readResultIdsForPersonResponse
The 'readResultIdsForPerson' operation requests the service provider to supply the SourcedIds of the Result objects for the identified Person.
readResultIdsForLineItem readResultIdsForLineItemRequest readResultIdsForLineItemResponse
The 'readResultIdsForLineItem' operation requests the service provider to supply the SourcedIds of the Result objects for the identified LineItem.
readResultIdsForCourseOffering readResultIdsForCourseOfferingRequest readResultIdsForCourseOfferingResponse
The 'readResultIdsForCourseOffering' operation requests the service provider to supply the SourcedIds of the Result objects for the identified CourseOffering.
readResultIdsForCourseSection readResultIdsForCourseSectionRequest readResultIdsForCourseSectionResponse
The 'readResultIdsForSection' operation requests the service provider to supply the SourcedIds of the Result objects for the identified CourseSection.
readResultIdsForCourseSectionWithStatus readResultIdsForCourseSectionWithStatusRequest readResultIdsForCourseSectionWithStatusResponse
The 'readResultIdsForSection' operation requests the service provider to supply the SourcedIds of the Result objects for the identified result status and for the identified CourseSection.
readResultIdsForLineItemWithLineItemType readResultIdsForLineItemWithLineItemTypeRequest readResultIdsForLineItemWithLineItemTypeResponse
The 'readResultIdsForLineItemsWithLineItemType' operation requests the service provider to supply the SourcedIds of the Result objects with the given result status for the identified LineItemObject and with the given LineItemType.
readResultIdsFromSavePoint readResultIdsFromSavePointRequest readResultIdsFromSavePointResponse
The 'readResultIdsFromSavePoint' operation requests the service provider to supply the SourcedIds of the Result objects that have been altered after the defined reference point (SavePoint).
readResults readResultsRequest readResultsResponse
The 'readResults' operation requests the service provider to supply the Result objects that have been identified by the service consumer.
readResultsFromSavePoint readResultsFromSavePointRequest readResultsFromSavePointResponse
The 'readResultsFromSavePoint' operation requests the service provider to supply the Result objects that have been altered after the defined reference point (SavePoint).
updateResult updateResultRequest updateResultResponse
The 'updateResult' operation requests the service provider to write the new data into identified Result object (this is an additive write).
replaceResult replaceResultRequest replaceResultResponse
The 'replaceResult' operation requests the service provider to write the new data into identified Result object (this is an destructive overwrite of all the previously stored data). If the identified object does not exist, this becomes a 'createResult' operation.
replaceResultsForLineItem replaceResultsForLineItemRequest replaceResultsForLineItemResponse
The 'replaceResultsForLineItem' operation sends the Result records all for PersonSourcedIds for a specific LIneItem object in one request message.
discoverResultIds discoverResultIdsRequest discoverResultIdsResponse
The 'discoverResult' operation requests the service provider to supply the SourcedIds for all of the Result objects that comply to the supplied search criteria.
changeResultIdentifier changeResultIdentifierRequest changeResultIdentifierResponse
The 'changeResultIdentifier' operation requests the service provider to change the SourcedId for the identified Result object.


Port Type : ResultValueManagerSyncPortType
Operation Name Input message Output message Documentation
createResultValue createResultValueRequest createResultValueResponse
The 'createLineItem' operation requests the service provider to create a new LineItem object with the supplied sourcedId value.
createByProxyResultValue createByProxyResultValueRequest createByProxyResultValueResponse
The 'createByProxyResultValue' operation requests the service provider to create a new LineItem object with a sourcedId allocated by the service provider itself.
deleteResultValue deleteResultValueRequest deleteResultValueResponse
The 'deleteResultValue' operation requests the service provider to delete the identified ResultValue object.
readResultValue readResultValueRequest readResultValueResponse
The 'readResultValue' operation requests the service provider to supply the stored data for the identified Result object.
readAllResultValueIds readAllResultValueIdsRequest readAllResultValueIdsResponse
The 'readAllResultValueIds' operation requests the service provider to supply all of the SourcedIds that have been assigned to ResultValue objects.
readResultValueIdForLineItem readResultValueIdForLineItemRequest readResultValueIdForLineItemResponse
The 'readResultValueIdForLineItem' operation requests the service provider to supply the SourcedId of the ResultValue objects for the identified LineItem.
readResultValueIdForResult readResultValueIdForResultRequest readResultValueIdForResultResponse
The 'readResultValueIdForResult' operation requests the service provider to supply the SourcedId of the ResultValue objects for the identified Result.
readResultValueIdsFromSavePoint readResultValueIdsFromSavePointRequest readResultValueIdsFromSavePointResponse
The 'readResultValueIdsFromSavePoint' operation requests the service provider to supply the SourcedIds of the ResultValue objects that have been altered after the defined reference point (SavePoint).
readResultValues readResultValuesRequest readResultValuesResponse
The 'readResultValues' operation requests the service provider to supply the ResultValue objects that have been identified by the service consumer.
readResultValuesFromSavePoint readResultValuesFromSavePointRequest readResultValuesFromSavePointResponse
The 'readResultValuesFromSavePoint' operation requests the service provider to supply the ResultValue objects that have been altered after the defined reference point (SavePoint).
updateResultValue updateResultValueRequest updateResultValueResponse
The 'updateResultValue' operation requests the service provider to write the new data into identified ResultValue object (this is an additive write).
replaceResultValue replaceResultValueRequest replaceResultValueResponse
The 'replaceResultValue' operation requests the service provider to write the new data into identified ResultValue object (this is an destructive overwrite of all the previously stored data). If the identified object does not exist, this becomes a 'createResultValue' operation.
discoverResultValueIds discoverResultValueIdsRequest discoverResultValueIdsResponse
The 'discoverResultValue' operation requests the service provider to supply the SourcedIds for all of the ResultValue objects that comply to the supplied search criteria.
changeResultValueIdentifier changeResultValueIdentifierRequest changeResultValueIdentifierResponse
The 'changeResultValueIdentifier' operation requests the service provider to change the SourcedId for the identified ResultValue object.


4.2 Messages

createLineItemRequest

Part Name Element Type Documentation
Parameters tns:createLineItemRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

createLineItemResponse

Part Name Element Type Documentation
Response tns:createLineItemResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

createByProxyLineItemRequest

Part Name Element Type Documentation
Parameters tns:createByProxyLineItemRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

createByProxyLineItemResponse

Part Name Element Type Documentation
Response tns:createByProxyLineItemResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

deleteLineItemRequest

Part Name Element Type Documentation
Parameters tns:deleteLineItemRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

deleteLineItemResponse

Part Name Element Type Documentation
Response tns:deleteLineItemResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readLineItemRequest

Part Name Element Type Documentation
Parameters tns:readLineItemRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readLineItemResponse

Part Name Element Type Documentation
Response tns:readLineItemResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readAllLineItemIdsRequest

Part Name Element Type Documentation
Parameters tns:readAllLineItemIdsRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readAllLineItemIdsResponse

Part Name Element Type Documentation
Response tns:readAllLineItemIdsResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readLineItemIdsForPersonRequest

Part Name Element Type Documentation
Parameters tns:readLineItemIdsForPersonRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readLineItemIdsForPersonResponse

Part Name Element Type Documentation
Response tns:readLineItemIdsForPersonResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readLineItemIdsForCourseOfferingRequest

Part Name Element Type Documentation
Parameters tns:readLineItemIdsForCourseOfferingRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readLineItemIdsForCourseOfferingResponse

Part Name Element Type Documentation
Response tns:readLineItemIdsForCourseOfferingResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readLineItemIdsForCourseSectionRequest

Part Name Element Type Documentation
Parameters tns:readLineItemIdsForCourseSectionRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readLineItemIdsForCourseSectionResponse

Part Name Element Type Documentation
Response tns:readLineItemIdsForCourseSectionResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readLineItemIdsForCourseSectionWithLineItemTypeRequest

Part Name Element Type Documentation
Parameters tns:readLineItemIdsForCourseSectionWithLineItemTypeRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readLineItemIdsForCourseSectionWithLineItemTypeResponse

Part Name Element Type Documentation
Response tns:readLineItemIdsForCourseSectionWithLineItemTypeResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readLineItemIdsWithLineItemTypeRequest

Part Name Element Type Documentation
Parameters tns:readLineItemIdsWithLineItemTypeRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readLineItemIdsWithLineItemTypeResponse

Part Name Element Type Documentation
Response tns:readLineItemIdsWithLineItemTypeResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readLineItemIdsFromSavePointRequest

Part Name Element Type Documentation
Parameters tns:readLineItemIdsFromSavePointRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readLineItemIdsFromSavePointResponse

Part Name Element Type Documentation
Response tns:readLineItemIdsFromSavePointResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readLineItemsRequest

Part Name Element Type Documentation
Parameters tns:readLineItemsRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readLineItemsResponse

Part Name Element Type Documentation
Response tns:readLineItemsResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readLineItemsFromSavePointRequest

Part Name Element Type Documentation
Parameters tns:readLineItemsFromSavePointRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readLineItemsFromSavePointResponse

Part Name Element Type Documentation
Response tns:readLineItemsFromSavePointResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

updateLineItemRequest

Part Name Element Type Documentation
Parameters tns:updateLineItemRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

updateLineItemResponse

Part Name Element Type Documentation
Response tns:updateLineItemResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

replaceLineItemRequest

Part Name Element Type Documentation
Parameters tns:replaceLineItemRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

replaceLineItemResponse

Part Name Element Type Documentation
Response tns:replaceLineItemResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

discoverLineItemIdsRequest

Part Name Element Type Documentation
Parameters tns:discoverLineItemIdsRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

discoverLineItemIdsResponse

Part Name Element Type Documentation
Response tns:discoverLineItemIdsResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

changeLineItemIdentifierRequest

Part Name Element Type Documentation
Parameters tns:changeLineItemIdentifierRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

changeLineItemIdentifierResponse

Part Name Element Type Documentation
Response tns:changeLineItemIdentifierResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

createResultRequest

Part Name Element Type Documentation
Parameters tns:createResultRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

createResultResponse

Part Name Element Type Documentation
Response tns:createResultResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

createByProxyResultRequest

Part Name Element Type Documentation
Parameters tns:createByProxyResultRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

createByProxyResultResponse

Part Name Element Type Documentation
Response tns:createByProxyResultResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

deleteResultRequest

Part Name Element Type Documentation
Parameters tns:deleteResultRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A



deleteResultResponse

Part Name Element Type Documentation
Response tns:deleteResultResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readResultRequest

Part Name Element Type Documentation
Parameters tns:readResultRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readResultResponse

Part Name Element Type Documentation
Response tns:readResultResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readAllResultIdsRequest

Part Name Element Type Documentation
Parameters tns:readAllResultIdsRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readAllResultIdsResponse

Part Name Element Type Documentation
Response tns:readAllResultIdsResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readResultIdsForPersonRequest

Part Name Element Type Documentation
Parameters tns:readResultIdsForPersonRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readResultIdsForPersonResponse

Part Name Element Type Documentation
Response tns:readResultIdsForPersonResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readResultIdsForLineItemRequest

Part Name Element Type Documentation
Parameters tns:readResultIdsForLineItemRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readResultIdsForLineItemResponse

Part Name Element Type Documentation
Response tns:readResultIdsForLineItemResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readResultIdsForCourseOfferingRequest

Part Name Element Type Documentation
Parameters tns:readResultIdsForCourseOfferingRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readResultIdsForCourseOfferingResponse

Part Name Element Type Documentation
Response tns:readResultIdsForCourseOfferingResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readResultIdsForCourseSectionRequest

Part Name Element Type Documentation
Parameters tns:readResultIdsForCourseSectionRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readResultIdsForCourseSectionResponse

Part Name Element Type Documentation
Response tns:readResultIdsForCourseSectionResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readResultIdsForCourseSectionWithStatusRequest

Part Name Element Type Documentation
Parameters tns:readResultIdsForCourseSectionWithStatusRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readResultIdsForCourseSectionWithStatusResponse

Part Name Element Type Documentation
Response tns:readResultIdsForCourseSectionWithStatusResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readResultIdsForLineItemWithLineItemTypeRequest

Part Name Element Type Documentation
Parameters tns:readResultIdsForLineItemWithLineItemTypeRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readResultIdsForLineItemWithLineItemTypeResponse

Part Name Element Type Documentation
Response tns:readResultIdsForLineItemWithLineItemTypeResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readResultIdsFromSavePointRequest

Part Name Element Type Documentation
Parameters tns:readResultIdsFromSavePointRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readResultIdsFromSavePointResponse

Part Name Element Type Documentation
Response tns:readResultIdsFromSavePointResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readResultsRequest

Part Name Element Type Documentation
Parameters tns:readResultsRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readResultsResponse

Part Name Element Type Documentation
Response tns:readResultsResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readResultsFromSavePointRequest

Part Name Element Type Documentation
Parameters tns:readResultsFromSavePointRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readResultsFromSavePointResponse

Part Name Element Type Documentation
Response tns:readResultsFromSavePointResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

updateResultRequest

Part Name Element Type Documentation
Parameters tns:updateResultRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

updateResultResponse

Part Name Element Type Documentation
Response tns:updateResultResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

replaceResultRequest

Part Name Element Type Documentation
Parameters tns:replaceResultRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

replaceResultResponse

Part Name Element Type Documentation
Response tns:replaceResultResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

replaceResultsForLineItemRequest

Part Name Element Type Documentation
Parameters tns:replaceResultsForLineItemRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

replaceResultsForLineItemResponse

Part Name Element Type Documentation
Response tns:replaceResultsForLineItemResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

discoverResultIdsRequest

Part Name Element Type Documentation
Parameters tns:discoverResultIdsRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

discoverResultIdsResponse

Part Name Element Type Documentation
Response tns:discoverResultIdsResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

changeResultIdentifierRequest

Part Name Element Type Documentation
Parameters tns:changeResultIdentifierRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

changeResultIdentifierResponse

Part Name Element Type Documentation
Response tns:changeResultIdentifierResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

createResultValueRequest

Part Name Element Type Documentation
Parameters tns:createResultValueRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

createResultValueResponse

Part Name Element Type Documentation
Response tns:createResultValueResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

createByProxyResultValueRequest

Part Name Element Type Documentation
Parameters tns:createByProxyResultValueRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

createByProxyResultValueResponse

Part Name Element Type Documentation
Response tns:createByProxyResultValueResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

deleteResultValueRequest

Part Name Element Type Documentation
Parameters tns:deleteResultValueRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

deleteResultValueResponse

Part Name Element Type Documentation
Response tns:deleteResultValueResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readResultValueRequest

Part Name Element Type Documentation
Parameters tns:readResultValueRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readResultValueResponse

Part Name Element Type Documentation
Response tns:readResultValueResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readAllResultValueIdsRequest

Part Name Element Type Documentation
Parameters tns:readAllResultValueIdsRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readAllResultValueIdsResponse

Part Name Element Type Documentation
Response tns:readAllResultValueIdsResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readResultValueIdForLineItemRequest

Part Name Element Type Documentation
Parameters tns:readResultValueIdForLineItemRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readResultValueIdForLineItemResponse

Part Name Element Type Documentation
Response tns:readResultValueIdForLineItemResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readResultValueIdForResultRequest

Part Name Element Type Documentation
Parameters tns:readResultValueIdForResultRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readResultValueIdForResultResponse

Part Name Element Type Documentation
Response tns:readResultValueIdForResultResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readResultValueIdsFromSavePointRequest

Part Name Element Type Documentation
Parameters tns:readResultValueIdsFromSavePointRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readResultValueIdsFromSavePointResponse

Part Name Element Type Documentation
Response tns:readResultValueIdsFromSavePointResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readResultValuesRequest

Part Name Element Type Documentation
Parameters tns:readResultValuesRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readResultValuesResponse

Part Name Element Type Documentation
Response tns:readResultValuesResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

readResultValuesFromSavePointRequest

Part Name Element Type Documentation
Parameters tns:readResultValuesFromSavePointRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

readResultValuesFromSavePointResponse

Part Name Element Type Documentation
Response tns:readResultValuesFromSavePointResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

updateResultValueRequest

Part Name Element Type Documentation
Parameters tns:updateResultValueRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

updateResultValueResponse

Part Name Element Type Documentation
Response tns:updateResultValueResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

replaceResultValueRequest

Part Name Element Type Documentation
Parameters tns:replaceResultValueRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

replaceResultValueResponse

Part Name Element Type Documentation
Response tns:replaceResultValueResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

discoverResultValueIdsRequest

Part Name Element Type Documentation
Parameters tns:discoverResultValueIdsRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

discoverResultValueIdsResponse

Part Name Element Type Documentation
Response tns:discoverResultValueIdsResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

changeResultValueIdentifierRequest

Part Name Element Type Documentation
Parameters tns:changeResultValueIdentifierRequest N/A
N/A
HeaderInfoParameters tns:imsx_syncRequestHeaderInfo N/A
N/A

changeResultValueIdentifierResponse

Part Name Element Type Documentation
Response tns:changeResultValueIdentifierResponse N/A
N/A
HeaderInfoResponse tns:imsx_syncResponseHeaderInfo N/A
N/A

top | toc


5. XSD File Documentation

The XSD file documentation has been produced by the Oxygen XML Editing tool.

5.1 Service Data Model

Click on the Section header to access this documentation for the data models in the service description.

5.2 File Data Model

Click on the Section header to access this documentation for the data models for the exchange of Outcomes objects in an external file.

top | toc

6. Binding of the Vocabularies

The vocabularies in the OMS are:

This vocabulary is the default set maintained under the IMS GLC Vocabulary Registry [SDN11, 06].  It is the responsibility of an implementation to ensure that it is using the correct and latest versions of the vocabulary files.  Changes to the default vocabularies are permitted; this results in the creation of a new vocabulary that should be registered with IMS GLC.  As part of a profiling process entirely new vocabularies may be defined to replace the default set.

Figure 6.1 The PSM representation of the lineitemtype vocabulary for the OMS.

Figure 6.2 The PSM representation of the statusofresult vocabulary for the OMS.

Figure 6.3 The PSM representation of the replacestatuscode vocabulary for the OMS.

Figure 6.4 The PSM representation of the extension data-type vocabulary for the OMS.

top | toc

Appendix A - Listing of the WSDLs

The WSDL bindings are for a Synchronous SOAP implementation only. The WSDL files, expressed using WSDLv1.1, are:

These files were generated by the I-BATv0.9.5 tool using the PSM representation described in Section 2.

top | toc

Appendix B - Listing of the XSDs

The XSD files are:

This file was generated by the I-BATv0.9.5 tool using the PSM representation described in Section 2. Documentation of the XSDs is supplied in Section 5.

top | toc

Appendix C - Vocabulary VDEX Instance File Listings

The OMS vocabularies are:

The online version of these vocabularies are available in the directory: http://www.imsglobal.org/vdex/lis/omsv1p0. These vocabularies are expressed as an instance of the IMS GLC Vocabulary Data Exchange (VDEX) v1.0 specification. Documentation of the vocabulary is supplied in Section 6.

top | toc

Appendix D - Example SOAP Messages

The set of examples for the SOAP messages are listed in Tables D.1 (for the LineItem port), D.2 (for the Result port) and D.3 (for the ResultValue port). The messaging pattern is a Request/Response exchange to support the Synchronous Service definition.

Table D.1 The set of SOAP message examples for each operation of the LineItem port.

Operation Name Input (Request) SOAP Message Output (Response) SOAP Message
createLineItem createLineItemRequest createLineItemResponse
createByProxyLineItem createByProxyLineItemRequest createByProxyLineItemResponse
deleteLineItem deleteLineItemRequest deleteLineItemResponse
readLineItem readLineItemRequest readLineItemResponse
readAllLineItemIds readAllLineItemIdsRequest readAllLineItemIdsResponse
readLineItemIdsForPerson readLineItemIdsForPersonRequest readLineItemIdsForPersonResponse
readLineItemIdsForCourseOffering readLineItemIdsForCourseOfferingRequest readLineItemIdsForCourseOfferingResponse
readLineItemIdsForCourseSection readLineItemIdsForCourseSectionRequest readLineItemIdsForCourseSectionResponse
readLineItemIdsForCourseSectionWithLineItemType readLineItemIdsForCourseSectionWithLineItemTypeRequest readLineItemIdsForCourseSectionWithLineItemTypeResponse
readLineItemIdsWithLineItemType readLineItemIdsWithLineItemTypeRequest readLineItemIdsWithLineItemTypeResponse
readLineItemIdsFromSavePoint readLineItemIdsFromSavePointRequest readLineItemIdsFromSavePointResponse
readLineItems readLineItemsRequest readLineItemsResponse
readLineItemsFromSavePoint readLineItemsFromSavePointRequest readLineItemsFromSavePointResponse
updateLineItem updateLineItemRequest updateLineItemResponse
replaceLineItem replaceLineItemRequest replaceLineItemResponse
discoverLineItemIds discoverLineItemIdsRequest discoverLineItemIdsResponse
changeLineItemIdentifier changeLineItemIdentifierRequest changeLineItemIdentifierResponse

Table D.2 The set of SOAP message examples for each operation of the Result port.

Operation Name Input (Request) SOAP Message Output (Response) SOAP Message
createResult createResultRequest createResultResponse
createByProxyResult createByProxyResultRequest createByProxyResultResponse
deleteResult deleteResultRequest deleteResultResponse
readResult readResultRequest readResultResponse
readAllResultIds readAllResultIdsRequest readAllResultIdsResponse
readResultIdsForPerson readResultIdsForPersonRequest readResultIdsForPersonResponse
readResultIdsForLineItem readResultIdsForLineItemRequest readResultIdsForLineItemResponse
readResultIdsForCourseOffering readResultIdsForCourseOfferingRequest readResultIdsForCourseOfferingResponse
readResultIdsForCourseSection readResultIdsForCourseSectionRequest readResultIdsForCourseSectionResponse
readResultIdsForCourseSectionWithStatus readResultIdsForCourseSectionWithStatusRequest readResultIdsForCourseSectionWithStatusResponse
readResultIdsForLineItemsWithLineItemType readResultIdsForLineItemsWithLineItemTypeRequest readResultIdsForLineItemsWithLineItemTypeResponse
readResultIdsFromSavePoint readResultIdsFromSavePointRequest readResultIdsFromSavePointResponse
readResults readResultsRequest readResultsResponse
readResultsFromSavePoint readResultsFromSavePointRequest readResultsFromSavePointResponse
updateResult updateResultRequest updateResultResponse
replaceResult replaceResultRequest replaceResultResponse
replaceResultsForLineItem replaceResultsForLineItemRequest replaceResultsForLineItemResponse
discoverResultIds discoverResultIdsRequest discoverResultIdsResponse
changeResultIdentifier changeResultIdentifierRequest changeResultIdentifierResponse

Table D.3 The set of SOAP message examples for each operation of the ResultValue port.

Operation Name Input (Request) SOAP Message Output (Response) SOAP Message
createResultValue createResultValueRequest createResultValueResponse
createByProxyResultValue createByProxyResultValueRequest createByProxyResultValueResponse
deleteResultValue deleteResultValueRequest deleteResultValueResponse
readResultValue readResultValueRequest readResultValueResponse
readAllResultValueIds readAllResultValueIdsRequest readAllResultValueIdsResponse
readResultValueIdForLineItem readResultValueIdForLineItemRequest readResultValueIdForLineItemResponse
readResultValueIdForResult readResultValueIdForResultRequest readResultValueIdForResultResponse
readResultValueIdsFromSavePoint readResultValueIdsFromSavePointRequest readResultValueIdsFromSavePointResponse
readResultValues readResultValuesRequest readResultValuesResponse
readResultValuesFromSavePoint readResultValuesFromSavePointRequest readResultValuesFromSavePointResponse
updateResultValue updateResultValueRequest updateResultValueResponse
replaceResultValue replaceResultValueRequest replaceResultValueResponse
discoverResultValueIds discoverResultValueIdsRequest discoverResultValueIdsResponse
changeResultValueIdentifier changeResultValueIdentifierRequest changeResultValueIdentifierResponse

top | toc

About This Document

Title
IMS GLC Outcomes Management Service WSDL/XSD Binding
Editor
Colin Smythe (IMS GLC)
Co-Chairs
Linda Feng (Oracle), Bill Lee (Desire2learn)
Version
2.0
Version Date
30 June 2011
Release
Final 1.0
Status
Public Draft
Summary
This document contains the description of the IMS GLC Outcomes Management Service v1.0 WSDL/XSD binding. This service is used to exchange information about reporting Outcomes. An Outcome consists of LineItems, Results and ResultValues. The business transactions include the simple create, read, update and delete of the Outcomes data models for a single instance. This document contains the definition of the corresponding Web Service based upon SOAP/HTTP messaging.
Revision Information
Original release
Purpose
This document is made available for review by the public community at large.
Document Location
http://www.imsglobal.org/lis/

top | toc

List of Contributors

The following individuals contributed to the development of this document:

Name
Organization
Kerry Blinco DEEWR (Australia)
Kirk Bunte
SungardHE (USA)
Angus Chan
Desire2learn (Canada)
Adam Cooper
JISC (UK)
Michael Feldstein
Cengage (USA)
Linda Feng
Oracle (USA)
Jon Fontaine
Blackboard (USA)
Chris Hatton
Pearson (USA)
Karen Kuffner
University of Michigan (USA)
Zack Leavitt
eCollege (USA)
Bill Lee
Desire2learn (Canada)
Richard Moon
SungardHE (USA)
Mike Parkhill
Desire2learn (Canada)
Colin Smythe
IMS Global Learning Consortium, Inc.
Reihold Staudinger
Blackboard (USA)
Nick Terrible
University of Wisconsin (USA)
Jason Zhong
SungardHE (USA)

top | toc

Revision History

Version No.
Release Date
Comments
Public Draft v1.0
30 June 2011
The first formal release of the Public Draft version of this document.






top | toc

IMS Global Learning Consortium, Inc. (“IMS GLC”) is publishing the information contained in this document (“Specification”) for purposes of scientific, experimental, and scholarly collaboration only.

IMS GLC makes no warranty or representation regarding the accuracy or completeness of the Specification.

This material is provided on an “As Is” and “As Available” basis.

The Specification is at all times subject to change and revision without notice.

It is your sole responsibility to evaluate the usefulness, accuracy, and completeness of the Specification as it relates to you.

IMS GLC would appreciate receiving your comments and suggestions.

Please contact IMS GLC through our website at http://www.imsglobal.org.

Please refer to Document Name: IMS GLC OMS v1.0 WSDL/XSD Binding Final Release v1.0
Date: 30 June 2011.