Showing:

Annotations
Diagrams
Facets
Instances
Properties
Source
Used by

5.1 Service Data Model XSD Documentation

Group by:

http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0

Elements
Main schema GroupManagementServiceSyncXSD.xsd
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Annotations
XSD Data File Information
            Author:         Colin Smythe
            Date:           31st May, 2011
            Version:        Final 1.0
            Status:         Final Release
            Description:    The service realisation of the Group Management Service.  The core data model consists 
                            of: GroupRecord, Group, GroupType and Relationship.  A Group is a model of some collective 
                            activity, with the exception of Course representation.

            History:        Version 1.0: The first formal release of this PSM binding. This binding replaces the IMS GLC GMS v1.0 specification.

            License:        IPR, License and Distribution Notices

                            This machine readable file is derived from IMS Global Learning Consortium (GLC) specification IMS [spec name] Version [x.x]
                            found at http://www.imsglobal.org/[xxx] and the original IMS GLC schema binding or code base
                            http://www.imsglobal.org/[binding document].

                            Recipients of this document are requested to submit, with their comments, notification of any
                            relevant patent claims or other intellectual property rights of which they may be aware that might be
                            infringed by the schema binding contained in this document.

                            IMS GLC takes no position regarding the validity or scope of any intellectual property or other
                            rights that might be claimed to pertain to the implementation or use of the technology described in this
                            document or the extent to which any license under such rights might or might not be available; neither
                            does it represent that it has made any effort to identify any such rights. Information on IMS GLCs
                            procedures with respect to rights in IMS GLC specifications can be found at the IMS GLC Intellectual Property
                            Rights web page: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf.

                            Copyright (c) IMS Global Learning Consortium 1999-2011. All Rights Reserved.

                            License Notice for Users

                            Users of products or services that include this document are hereby granted a worldwide, royalty-free, 
                            non-exclusive license to use this document. 

                            Distribution Notice for Developers

                            Developers of products or services that are not original incorporators of this document and 
                            have not changed this document, that is, are distributing a software product that incorporates this 
                            document as is from a third-party source other than IMS, are hereby granted permission to copy,
                            display and distribute the contents of this document in any medium for any purpose without fee or 
                            royalty provided that you include this IPR, License and Distribution notice in its entirety on ALL
                            copies, or portions thereof.

                            Developers of products or services that are original incorporators of this document and wish 
                            to provide distribution of this document as is or with modifications and developers of products and 
                            services that are not original incorporators of this document and have changed this document, are
                            required to register with the IMS GLC community on the IMS GLC website as described in the following two
                            paragraphs:-

                            *  If you wish to distribute this document as is, with no modifications, you are hereby granted 
                               permission to copy, display and distribute the contents of this document in any medium for any 
                               purpose without fee or royalty provided that you include this IPR, License and Distribution notice in
                               its entirety on ALL copies, or portions thereof, that you make and you complete a valid license 
                               registration with IMS and receive an email from IMS granting the license. To register, follow the 
                               instructions on the IMS website: http://www.imsglobal.org/specificationdownload.cfm. Once 
                               registered you are granted permission to transfer unlimited distribution rights of this document for the 
                               purposes of third-party or other distribution of your product or service that incorporates this 
                               document as long as this IPR, License and Distribution notice remains in place in its entirety; 

                            *  If you wish to create and distribute a derived work from this document, you are hereby 
                               granted permission to copy, display and distribute the contents of the derived work in any medium for 
                               any purpose without fee or royalty provided that you include this IPR, License and Distribution 
                               notice in its entirety on ALL copies, or portions thereof, that you make and you complete a valid 
                               profile registration with IMS GLC and receive an email from IMS GLC granting the license. To register, follow
                               the instructions on the IMS GLC website: http://www.imsglobal.org/profile/. Once registered you are 
                               granted permission to transfer unlimited distribution rights of the derived work for the purposes of 
                               third-party or other distribution of your product or service that incorporates the derived work as long 
                               as this IPR, License and Distribution notice remains in place in its entirety. 

                            The limited permissions granted above are perpetual and will not be revoked by IMS GLC or its 
                            successors or assigns.

                            THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS
                            EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTERS OWN RISK, AND NEITHER THE CONSORTIUM
                            NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF
                            ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION.

            UML Source Service File Information
            Choreography:     Sync
            Status Object:    StatusInfo

            Source UML File Information
            The source file information must be supplied as an XMI file (without diagram layout information).
            The supported UML authoring tools are:
            (a) Poseidon – v6 (and later)

            Source XSLT File Information
            XSL Generator:    UMLtoWSDLTransformv0p9p5.xsl
            XSLT Processor:   Xalan
            Release:          1.0 Beta 4
            Date:             31st March, 2011

            IMS GLC Auto-generation Binding Tool-kit (I-BAT)
            This file was auto-generated using the IMS GLC Binding Auto-generation Tool-kit (I-BAT).  While every
            attempt has been made to ensure that this tool auto-generates the files correctly, users should be aware
            that this is an experimental tool.  Permission is given to make use of this tool.  IMS GLC makes no
            claim on the materials created by third party users of this tool.  Details on how to use this tool
            are contained in the IMS GLC "I-BAT" Documentation available at the IMS GLC web-site.

            Tool Copyright:  2005-2011 (c) IMS Global Learning Consortium Inc.  All Rights Reserved.
Properties
attribute form default: unqualified
element form default: qualified
version: IMS GMS 2.0
[ top ]
Element gms:relation
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#Relation.Type
Type gms:Relation.Type
Properties
content: simple
Facets
enumeration Parent
enumeration Child
enumeration Sibling
enumeration TemplateParent
enumeration SectionChild
Used by
Complex Type gms:Relationship.Type
Source
<xs:element name="relation" type="gms:Relation.Type"/>
[ top ]
Element gms:imsx_codeMajor
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#imsx_CodeMajor.Type
Type gms:imsx_CodeMajor.Type
Properties
content: simple
Facets
enumeration success
enumeration processing
enumeration failure
enumeration unsupported
Used by
Source
<xs:element name="imsx_codeMajor" type="gms:imsx_CodeMajor.Type"/>
[ top ]
Element gms:imsx_severity
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#imsx_Severity.Type
Type gms:imsx_Severity.Type
Properties
content: simple
Facets
enumeration status
enumeration warning
enumeration error
Used by
Source
<xs:element name="imsx_severity" type="gms:imsx_Severity.Type"/>
[ top ]
Element gms:imsx_codeMinorFieldValue
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#imsx_CodeMinorValue.Type
Type gms:imsx_CodeMinorValue.Type
Properties
content: simple
Facets
enumeration fullsuccess
enumeration createsuccess
enumeration nosourcedids
enumeration idalloc
enumeration overflowfail
enumeration idallocinusefail
enumeration invaliddata
enumeration incompletedata
enumeration partialdatastorage
enumeration unknownobject
enumeration deletefailure
enumeration targetreadfailure
enumeration savepointerror
enumeration savepointsyncerror
enumeration toomuchdata
enumeration unknownquery
enumeration unknownvocabulary
enumeration unknownmdvocabulary
enumeration unknowngtvocabulary
enumeration unknownextension
enumeration targetisbusy
enumeration unauthorizedrequest
enumeration linkfailure
enumeration unsupportedLIS
enumeration unsupportedLISoperation
Used by
Source
<xs:element name="imsx_codeMinorFieldValue" type="gms:imsx_CodeMinorValue.Type"/>
[ top ]
Element gms:mediamode
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#MediaMode.Type
Type gms:MediaMode.Type
Properties
content: simple
Facets
enumeration uri
enumeration entityref
enumeration base64
Used by
Source
<xs:element name="mediamode" type="gms:MediaMode.Type"/>
[ top ]
Element gms:contentRefType
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#ContentRefType.Type
Type gms:ContentRefType.Type
Properties
content: simple
Facets
enumeration text
enumeration image
enumeration audio
enumeration video
enumeration application
enumeration applet
Used by
Source
<xs:element name="contentRefType" type="gms:ContentRefType.Type"/>
[ top ]
Element gms:begin
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:dateTime
Properties
content: simple
Used by
Complex Type gms:TimeFrame.Type
Source
<xs:element name="begin" type="xs:dateTime"/>
[ top ]
Element gms:descriptionText
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:string
Properties
content: simple
Used by
Source
<xs:element name="descriptionText" type="xs:string"/>
[ top ]
Element gms:email
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#Email.Type
Type gms:Email.Type
Properties
content: simple
Facets
whiteSpace preserve
minLength 1
maxLength 4096
Used by
Complex Type gms:Group.Type
Source
<xs:element name="email" type="gms:Email.Type"/>
[ top ]
Element gms:end
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:dateTime
Properties
content: simple
Used by
Complex Type gms:TimeFrame.Type
Source
<xs:element name="end" type="xs:dateTime"/>
[ top ]
Element gms:enrollAccept
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:boolean
Properties
content: simple
Used by
Complex Type gms:EnrollControl.Type
Source
<xs:element name="enrollAccept" type="xs:boolean"/>
[ top ]
Element gms:enrollAllowed
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:boolean
Properties
content: simple
Used by
Complex Type gms:EnrollControl.Type
Source
<xs:element name="enrollAllowed" type="xs:boolean"/>
[ top ]
Element gms:extensionNameVocabulary
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:anyURI
Properties
content: simple
Used by
Complex Type gms:IMSExtension.Type
Source
<xs:element name="extensionNameVocabulary" type="xs:anyURI"/>
[ top ]
Element gms:extensionTypeVocabulary
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:anyURI
Properties
content: simple
Used by
Complex Type gms:IMSExtension.Type
Source
<xs:element name="extensionTypeVocabulary" type="xs:anyURI"/>
[ top ]
Element gms:fieldName
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:normalizedString
Properties
content: simple
Used by
Source
<xs:element name="fieldName" type="xs:normalizedString"/>
[ top ]
Element gms:fieldType
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:normalizedString
Properties
content: simple
Used by
Source
<xs:element name="fieldType" type="xs:normalizedString"/>
[ top ]
Element gms:fieldValue
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:normalizedString
Properties
content: simple
Used by
Source
<xs:element name="fieldValue" type="xs:normalizedString"/>
[ top ]
Element gms:imsx_codeMinorFieldName
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:string
Properties
content: simple
default: TargetEndSystem
Used by
Source
<xs:element name="imsx_codeMinorFieldName" type="xs:string" default="TargetEndSystem"/>
[ top ]
Element gms:imsx_description
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:string
Properties
content: simple
Used by
Source
<xs:element name="imsx_description" type="xs:string"/>
[ top ]
Element gms:imsx_messageIdentifier
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:string
Properties
content: simple
Used by
Source
<xs:element name="imsx_messageIdentifier" type="xs:string"/>
[ top ]
Element gms:imsx_messageRefIdentifier
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:string
Properties
content: simple
Used by
Source
<xs:element name="imsx_messageRefIdentifier" type="xs:string"/>
[ top ]
Element gms:imsx_operationRefIdentifier
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:string
Properties
content: simple
Used by
Source
<xs:element name="imsx_operationRefIdentifier" type="xs:string"/>
[ top ]
Element gms:imsx_version
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:string
Properties
content: simple
default: V1.0
Used by
Source
<xs:element name="imsx_version" type="xs:string" default="V1.0"/>
[ top ]
Element gms:language
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:normalizedString
Properties
content: simple
Used by
Complex Type gms:Text.Type
Source
<xs:element name="language" type="xs:normalizedString"/>
[ top ]
Element gms:longDescription
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:string
Properties
content: simple
Used by
Complex Type gms:Description.Type
Source
<xs:element name="longDescription" type="xs:string"/>
[ top ]
Element gms:metadataNameVocabulary
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:anyURI
Properties
content: simple
Used by
Complex Type gms:Metadata.Type
Source
<xs:element name="metadataNameVocabulary" type="xs:anyURI"/>
[ top ]
Element gms:metadataTypeVocabulary
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:anyURI
Properties
content: simple
Used by
Complex Type gms:Metadata.Type
Source
<xs:element name="metadataTypeVocabulary" type="xs:anyURI"/>
[ top ]
Element gms:mimeType
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:normalizedString
Properties
content: simple
Used by
Source
<xs:element name="mimeType" type="xs:normalizedString"/>
[ top ]
Element gms:refAgentInstanceID
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:normalizedString
Properties
content: simple
Used by
Complex Type gms:SourcedGUID.Type
Source
<xs:element name="refAgentInstanceID" type="xs:normalizedString"/>
[ top ]
Element gms:restrict
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:boolean
Properties
content: simple
Used by
Complex Type gms:TimeFrame.Type
Source
<xs:element name="restrict" type="xs:boolean"/>
[ top ]
Element gms:shortDescription
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:string
Properties
content: simple
Used by
Complex Type gms:Description.Type
Source
<xs:element name="shortDescription" type="xs:string"/>
[ top ]
Element gms:textString
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type xs:string
Properties
content: simple
Used by
Complex Type gms:Text.Type
Source
<xs:element name="textString" type="xs:string"/>
[ top ]
Element gms:url
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#URL.Type
Type gms:URL.Type
Properties
content: simple
Facets
whiteSpace preserve
minLength 1
maxLength 4096
Used by
Complex Type gms:Group.Type
Source
<xs:element name="url" type="gms:URL.Type"/>
[ top ]
Element gms:fullDescription
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#mediamode GroupManagementServiceSyncXSD.tmp#contentRefType GroupManagementServiceSyncXSD.tmp#mimeType GroupManagementServiceSyncXSD.tmp#descriptionText GroupManagementServiceSyncXSD.tmp#FullDescription.Type
Type gms:FullDescription.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:Description.Type
Model gms:mediamode , gms:contentRefType , gms:mimeType , gms:descriptionText
Children gms:contentRefType, gms:descriptionText, gms:mediamode, gms:mimeType
Instance
<gms:fullDescription>
  <gms:mediamode>{1,1}</gms:mediamode>
  <gms:contentRefType>{1,1}</gms:contentRefType>
  <gms:mimeType>{1,1}</gms:mimeType>
  <gms:descriptionText>{1,1}</gms:descriptionText>
</gms:fullDescription>
Source
<xs:element name="fullDescription" type="gms:FullDescription.Type"/>
[ top ]
Element gms:groupType
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#scheme GroupManagementServiceSyncXSD.tmp#typevalue GroupManagementServiceSyncXSD.tmp#GroupType.Type
Type gms:GroupType.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:Group.Type
Model gms:scheme , gms:typevalue+
Children gms:scheme, gms:typevalue
Instance
<gms:groupType>
  <gms:scheme>{1,1}</gms:scheme>
  <gms:typevalue>{1,unbounded}</gms:typevalue>
</gms:groupType>
Source
<xs:element name="groupType" type="gms:GroupType.Type"/>
[ top ]
Element gms:scheme
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#language GroupManagementServiceSyncXSD.tmp#textString GroupManagementServiceSyncXSD.tmp#Text.Type
Type gms:Text.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:GroupType.Type
Model gms:language , gms:textString
Children gms:language, gms:textString
Instance
<gms:scheme>
  <gms:language>{1,1}</gms:language>
  <gms:textString>{1,1}</gms:textString>
</gms:scheme>
Source
<xs:element name="scheme" type="gms:Text.Type"/>
[ top ]
Element gms:typevalue
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#id GroupManagementServiceSyncXSD.tmp#type GroupManagementServiceSyncXSD.tmp#level GroupManagementServiceSyncXSD.tmp#TypeValue.Type
Type gms:TypeValue.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:GroupType.Type
Model gms:id , gms:type , gms:level
Children gms:id, gms:level, gms:type
Instance
<gms:typevalue>
  <gms:id>{1,1}</gms:id>
  <gms:type>{1,1}</gms:type>
  <gms:level>{1,1}</gms:level>
</gms:typevalue>
Source
<xs:element name="typevalue" type="gms:TypeValue.Type"/>
[ top ]
Element gms:id
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#language GroupManagementServiceSyncXSD.tmp#textString GroupManagementServiceSyncXSD.tmp#Text.Type
Type gms:Text.Type
Properties
content: complex
mixed: false
Used by
Model gms:language , gms:textString
Children gms:language, gms:textString
Instance
<gms:id>
  <gms:language>{1,1}</gms:language>
  <gms:textString>{1,1}</gms:textString>
</gms:id>
Source
<xs:element name="id" type="gms:Text.Type"/>
[ top ]
Element gms:type
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#language GroupManagementServiceSyncXSD.tmp#textString GroupManagementServiceSyncXSD.tmp#Text.Type
Type gms:Text.Type
Properties
content: complex
mixed: false
Used by
Model gms:language , gms:textString
Children gms:language, gms:textString
Instance
<gms:type>
  <gms:language>{1,1}</gms:language>
  <gms:textString>{1,1}</gms:textString>
</gms:type>
Source
<xs:element name="type" type="gms:Text.Type"/>
[ top ]
Element gms:level
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#language GroupManagementServiceSyncXSD.tmp#textString GroupManagementServiceSyncXSD.tmp#Text.Type
Type gms:Text.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:TypeValue.Type
Model gms:language , gms:textString
Children gms:language, gms:textString
Instance
<gms:level>
  <gms:language>{1,1}</gms:language>
  <gms:textString>{1,1}</gms:textString>
</gms:level>
Source
<xs:element name="level" type="gms:Text.Type"/>
[ top ]
Element gms:timeframe
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#begin GroupManagementServiceSyncXSD.tmp#end GroupManagementServiceSyncXSD.tmp#restrict GroupManagementServiceSyncXSD.tmp#adminPeriod GroupManagementServiceSyncXSD.tmp#TimeFrame.Type
Type gms:TimeFrame.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:Group.Type
Model gms:begin{0,1} , gms:end{0,1} , gms:restrict{0,1} , gms:adminPeriod{0,1}
Children gms:adminPeriod, gms:begin, gms:end, gms:restrict
Instance
<gms:timeframe>
  <gms:begin>{0,1}</gms:begin>
  <gms:end>{0,1}</gms:end>
  <gms:restrict>{0,1}</gms:restrict>
  <gms:adminPeriod>{0,1}</gms:adminPeriod>
</gms:timeframe>
Source
<xs:element name="timeframe" type="gms:TimeFrame.Type"/>
[ top ]
Element gms:adminPeriod
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#language GroupManagementServiceSyncXSD.tmp#textString GroupManagementServiceSyncXSD.tmp#Text.Type
Type gms:Text.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:TimeFrame.Type
Model gms:language , gms:textString
Children gms:language, gms:textString
Instance
<gms:adminPeriod>
  <gms:language>{1,1}</gms:language>
  <gms:textString>{1,1}</gms:textString>
</gms:adminPeriod>
Source
<xs:element name="adminPeriod" type="gms:Text.Type"/>
[ top ]
Element gms:relationship
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#relationId GroupManagementServiceSyncXSD.tmp#relation GroupManagementServiceSyncXSD.tmp#sourcedId GroupManagementServiceSyncXSD.tmp#label GroupManagementServiceSyncXSD.tmp#Relationship.Type
Type gms:Relationship.Type
Properties
content: complex
mixed: false
Used by
Model gms:relationId , gms:relation , gms:sourcedId , gms:label
Children gms:label, gms:relation, gms:relationId, gms:sourcedId
Instance
<gms:relationship>
  <gms:relationId>{1,1}</gms:relationId>
  <gms:relation>{1,1}</gms:relation>
  <gms:sourcedId>{1,1}</gms:sourcedId>
  <gms:label>{1,1}</gms:label>
</gms:relationship>
Source
<xs:element name="relationship" type="gms:Relationship.Type"/>
[ top ]
Element gms:relationId
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#GUID.Type
Type gms:GUID.Type
Properties
content: simple
Used by
Source
<xs:element name="relationId" type="gms:GUID.Type"/>
[ top ]
Element gms:sourcedId
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#GUID.Type
Type gms:GUID.Type
Properties
content: simple
Used by
Source
<xs:element name="sourcedId" type="gms:GUID.Type"/>
[ top ]
Element gms:label
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#language GroupManagementServiceSyncXSD.tmp#textString GroupManagementServiceSyncXSD.tmp#Text.Type
Type gms:Text.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:Relationship.Type
Model gms:language , gms:textString
Children gms:language, gms:textString
Instance
<gms:label>
  <gms:language>{1,1}</gms:language>
  <gms:textString>{1,1}</gms:textString>
</gms:label>
Source
<xs:element name="label" type="gms:Text.Type"/>
[ top ]
Element gms:enrollControl
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#enrollAccept GroupManagementServiceSyncXSD.tmp#enrollAllowed GroupManagementServiceSyncXSD.tmp#EnrollControl.Type
Type gms:EnrollControl.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:Group.Type
Model gms:enrollAccept{0,1} , gms:enrollAllowed{0,1}
Children gms:enrollAccept, gms:enrollAllowed
Instance
<gms:enrollControl>
  <gms:enrollAccept>{0,1}</gms:enrollAccept>
  <gms:enrollAllowed>{0,1}</gms:enrollAllowed>
</gms:enrollControl>
Source
<xs:element name="enrollControl" type="gms:EnrollControl.Type"/>
[ top ]
Element gms:org
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#orgName GroupManagementServiceSyncXSD.tmp#orgUnit GroupManagementServiceSyncXSD.tmp#type GroupManagementServiceSyncXSD.tmp#id GroupManagementServiceSyncXSD.tmp#Org.Type
Type gms:Org.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:Group.Type
Model gms:orgName{0,1} , gms:orgUnit{0,1} , gms:type{0,1} , gms:id{0,1}
Children gms:id, gms:orgName, gms:orgUnit, gms:type
Instance
<gms:org>
  <gms:orgName>{0,1}</gms:orgName>
  <gms:orgUnit>{0,1}</gms:orgUnit>
  <gms:type>{0,1}</gms:type>
  <gms:id>{0,1}</gms:id>
</gms:org>
Source
<xs:element name="org" type="gms:Org.Type"/>
[ top ]
Element gms:orgName
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#language GroupManagementServiceSyncXSD.tmp#textString GroupManagementServiceSyncXSD.tmp#Text.Type
Type gms:Text.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:Org.Type
Model gms:language , gms:textString
Children gms:language, gms:textString
Instance
<gms:orgName>
  <gms:language>{1,1}</gms:language>
  <gms:textString>{1,1}</gms:textString>
</gms:orgName>
Source
<xs:element name="orgName" type="gms:Text.Type"/>
[ top ]
Element gms:orgUnit
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#language GroupManagementServiceSyncXSD.tmp#textString GroupManagementServiceSyncXSD.tmp#Text.Type
Type gms:Text.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:Org.Type
Model gms:language , gms:textString
Children gms:language, gms:textString
Instance
<gms:orgUnit>
  <gms:language>{1,1}</gms:language>
  <gms:textString>{1,1}</gms:textString>
</gms:orgUnit>
Source
<xs:element name="orgUnit" type="gms:Text.Type"/>
[ top ]
Element gms:description
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#shortDescription GroupManagementServiceSyncXSD.tmp#longDescription GroupManagementServiceSyncXSD.tmp#fullDescription GroupManagementServiceSyncXSD.tmp#Description.Type
Type gms:Description.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:Group.Type
Model gms:shortDescription , gms:longDescription{0,1} , gms:fullDescription{0,1}
Children gms:fullDescription, gms:longDescription, gms:shortDescription
Instance
<gms:description>
  <gms:shortDescription>{1,1}</gms:shortDescription>
  <gms:longDescription>{0,1}</gms:longDescription>
  <gms:fullDescription>{0,1}</gms:fullDescription>
</gms:description>
Source
<xs:element name="description" type="gms:Description.Type"/>
[ top ]
Element gms:dataSource
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#GUID.Type
Type gms:GUID.Type
Properties
content: simple
Used by
Complex Type gms:Group.Type
Source
<xs:element name="dataSource" type="gms:GUID.Type"/>
[ top ]
Element gms:recordInfo
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#metadataNameVocabulary GroupManagementServiceSyncXSD.tmp#metadataTypeVocabulary GroupManagementServiceSyncXSD.tmp#metadataField GroupManagementServiceSyncXSD.tmp#Metadata.Type
Type gms:Metadata.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:Group.Type
Model gms:metadataNameVocabulary , gms:metadataTypeVocabulary , gms:metadataField+
Children gms:metadataField, gms:metadataNameVocabulary, gms:metadataTypeVocabulary
Instance
<gms:recordInfo>
  <gms:metadataNameVocabulary>{1,1}</gms:metadataNameVocabulary>
  <gms:metadataTypeVocabulary>{1,1}</gms:metadataTypeVocabulary>
  <gms:metadataField>{1,unbounded}</gms:metadataField>
</gms:recordInfo>
Source
<xs:element name="recordInfo" type="gms:Metadata.Type"/>
[ top ]
Element gms:metadataField
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#fieldName GroupManagementServiceSyncXSD.tmp#fieldType GroupManagementServiceSyncXSD.tmp#fieldValue GroupManagementServiceSyncXSD.tmp#ExtensionField.Type
Type gms:ExtensionField.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:Metadata.Type
Model gms:fieldName , gms:fieldType , gms:fieldValue
Children gms:fieldName, gms:fieldType, gms:fieldValue
Instance
<gms:metadataField>
  <gms:fieldName>{1,1}</gms:fieldName>
  <gms:fieldType>{1,1}</gms:fieldType>
  <gms:fieldValue>{1,1}</gms:fieldValue>
</gms:metadataField>
Source
<xs:element name="metadataField" type="gms:ExtensionField.Type"/>
[ top ]
Element gms:extension
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#extensionNameVocabulary GroupManagementServiceSyncXSD.tmp#extensionTypeVocabulary GroupManagementServiceSyncXSD.tmp#extensionField GroupManagementServiceSyncXSD.tmp#IMSExtension.Type
Type gms:IMSExtension.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:Group.Type
Model gms:extensionNameVocabulary , gms:extensionTypeVocabulary , gms:extensionField+
Children gms:extensionField, gms:extensionNameVocabulary, gms:extensionTypeVocabulary
Instance
<gms:extension>
  <gms:extensionNameVocabulary>{1,1}</gms:extensionNameVocabulary>
  <gms:extensionTypeVocabulary>{1,1}</gms:extensionTypeVocabulary>
  <gms:extensionField>{1,unbounded}</gms:extensionField>
</gms:extension>
Source
<xs:element name="extension" type="gms:IMSExtension.Type"/>
[ top ]
Element gms:extensionField
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#fieldName GroupManagementServiceSyncXSD.tmp#fieldType GroupManagementServiceSyncXSD.tmp#fieldValue GroupManagementServiceSyncXSD.tmp#ExtensionField.Type
Type gms:ExtensionField.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:IMSExtension.Type
Model gms:fieldName , gms:fieldType , gms:fieldValue
Children gms:fieldName, gms:fieldType, gms:fieldValue
Instance
<gms:extensionField>
  <gms:fieldName>{1,1}</gms:fieldName>
  <gms:fieldType>{1,1}</gms:fieldType>
  <gms:fieldValue>{1,1}</gms:fieldValue>
</gms:extensionField>
Source
<xs:element name="extensionField" type="gms:ExtensionField.Type"/>
[ top ]
Element gms:sourcedGUID
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#refAgentInstanceID GroupManagementServiceSyncXSD.tmp#sourcedId GroupManagementServiceSyncXSD.tmp#SourcedGUID.Type
Type gms:SourcedGUID.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:GroupRecord.Type
Model gms:refAgentInstanceID{0,1} , gms:sourcedId
Children gms:refAgentInstanceID, gms:sourcedId
Instance
<gms:sourcedGUID>
  <gms:refAgentInstanceID>{0,1}</gms:refAgentInstanceID>
  <gms:sourcedId>{1,1}</gms:sourcedId>
</gms:sourcedGUID>
Source
<xs:element name="sourcedGUID" type="gms:SourcedGUID.Type"/>
[ top ]
Element gms:group
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#groupType GroupManagementServiceSyncXSD.tmp#email GroupManagementServiceSyncXSD.tmp#url GroupManagementServiceSyncXSD.tmp#timeframe GroupManagementServiceSyncXSD.tmp#relationship GroupManagementServiceSyncXSD.tmp#enrollControl GroupManagementServiceSyncXSD.tmp#org GroupManagementServiceSyncXSD.tmp#description GroupManagementServiceSyncXSD.tmp#dataSource GroupManagementServiceSyncXSD.tmp#recordInfo GroupManagementServiceSyncXSD.tmp#extension GroupManagementServiceSyncXSD.tmp#Group.Type
Type gms:Group.Type
Properties
content: complex
mixed: false
Used by
Complex Type gms:GroupRecord.Type
Model gms:groupType , gms:email{0,1} , gms:url{0,1} , gms:timeframe{0,1} , gms:relationship* , gms:enrollControl{0,1} , gms:org{0,1} , gms:description{0,1} , gms:dataSource{0,1} , gms:recordInfo{0,1} , gms:extension{0,1}
Children gms:dataSource, gms:description, gms:email, gms:enrollControl, gms:extension, gms:groupType, gms:org, gms:recordInfo, gms:relationship, gms:timeframe, gms:url
Instance
<gms:group>
  <gms:groupType>{1,1}</gms:groupType>
  <gms:email>{0,1}</gms:email>
  <gms:url>{0,1}</gms:url>
  <gms:timeframe>{0,1}</gms:timeframe>
  <gms:relationship>{0,unbounded}</gms:relationship>
  <gms:enrollControl>{0,1}</gms:enrollControl>
  <gms:org>{0,1}</gms:org>
  <gms:description>{0,1}</gms:description>
  <gms:dataSource>{0,1}</gms:dataSource>
  <gms:recordInfo>{0,1}</gms:recordInfo>
  <gms:extension>{0,1}</gms:extension>
</gms:group>
Source
<xs:element name="group" type="gms:Group.Type"/>
[ top ]
Element gms:groupRecord
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#sourcedGUID GroupManagementServiceSyncXSD.tmp#group GroupManagementServiceSyncXSD.tmp#GroupRecord.Type
Type gms:GroupRecord.Type
Properties
content: complex
mixed: false
Used by
Model gms:sourcedGUID , gms:group{0,1}
Children gms:group, gms:sourcedGUID
Instance
<gms:groupRecord>
  <gms:sourcedGUID>{1,1}</gms:sourcedGUID>
  <gms:group>{0,1}</gms:group>
</gms:groupRecord>
Source
<xs:element name="groupRecord" type="gms:GroupRecord.Type"/>
[ top ]
Element gms:imsx_codeMinorField
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#imsx_codeMinorFieldName GroupManagementServiceSyncXSD.tmp#imsx_codeMinorFieldValue GroupManagementServiceSyncXSD.tmp#imsx_CodeMinorField.Type
Type gms:imsx_CodeMinorField.Type
Properties
content: complex
mixed: false
Used by
Model gms:imsx_codeMinorFieldName , gms:imsx_codeMinorFieldValue
Children gms:imsx_codeMinorFieldName, gms:imsx_codeMinorFieldValue
Instance
<gms:imsx_codeMinorField>
  <gms:imsx_codeMinorFieldName>{1,1}</gms:imsx_codeMinorFieldName>
  <gms:imsx_codeMinorFieldValue>{1,1}</gms:imsx_codeMinorFieldValue>
</gms:imsx_codeMinorField>
Source
<xs:element name="imsx_codeMinorField" type="gms:imsx_CodeMinorField.Type"/>
[ top ]
Element gms:imsx_statusInfo
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#imsx_codeMajor GroupManagementServiceSyncXSD.tmp#imsx_severity GroupManagementServiceSyncXSD.tmp#imsx_messageRefIdentifier GroupManagementServiceSyncXSD.tmp#imsx_operationRefIdentifier GroupManagementServiceSyncXSD.tmp#imsx_description GroupManagementServiceSyncXSD.tmp#imsx_codeMinor GroupManagementServiceSyncXSD.tmp#imsx_StatusInfo.Type
Type gms:imsx_StatusInfo.Type
Properties
content: complex
mixed: false
Used by
Model gms:imsx_codeMajor , gms:imsx_severity , gms:imsx_messageRefIdentifier , gms:imsx_operationRefIdentifier* , gms:imsx_description{0,1} , gms:imsx_codeMinor{0,1}
Children gms:imsx_codeMajor, gms:imsx_codeMinor, gms:imsx_description, gms:imsx_messageRefIdentifier, gms:imsx_operationRefIdentifier, gms:imsx_severity
Instance
<gms:imsx_statusInfo>
  <gms:imsx_codeMajor>{1,1}</gms:imsx_codeMajor>
  <gms:imsx_severity>{1,1}</gms:imsx_severity>
  <gms:imsx_messageRefIdentifier>{1,1}</gms:imsx_messageRefIdentifier>
  <gms:imsx_operationRefIdentifier>{0,unbounded}</gms:imsx_operationRefIdentifier>
  <gms:imsx_description>{0,1}</gms:imsx_description>
  <gms:imsx_codeMinor>{0,1}</gms:imsx_codeMinor>
</gms:imsx_statusInfo>
Source
<xs:element name="imsx_statusInfo" type="gms:imsx_StatusInfo.Type"/>
[ top ]
Element gms:imsx_codeMinor
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#imsx_codeMinorField GroupManagementServiceSyncXSD.tmp#imsx_CodeMinor.Type
Type gms:imsx_CodeMinor.Type
Properties
content: complex
mixed: false
Used by
Model gms:imsx_codeMinorField+
Children gms:imsx_codeMinorField
Instance
<gms:imsx_codeMinor>
  <gms:imsx_codeMinorField>{1,unbounded}</gms:imsx_codeMinorField>
</gms:imsx_codeMinor>
Source
<xs:element name="imsx_codeMinor" type="gms:imsx_CodeMinor.Type"/>
[ top ]
Element gms:sourcedIdSet
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#sourcedId GroupManagementServiceSyncXSD.tmp#GUIDSet.Type
Type gms:GUIDSet.Type
Properties
content: complex
mixed: false
Used by
Model gms:sourcedId*
Children gms:sourcedId
Instance
<gms:sourcedIdSet>
  <gms:sourcedId>{0,unbounded}</gms:sourcedId>
</gms:sourcedIdSet>
Source
<xs:element name="sourcedIdSet" type="gms:GUIDSet.Type"/>
[ top ]
Element gms:personSourcedId
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#GUID.Type
Type gms:GUID.Type
Properties
content: simple
Used by
Source
<xs:element name="personSourcedId" type="gms:GUID.Type"/>
[ top ]
Element gms:groupsIdentifierSet
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#sourcedId GroupManagementServiceSyncXSD.tmp#GUIDSet.Type
Type gms:GUIDSet.Type
Properties
content: complex
mixed: false
Used by
Model gms:sourcedId*
Children gms:sourcedId
Instance
<gms:groupsIdentifierSet>
  <gms:sourcedId>{0,unbounded}</gms:sourcedId>
</gms:groupsIdentifierSet>
Source
<xs:element name="groupsIdentifierSet" type="gms:GUIDSet.Type"/>
[ top ]
Element gms:fromSavePoint
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#SequenceIdentifier.Type
Type gms:SequenceIdentifier.Type
Properties
content: simple
Used by
Source
<xs:element name="fromSavePoint" type="gms:SequenceIdentifier.Type"/>
[ top ]
Element gms:savePoint
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#SequenceIdentifier.Type
Type gms:SequenceIdentifier.Type
Properties
content: simple
Used by
Source
<xs:element name="savePoint" type="gms:SequenceIdentifier.Type"/>
[ top ]
Element gms:groupRecordSet
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#groupRecord GroupManagementServiceSyncXSD.tmp#GroupRecordSet.Type
Type gms:GroupRecordSet.Type
Properties
content: complex
mixed: false
Used by
Model gms:groupRecord*
Children gms:groupRecord
Instance
<gms:groupRecordSet>
  <gms:groupRecord>{0,unbounded}</gms:groupRecord>
</gms:groupRecordSet>
Source
<xs:element name="groupRecordSet" type="gms:GroupRecordSet.Type"/>
[ top ]
Element gms:queryObject
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#QueryObject.Type
Type gms:QueryObject.Type
Properties
content: simple
Used by
Source
<xs:element name="queryObject" type="gms:QueryObject.Type"/>
[ top ]
Element gms:newSourcedId
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#GUID.Type
Type gms:GUID.Type
Properties
content: simple
Used by
Source
<xs:element name="newSourcedId" type="gms:GUID.Type"/>
[ top ]
Element gms:createGroupRequest
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#sourcedId GroupManagementServiceSyncXSD.tmp#groupRecord
Properties
content: complex
Model gms:sourcedId , gms:groupRecord
Children gms:groupRecord, gms:sourcedId
Instance
<gms:createGroupRequest>
  <gms:sourcedId>{1,1}</gms:sourcedId>
  <gms:groupRecord>{1,1}</gms:groupRecord>
</gms:createGroupRequest>
Source
<xs:element name="createGroupRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:sourcedId"/>
      <xs:element ref="gms:groupRecord"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:createGroupResponse
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Properties
content: complex
Source
<xs:element name="createGroupResponse">
  <xs:complexType/>
</xs:element>
[ top ]
Element gms:createByProxyGroupRequest
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#groupRecord
Properties
content: complex
Model gms:groupRecord
Children gms:groupRecord
Instance
<gms:createByProxyGroupRequest>
  <gms:groupRecord>{1,1}</gms:groupRecord>
</gms:createByProxyGroupRequest>
Source
<xs:element name="createByProxyGroupRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:groupRecord"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:createByProxyGroupResponse
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#sourcedId
Properties
content: complex
Model gms:sourcedId{0,1}
Children gms:sourcedId
Instance
<gms:createByProxyGroupResponse>
  <gms:sourcedId>{0,1}</gms:sourcedId>
</gms:createByProxyGroupResponse>
Source
<xs:element name="createByProxyGroupResponse">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:sourcedId" minOccurs="0" maxOccurs="1"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:deleteGroupRequest
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#sourcedId
Properties
content: complex
Model gms:sourcedId
Children gms:sourcedId
Instance
<gms:deleteGroupRequest>
  <gms:sourcedId>{1,1}</gms:sourcedId>
</gms:deleteGroupRequest>
Source
<xs:element name="deleteGroupRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:sourcedId"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:deleteGroupResponse
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Properties
content: complex
Source
<xs:element name="deleteGroupResponse">
  <xs:complexType/>
</xs:element>
[ top ]
Element gms:addGroupRelationshipRequest
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#sourcedId GroupManagementServiceSyncXSD.tmp#relationship
Properties
content: complex
Model gms:sourcedId , gms:relationship
Children gms:relationship, gms:sourcedId
Instance
<gms:addGroupRelationshipRequest>
  <gms:sourcedId>{1,1}</gms:sourcedId>
  <gms:relationship>{1,1}</gms:relationship>
</gms:addGroupRelationshipRequest>
Source
<xs:element name="addGroupRelationshipRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:sourcedId"/>
      <xs:element ref="gms:relationship"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:addGroupRelationshipResponse
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Properties
content: complex
Source
<xs:element name="addGroupRelationshipResponse">
  <xs:complexType/>
</xs:element>
[ top ]
Element gms:removeGroupRelationshipRequest
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#sourcedId GroupManagementServiceSyncXSD.tmp#relationId
Properties
content: complex
Model gms:sourcedId , gms:relationId
Children gms:relationId, gms:sourcedId
Instance
<gms:removeGroupRelationshipRequest>
  <gms:sourcedId>{1,1}</gms:sourcedId>
  <gms:relationId>{1,1}</gms:relationId>
</gms:removeGroupRelationshipRequest>
Source
<xs:element name="removeGroupRelationshipRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:sourcedId"/>
      <xs:element ref="gms:relationId"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:removeGroupRelationshipResponse
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Properties
content: complex
Source
<xs:element name="removeGroupRelationshipResponse">
  <xs:complexType/>
</xs:element>
[ top ]
Element gms:readGroupRequest
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#sourcedId
Properties
content: complex
Model gms:sourcedId
Children gms:sourcedId
Instance
<gms:readGroupRequest>
  <gms:sourcedId>{1,1}</gms:sourcedId>
</gms:readGroupRequest>
Source
<xs:element name="readGroupRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:sourcedId"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:readGroupResponse
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#groupRecord
Properties
content: complex
Model gms:groupRecord{0,1}
Children gms:groupRecord
Instance
<gms:readGroupResponse>
  <gms:groupRecord>{0,1}</gms:groupRecord>
</gms:readGroupResponse>
Source
<xs:element name="readGroupResponse">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:groupRecord" minOccurs="0" maxOccurs="1"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:readAllGroupIdsRequest
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Properties
content: complex
Source
<xs:element name="readAllGroupIdsRequest">
  <xs:complexType/>
</xs:element>
[ top ]
Element gms:readAllGroupIdsResponse
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#sourcedIdSet
Properties
content: complex
Model gms:sourcedIdSet{0,1}
Children gms:sourcedIdSet
Instance
<gms:readAllGroupIdsResponse>
  <gms:sourcedIdSet>{0,1}</gms:sourcedIdSet>
</gms:readAllGroupIdsResponse>
Source
<xs:element name="readAllGroupIdsResponse">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:sourcedIdSet" minOccurs="0" maxOccurs="1"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:readGroupIdsForPersonRequest
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#personSourcedId
Properties
content: complex
Model gms:personSourcedId
Children gms:personSourcedId
Instance
<gms:readGroupIdsForPersonRequest>
  <gms:personSourcedId>{1,1}</gms:personSourcedId>
</gms:readGroupIdsForPersonRequest>
Source
<xs:element name="readGroupIdsForPersonRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:personSourcedId"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:readGroupIdsForPersonResponse
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#groupsIdentifierSet
Properties
content: complex
Model gms:groupsIdentifierSet{0,1}
Children gms:groupsIdentifierSet
Instance
<gms:readGroupIdsForPersonResponse>
  <gms:groupsIdentifierSet>{0,1}</gms:groupsIdentifierSet>
</gms:readGroupIdsForPersonResponse>
Source
<xs:element name="readGroupIdsForPersonResponse">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:groupsIdentifierSet" minOccurs="0" maxOccurs="1"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:readGroupIdsFromSavePointRequest
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#fromSavePoint
Properties
content: complex
Model gms:fromSavePoint
Children gms:fromSavePoint
Instance
<gms:readGroupIdsFromSavePointRequest>
  <gms:fromSavePoint>{1,1}</gms:fromSavePoint>
</gms:readGroupIdsFromSavePointRequest>
Source
<xs:element name="readGroupIdsFromSavePointRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:fromSavePoint"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:readGroupIdsFromSavePointResponse
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#sourcedIdSet GroupManagementServiceSyncXSD.tmp#savePoint
Properties
content: complex
Model gms:sourcedIdSet{0,1} , gms:savePoint{0,1}
Children gms:savePoint, gms:sourcedIdSet
Instance
<gms:readGroupIdsFromSavePointResponse>
  <gms:sourcedIdSet>{0,1}</gms:sourcedIdSet>
  <gms:savePoint>{0,1}</gms:savePoint>
</gms:readGroupIdsFromSavePointResponse>
Source
<xs:element name="readGroupIdsFromSavePointResponse">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:sourcedIdSet" minOccurs="0" maxOccurs="1"/>
      <xs:element ref="gms:savePoint" minOccurs="0" maxOccurs="1"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:readGroupsRequest
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#sourcedIdSet
Properties
content: complex
Model gms:sourcedIdSet
Children gms:sourcedIdSet
Instance
<gms:readGroupsRequest>
  <gms:sourcedIdSet>{1,1}</gms:sourcedIdSet>
</gms:readGroupsRequest>
Source
<xs:element name="readGroupsRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:sourcedIdSet"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:readGroupsResponse
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#groupRecordSet GroupManagementServiceSyncXSD.tmp#savePoint
Properties
content: complex
Model gms:groupRecordSet{0,1} , gms:savePoint{0,1}
Children gms:groupRecordSet, gms:savePoint
Instance
<gms:readGroupsResponse>
  <gms:groupRecordSet>{0,1}</gms:groupRecordSet>
  <gms:savePoint>{0,1}</gms:savePoint>
</gms:readGroupsResponse>
Source
<xs:element name="readGroupsResponse">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:groupRecordSet" minOccurs="0" maxOccurs="1"/>
      <xs:element ref="gms:savePoint" minOccurs="0" maxOccurs="1"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:readGroupsFromSavePointRequest
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#fromSavePoint
Properties
content: complex
Model gms:fromSavePoint
Children gms:fromSavePoint
Instance
<gms:readGroupsFromSavePointRequest>
  <gms:fromSavePoint>{1,1}</gms:fromSavePoint>
</gms:readGroupsFromSavePointRequest>
Source
<xs:element name="readGroupsFromSavePointRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:fromSavePoint"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:readGroupsFromSavePointResponse
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#groupRecordSet GroupManagementServiceSyncXSD.tmp#savePoint
Properties
content: complex
Model gms:groupRecordSet{0,1} , gms:savePoint{0,1}
Children gms:groupRecordSet, gms:savePoint
Instance
<gms:readGroupsFromSavePointResponse>
  <gms:groupRecordSet>{0,1}</gms:groupRecordSet>
  <gms:savePoint>{0,1}</gms:savePoint>
</gms:readGroupsFromSavePointResponse>
Source
<xs:element name="readGroupsFromSavePointResponse">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:groupRecordSet" minOccurs="0" maxOccurs="1"/>
      <xs:element ref="gms:savePoint" minOccurs="0" maxOccurs="1"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:updateGroupRequest
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#sourcedId GroupManagementServiceSyncXSD.tmp#groupRecord
Properties
content: complex
Model gms:sourcedId , gms:groupRecord
Children gms:groupRecord, gms:sourcedId
Instance
<gms:updateGroupRequest>
  <gms:sourcedId>{1,1}</gms:sourcedId>
  <gms:groupRecord>{1,1}</gms:groupRecord>
</gms:updateGroupRequest>
Source
<xs:element name="updateGroupRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:sourcedId"/>
      <xs:element ref="gms:groupRecord"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:updateGroupResponse
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Properties
content: complex
Source
<xs:element name="updateGroupResponse">
  <xs:complexType/>
</xs:element>
[ top ]
Element gms:replaceGroupRequest
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#sourcedId GroupManagementServiceSyncXSD.tmp#groupRecord
Properties
content: complex
Model gms:sourcedId , gms:groupRecord
Children gms:groupRecord, gms:sourcedId
Instance
<gms:replaceGroupRequest>
  <gms:sourcedId>{1,1}</gms:sourcedId>
  <gms:groupRecord>{1,1}</gms:groupRecord>
</gms:replaceGroupRequest>
Source
<xs:element name="replaceGroupRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:sourcedId"/>
      <xs:element ref="gms:groupRecord"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:replaceGroupResponse
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Properties
content: complex
Source
<xs:element name="replaceGroupResponse">
  <xs:complexType/>
</xs:element>
[ top ]
Element gms:discoverGroupIdsRequest
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#queryObject
Properties
content: complex
Model gms:queryObject
Children gms:queryObject
Instance
<gms:discoverGroupIdsRequest>
  <gms:queryObject>{1,1}</gms:queryObject>
</gms:discoverGroupIdsRequest>
Source
<xs:element name="discoverGroupIdsRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:queryObject"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:discoverGroupIdsResponse
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#sourcedIdSet
Properties
content: complex
Model gms:sourcedIdSet{0,1}
Children gms:sourcedIdSet
Instance
<gms:discoverGroupIdsResponse>
  <gms:sourcedIdSet>{0,1}</gms:sourcedIdSet>
</gms:discoverGroupIdsResponse>
Source
<xs:element name="discoverGroupIdsResponse">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:sourcedIdSet" minOccurs="0" maxOccurs="1"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:changeGroupIdentifierRequest
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#sourcedId GroupManagementServiceSyncXSD.tmp#newSourcedId
Properties
content: complex
Model gms:sourcedId , gms:newSourcedId
Children gms:newSourcedId, gms:sourcedId
Instance
<gms:changeGroupIdentifierRequest>
  <gms:sourcedId>{1,1}</gms:sourcedId>
  <gms:newSourcedId>{1,1}</gms:newSourcedId>
</gms:changeGroupIdentifierRequest>
Source
<xs:element name="changeGroupIdentifierRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="gms:sourcedId"/>
      <xs:element ref="gms:newSourcedId"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element gms:changeGroupIdentifierResponse
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Properties
content: complex
Source
<xs:element name="changeGroupIdentifierResponse">
  <xs:complexType/>
</xs:element>
[ top ]
Element gms:imsx_syncRequestHeaderInfo
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#imsx_version GroupManagementServiceSyncXSD.tmp#imsx_messageIdentifier GroupManagementServiceSyncXSD.tmp#imsx_RequestHeaderInfo.Type
Type gms:imsx_RequestHeaderInfo.Type
Properties
content: complex
mixed: false
Model gms:imsx_version{0,1} , gms:imsx_messageIdentifier
Children gms:imsx_messageIdentifier, gms:imsx_version
Instance
<gms:imsx_syncRequestHeaderInfo>
  <gms:imsx_version>{0,1}</gms:imsx_version>
  <gms:imsx_messageIdentifier>{1,1}</gms:imsx_messageIdentifier>
</gms:imsx_syncRequestHeaderInfo>
Source
<xs:element name="imsx_syncRequestHeaderInfo" type="gms:imsx_RequestHeaderInfo.Type"/>
[ top ]
Element gms:imsx_syncResponseHeaderInfo
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram GroupManagementServiceSyncXSD.tmp#imsx_version GroupManagementServiceSyncXSD.tmp#imsx_messageIdentifier GroupManagementServiceSyncXSD.tmp#imsx_statusInfo GroupManagementServiceSyncXSD.tmp#imsx_ResponseHeaderInfo.Type
Type gms:imsx_ResponseHeaderInfo.Type
Properties
content: complex
mixed: false
Model gms:imsx_version{0,1} , gms:imsx_messageIdentifier , gms:imsx_statusInfo
Children gms:imsx_messageIdentifier, gms:imsx_statusInfo, gms:imsx_version
Instance
<gms:imsx_syncResponseHeaderInfo>
  <gms:imsx_version>{0,1}</gms:imsx_version>
  <gms:imsx_messageIdentifier>{1,1}</gms:imsx_messageIdentifier>
  <gms:imsx_statusInfo>{1,1}</gms:imsx_statusInfo>
</gms:imsx_syncResponseHeaderInfo>
Source
<xs:element name="imsx_syncResponseHeaderInfo" type="gms:imsx_ResponseHeaderInfo.Type"/>
[ top ]
Simple Type gms:Relation.Type
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration Parent
enumeration Child
enumeration Sibling
enumeration TemplateParent
enumeration SectionChild
Used by
Element gms:relation
Source
<xs:simpleType name="Relation.Type">
  <xs:restriction base="xs:string">
    <xs:enumeration value="Parent"/>
    <xs:enumeration value="Child"/>
    <xs:enumeration value="Sibling"/>
    <xs:enumeration value="TemplateParent"/>
    <xs:enumeration value="SectionChild"/>
  </xs:restriction>
</xs:simpleType>
[ top ]
Simple Type gms:imsx_CodeMajor.Type
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration success
enumeration processing
enumeration failure
enumeration unsupported
Used by
Source
<xs:simpleType name="imsx_CodeMajor.Type">
  <xs:restriction base="xs:string">
    <xs:enumeration value="success"/>
    <xs:enumeration value="processing"/>
    <xs:enumeration value="failure"/>
    <xs:enumeration value="unsupported"/>
  </xs:restriction>
</xs:simpleType>
[ top ]
Simple Type gms:imsx_Severity.Type
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration status
enumeration warning
enumeration error
Used by
Source
<xs:simpleType name="imsx_Severity.Type">
  <xs:restriction base="xs:string">
    <xs:enumeration value="status"/>
    <xs:enumeration value="warning"/>
    <xs:enumeration value="error"/>
  </xs:restriction>
</xs:simpleType>
[ top ]
Simple Type gms:imsx_CodeMinorValue.Type
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration fullsuccess
enumeration createsuccess
enumeration nosourcedids
enumeration idalloc
enumeration overflowfail
enumeration idallocinusefail
enumeration invaliddata
enumeration incompletedata
enumeration partialdatastorage
enumeration unknownobject
enumeration deletefailure
enumeration targetreadfailure
enumeration savepointerror
enumeration savepointsyncerror
enumeration toomuchdata
enumeration unknownquery
enumeration unknownvocabulary
enumeration unknownmdvocabulary
enumeration unknowngtvocabulary
enumeration unknownextension
enumeration targetisbusy
enumeration unauthorizedrequest
enumeration linkfailure
enumeration unsupportedLIS
enumeration unsupportedLISoperation
Used by
Source
<xs:simpleType name="imsx_CodeMinorValue.Type">
  <xs:restriction base="xs:string">
    <xs:enumeration value="fullsuccess"/>
    <xs:enumeration value="createsuccess"/>
    <xs:enumeration value="nosourcedids"/>
    <xs:enumeration value="idalloc"/>
    <xs:enumeration value="overflowfail"/>
    <xs:enumeration value="idallocinusefail"/>
    <xs:enumeration value="invaliddata"/>
    <xs:enumeration value="incompletedata"/>
    <xs:enumeration value="partialdatastorage"/>
    <xs:enumeration value="unknownobject"/>
    <xs:enumeration value="deletefailure"/>
    <xs:enumeration value="targetreadfailure"/>
    <xs:enumeration value="savepointerror"/>
    <xs:enumeration value="savepointsyncerror"/>
    <xs:enumeration value="toomuchdata"/>
    <xs:enumeration value="unknownquery"/>
    <xs:enumeration value="unknownvocabulary"/>
    <xs:enumeration value="unknownmdvocabulary"/>
    <xs:enumeration value="unknowngtvocabulary"/>
    <xs:enumeration value="unknownextension"/>
    <xs:enumeration value="targetisbusy"/>
    <xs:enumeration value="unauthorizedrequest"/>
    <xs:enumeration value="linkfailure"/>
    <xs:enumeration value="unsupportedLIS"/>
    <xs:enumeration value="unsupportedLISoperation"/>
  </xs:restriction>
</xs:simpleType>
[ top ]
Simple Type gms:MediaMode.Type
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration uri
enumeration entityref
enumeration base64
Used by
Element gms:mediamode
Source
<xs:simpleType name="MediaMode.Type">
  <xs:restriction base="xs:string">
    <xs:enumeration value="uri"/>
    <xs:enumeration value="entityref"/>
    <xs:enumeration value="base64"/>
  </xs:restriction>
</xs:simpleType>
[ top ]
Simple Type gms:ContentRefType.Type
Namespace http://www.imsglobal.org/services/lis/gms2p0/xsd/imsgms_v2p0
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration