 |
IMS GLC Course Management Service WSDL/XSD Binding
Version 1.0 Final Release Specification
Final 1.0
|
Date Issued: 30 June 2011
Latest version: http://www.imsglobal.org/lis/
IPR and Distribution Notices
Recipients of this document are requested to submit, with their comments, notification of
any relevant patent claims or other intellectual property rights of which they may be aware that might be infringed by any implementation of the specification set forth in this document, and to provide supporting documentation.
IMS takes no position regarding the validity or scope of any intellectual property or other rights that might be claimed to pertain to the implementation or use of the technology described in this document or the extent to which any license under such rights might or might not be available; neither does it represent that it has made any effort to identify any such rights. Information on IMS's procedures with respect to rights in IMS specifications can be found at the IMS Intellectual Property Rights web page:
http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf.
Copyright © 2011 IMS Global Learning Consortium. All Rights Reserved.
If you wish to copy or distribute this document, you must complete a valid Registered User license registration with IMS and receive an email from IMS granting the license to distribute the specification. To register, follow the instructions on the IMS website: http://www.imsglobal.org/specificationdownload.cfm
This document may be copied and furnished to others by Registered Users who have registered on the IMS website provided that the above copyright notice and this paragraph are included on all such copies. However, this document itself may not be modified in any way, such as by removing the copyright notice or references to IMS, except as needed for the purpose of developing IMS specifications, under the auspices of a chartered IMS project group.
Use of this specification to develop products or services is governed by the license with IMS found on the IMS website: http://www.imsglobal.org/license.html
The limited permissions granted above are perpetual and will not be revoked by IMS or its successors or assigns.
THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTER'S OWN RISK, AND NEITHER THE CONSORTIUM, NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION.
Table of Contents
- Introduction
- Scope and Context
- Structure of this Document
- Nomenclature
- References
- Platform Specific Model of the Binding
- Service Description
- Data for the Servce Operations
- Course Data Model
- File Data Model
- Application of the Binding Guidelines
- WSDL File Documentation
- Overview
- Messages
- XSD File Documentation
- Service Data Model
- File Data Model
- Binding of the Vocabularies
- Appendix A - Listing of the WSDLs
- Appendix B - Listing of the XSDs
- Appendix C - Vocabulary VDEX Instance File Listings
- Appendix D - Example SOAP Messages
- About This Document
- Revision History
1. Introduction
This document is a part of the IMS GLC Course Management Service (CMS) v1.0 specification. The binding details how the Course Management Service Information Model is realised as a Web Service; in the form of a Web Services Description Language (WSDL) file. The CMS binding is contained in a set of WSDL, XSD and vocabulary files. The vocabulary files are instances of the IMS Vocabulary Definition Exchange specification [VDEX, 04a], [VDEX, 04b]. The IMS GLC Learning Information Services (LIS) Best Practice and Implementation Guide [LIS, 11b] provides non-normative guidance on how to use the Binding and Information Model. For a conceptual overview of the LIS Specification, please see the overall services description [LIS, 11a]. For a discussion of potential applications, see the Best Practice Guide.
1.1 Scope and Context
The IMS GLC CMS WSDL Binding v1.0 is used in conjunction with the following documents:
- IMS GLC Course Management Service Information Model v1.0 [CMS, 11] – the behaviour and data model definition of the Course Management Service;
- IMS GLC Learning Information Services Best Practice and Implementation Guide v1.0 [LIS, 11b] – key information on how to adopt and implement the specification.
This WSDL binding takes the Course Management Service Information Model and produces an encoding of that description in WSDL. This WSDL binding is generated as recommended by the IMS GLC General Web Services documents [GWS, 06a], [GWS, 06b]. The WSDL is created using the IMS GLC Binding Auto-generation Tool-kit (I-BAT) [I-BAT, 06].
1.2 Structure of this Document
The structure of this document is:
| 2. Platform Specific Model of the Binding |
The description platform specific models in the form of the IMS GLC UML-Profile service/data models representation of the IMS GLC CMS specification information model. This representation is used by the IMS GLC I-BAT tool to auto-generate the corresponding WSDL/XSDs; |
| 3. Application of the Binding Guidelines |
Explanation of how the platform specific model is realised as the WSDL/XSD binding. This addresses how the information model is realised as a Web Service; |
4. WSDL File Documentation
|
The description of the Web Services used to realise the service model components of the binding. This part of the binding document was created using the schema documentation tool provided as part of the Oxygen 12.2 product; |
5. XSD File Documentation
|
The description of the elements used within the data model components of the binding. This part of the binding document was created using the schema documentation tool provided as part of the Oxygen 12.2 product; |
| 6. Vocabulary Binding Using VDEX Instances |
Contains the description of how the set of external vocabulary files realised as VDEX files; |
| Appendix A - Listing of the WSDL Files |
This is the full listing of the CMS WSDL files; |
| Appendix B - Listing of the XSD Files |
This is the full listing of the CMS XSD files; |
| Appendix C - Vocabulary VDEX Instance File Listings |
This is the full listing of the set of external vocabulary VDEX instance files; |
| Appendix D - Examples SOAP Messages |
Examples of the SOAP messages that are exchanged to realise the service. |
1.3 Nomenclature
| BDEMS |
Bulk Data Exchnage Management Service |
| CMS |
Course Management Service |
| HTTP |
HyperText Transfer Protocol |
| I-BAT |
IMS GLC Binding Auto-generation Tool-kit |
| IMS GLC |
IMS Global Learning Consortium |
| LIS |
Learning Information Services |
| MDA |
Model Driven Architecture |
| PIM |
Protocol Independent Model |
| PSM |
Platform Specific Model |
| UML |
Unified Modelling Language |
| VDEX |
Vocabulary Definition Exchange |
| W3C |
World Wide Web Consortium |
| WSDL |
Web Services Description Language |
| XMI |
XML Meta-data Interchange |
| XML |
Extensible Mark-up Language |
| XSD |
XML Schema Definition |
| XSL |
Extensible Stylesheet Language |
| XSLT |
XSL Transformations |
1.4 References
[CMS, 11]
|
IMS GLC Course Management Services v1.0 Information Model Specification Public Final Release v1.0, L.Feng, B.Lee and C.Smythe, IMS Global Learning Consortium, June 2011.
|
[GWS, 06a]
|
IMS GLC General Web Services Base Profile Specification Final Release v1.0, C.Schroeder, J.Simon and C.Smythe, IMS Global Learning Consortium, January 2006.
|
[GWS, 06b]
|
IMS GLC General Web Services WSDL Binding Guidelines Final Release v1.0, C.Schroeder, J.Simon and C.Smythe, IMS Global Learning Consortium, January 2006.
|
| [I-BAT, 06] |
IMS Binding Auto-generation Toolkit Manual v1.0, C.Smythe, IMS Global Learning Consortium, July 2006. |
[LIS, 11a]
|
IMS GLC Learning Information Services v2.0 Specification Final Release v1.0, L.Feng, B.Lee and C.Smythe, IMS Global Learning Consortium, June 2011.
|
[LIS, 11b]
|
IMS GLC Learning Information Services v2.0 Best Practice and Implementation Guide Final Release v1.0, L.Feng, B.Lee and C.Smythe, IMS Global Learning Consortium, June 2011.
|
[SDN11, 06]
|
IMS GLC Specification Note 11: Vocabulary Definition, Registration & Maintenance Procedures, C.Smythe, IMS Global Learning Consortium, October 2006. |
[VDEX, 04a]
|
IMS Vocabulary Definition Exchange Information Model Specification Final Release v1.0, A.Cooper, IMS Global Learning Consortium, February 2004. |
[VDEX, 04b]
|
IMS Vocabulary Definition Exchange XML Binding Specification Final Release v1.0, A.Cooper, IMS Global Learning Consortium, February 2004. |
2. Platform Specific Model of the Binding
2.1 Service Description
Figure 2.1 is the PSM of the service group model description for the CMS. This information is used to establish the mapping to the binding flavors of WSDL.

Figure 2.1 The PSM representation of the service group model description for the CMS.
Figure 2.2 is the PSM of the service model description for the CMS. The PSM is derived from the Platform Independent Model that was documented within the information model for the CMS specification [CMS, 10].

Figure 2.2 The PSM representation of the service model description for the CMS.
2.2 Data for the Service Operations
The data model for the service opertaions is shown in Figure 2.3 and 2.4. Figure 2.3 shows the data models for the set of parameters. Figure 2.4 is the data model for the Status Information and other WSDL-specific binding data structures.

Figure 2.3 The PSM representation of the parameters data model description for the CMS.

Figure 2.4 The PSM representation of the status information data model description for the CMS.
2.3 Course Data Models
The PSM for the Course data models are shown in Figures 2.5, 2.6, 2.7, 2.8 and 2.9. Figure 2.5 is the CourseTemplate data model, Figure 2.6 is the CourseOffering data model, Figure 2.7 is the CourseSection data model, Figure 2.8 is the SectionAssociation data model and Figure 2.9 contains the set of common data model classes.

Figure 2.5 The PSM representation of the CourseTemplate data model description for the CMS.

Figure 2.6 The PSM representation of the CourseOffering data model description for the CMS.

Figure 2.7 The PSM representation of the CourseSection data model description for the CMS.

Figure 2.8 The PSM representation of the SectionAssociation data model description for the CMS.

Figure 2.9 The PSM representation of the common data models description for the CMS.
2.4 File-based Data Exchange Data Model
The PSM for the file-based Course data models are shown in Figures 2.10, 2.11, 2.12, 2.13 and 2.14. Figure 2.10 is the CourseTemplateRecord data model, Figure 2.11 is the CourseOfferingRecord data model, Figure 2.12 is the CourseSectionRecord data model, Figure 2.13 is the SectionAssociationRecord data model and Figure 2.14 contains the set of common data model classes.

Figure 2.10 The PSM representation of the CourseTemplateRecord data model description for file storage in the CMS.

Figure 2.11 The PSM representation of the CourseOfferingRecord data model description for file storage in the CMS.

Figure 2.12 The PSM representation of the CourseSectionRecord data model description for file storage in the CMS.

Figure 2.13 The PSM representation of the SectionAssociationRecord data model description for file storage in the CMS.

Figure 2.14 The PSM representation of the common data model description for file storage in the CMS.
3. Application of the Binding Guidelines
The WSDL/XSD bindings have been generated using the methodology documented in [GWS 06a] and [GWS, 06b]. Only the synchronous service binding has been created. The binding files are available in three forms:
- A single combined WSDL/XSD – CourseManagementServicev1p0_SyncSingle_v1p0.wsdl;
- As single combined WSDL/XSD for each interface – CourseManagementServicev1p0_CourseTemplateManagerSyncSingle_v1p0.wsdl, CourseManagementServicev1p0_CourseOfferingManagerSyncSingle_v1p0.wsdl, CourseManagementServicev1p0_CourseSectionManagerSyncSingle_v1p0.wsdl and CourseManagementServicev1p0_SectionAssociationManagerSyncSingle_v1p0.wsdl
- Separated WSDL and XSD files – CourseManagementServicev1p0_SyncWSDL_v1p0.wsdl and CourseManagementServiceSyncXSD.xsd respectively.
It is recommended that only the combined form is used (many WSDL-based code generation tools do not process the 'import' instructions).
The mapping between the PIM and PSM descriptions is detailed in Table 3.1.
Table 3.1 Mapping between the PIM, PSM and XSD descriptions for the data models.
| PSM Reference |
PIM Reference |
XSD Reference |
| Name |
UML Type |
Figure |
Type |
Table |
Name |
Type |
|
CourseTemplateRecordSet
|
Class |
2.5 |
– |
– |
CourseTemplateRecordSet.Type |
ComplexType |
|
|
Attribute |
2.5 |
CourseTemplateRecord |
– |
courseTemplateRecord |
Element |
|
CourseTemplateRecord
|
Class |
2.5 |
– |
5.2 |
CourseTemplateRecord.Type |
ComplexType |
|
|
Attribute |
2.5 |
SourcedGUID |
5.3 |
sourcedId |
Element |
|
|
Attribute |
2.5 |
CourseTemplate |
– |
courseTemplate |
Element |
|
SourcedGUID
|
Class |
2.5 |
– |
5.107 |
SourcedGUID.Type |
ComplexType |
|
|
Attribute |
2.5 |
NormalizedString |
5.108 |
refAgentInstanceId |
Element |
|
|
Attribute |
2.5 |
SourcedId |
5.109 |
sourcedId |
Element |
|
CourseTemplate
|
Class |
2.5 |
– |
5.10 |
CourseTemplate.Type |
ComplexType |
|
|
Attribute |
2.5 |
Text |
5.11 |
label |
Element |
|
|
Attribute |
2.5 |
Text |
5.12 |
title |
Element |
|
|
Attribute |
2.5 |
Description |
5.13 |
catalogDescription |
Element |
|
|
Attribute |
2.5 |
Text |
5.14 |
courseNumber |
Element |
|
|
Attribute |
2.6 |
External Vocabulary |
5.15 |
status |
Element |
|
|
Attribute |
2.5 |
Text |
5.16 |
defaultCredits |
Element |
|
|
Attribute |
2.5 |
Org |
5.17 |
org |
Element |
|
|
Attribute |
2.5 |
ListofTopics |
5.18 |
listofTopics |
Element |
|
|
Attribute |
2.5 |
ListofPrerequisites |
5.19 |
listofPrerequisites |
Element |
|
|
Attribute |
2.5 |
GUID |
5.20 |
dataSource |
Element |
|
|
Attribute |
2.5 |
Metadata |
5.21 |
recordInfo |
Element |
|
|
Attribute |
2.5 |
IMSExtension |
5.22 |
extension |
Element |
|
ListofPrerequisites
|
Class |
2.5 |
– |
5.23 |
ListofPrerequisites.Type |
ComplexType |
|
|
Attribute |
2.5 |
Text |
5.24 |
prerequisite |
Element |
|
ListofTopics
|
Class |
2.5 |
– |
5.25 |
ListofTopics.Type |
ComplexType |
|
|
Attribute |
2.5 |
Text |
5.26 |
topic |
Element |
|
CourseOfferingRecordSet
|
Class |
2.6 |
– |
– |
CourseOfferingRecordSet.Type |
ComplexType |
|
|
Attribute |
2.6 |
CourseOfferingRecord |
– |
courseOfferingRecord |
Element |
|
CourseOfferingRecord
|
Class |
2.6 |
– |
5.4 |
CourseOfferingRecord.Type |
ComplexType |
|
|
Attribute |
2.5 |
SourcedGUID |
5.5 |
sourcedId |
Element |
|
|
Attribute |
2.6 |
CourseOffering |
– |
courseOffering |
Element |
|
CourseOffering
|
Class |
2.6 |
– |
5.27 |
CourseOffering.Type |
ComplexType |
|
|
Attribute |
26 |
Text |
5.28 |
label |
Element |
|
|
Attribute |
2.6 |
Text |
5.29 |
title |
Element |
|
|
Attribute |
2.6 |
GUID |
5.30 |
parentTemplateId |
Element |
|
|
Attribute |
2.6 |
Description |
5.31 |
catalogDescription |
Element |
|
|
Attribute |
2.6 |
Text |
5.32 |
defaultCredits |
Element |
|
|
Attribute |
2.6 |
External Vocabulary |
5.33 |
status |
Element |
|
|
Attribute |
2.6 |
External Vocabulary |
5.34 |
academicSession |
Element |
|
|
Attribute |
2.6 |
Org |
5.35 |
org |
Element |
|
|
Attribute |
2.6 |
TimeFrame |
5.36 |
timeFrame |
Element |
|
|
Attribute |
2.6 |
EnrollControl |
5.37 |
enrollControl |
Element |
|
|
Attribute |
2.6 |
GUID |
5.38 |
dataSource |
Element |
|
|
Attribute |
2.6 |
Metadata |
5.39 |
recordInfo |
Element |
|
|
Attribute |
2.6 |
IMSExtension |
5.40 |
extension |
Element |
|
CourseSectionRecordSet
|
Class |
2.7 |
– |
– |
CourseOfferingRecordSet.Type |
ComplexType |
|
|
Attribute |
2.7 |
CourseSectionRecord |
– |
courseSectionRecord |
Element |
|
CourseSectionRecord
|
Class |
2.7 |
– |
5.6 |
CourseSectionRecord.Type |
ComplexType |
|
|
Attribute |
2.5 |
SourcedGUID |
5.7 |
sourcedId |
Element |
|
|
Attribute |
2.7 |
CourseSection |
– |
courseSection |
Element |
|
CourseSection
|
Class |
2.7 |
– |
5.41 |
CourseSection.Type |
ComplexType |
|
|
Attribute |
2.7 |
Text |
5.42 |
label |
Element |
|
|
Attribute |
2.7 |
Text |
5.43 |
title |
Element |
|
|
Attribute |
2.7 |
GUID |
5.44 |
parentOfferingId |
Element |
|
|
Attribute |
2.7 |
Description |
5.45 |
catalogDescription |
Element |
|
|
Attribute |
2.7 |
External Vocabulary |
5.46 |
status |
Element |
|
|
Attribute |
2.7 |
Text |
5.47 |
defaultCredits |
Element |
|
|
Attribute |
2.7 |
External Vocabulary |
5.48 |
status |
Element |
|
|
Attribute |
2.7 |
Integer |
5.49 |
maxNumberofStudents |
Element |
|
|
Attribute |
2.7 |
Integer |
5.50 |
numberofStudents |
Element |
|
|
Attribute |
2.7 |
External Vocabulary |
5.51 |
academicSession |
Element |
|
|
Attribute |
2.7 |
Org |
5.52 |
org |
Element |
|
|
Attribute |
2.7 |
TimeFrame |
5.53 |
timeFrame |
Element |
|
|
Attribute |
2.7 |
EnrollControl |
5.54 |
enrollControl |
Element |
|
|
Attribute |
2.7 |
Text |
5.55 |
locaton |
Element |
|
|
Attribute |
2.7 |
Text |
5.56 |
locaton |
Element |
|
|
Attribute |
2.7 |
Text |
5.57 |
locaton |
Element |
|
|
Attribute |
2.7 |
GUID |
5.58 |
dataSource |
Element |
|
|
Attribute |
2.7 |
Metadata |
5.59 |
recordInfo |
Element |
|
|
Attribute |
2.7 |
IMSExtension |
5.60 |
extension |
Element |
|
SectionAssociationRecordSet
|
Class |
2.8 |
– |
– |
CourseOfferingRecordSet.Type |
ComplexType |
|
|
Attribute |
2.8 |
SectionAssociationRecord |
– |
sectionAssociationRecord |
Element |
|
SectionAssociationRecord
|
Class |
2.8 |
– |
5.8 |
CourseSectionAssociationRecord.Type |
ComplexType |
|
|
Attribute |
2.5 |
SourcedGUID |
5.9 |
sourcedId |
Element |
|
|
Attribute |
2.8 |
SectionAssociation |
– |
sectionAssociation |
Element |
|
SectionAssociation
|
Class |
2.8 |
– |
5.61 |
SectionAssociation.Type |
ComplexType |
|
|
Attribute |
2.8 |
Text |
5.62 |
label |
Element |
|
|
Attribute |
2.8 |
Text |
5.63 |
title |
Element |
|
|
Attribute |
2.8 |
External Vocabulary |
5.64 |
status |
Element |
|
|
Attribute |
2.8 |
ListofCourseSectionIds |
5.65 |
courseSectionIdList |
Element |
|
|
Attribute |
2.8 |
GUID |
5.66 |
dataSource |
Element |
|
|
Attribute |
2.8 |
Metadata |
5.67 |
recordInfo |
Element |
|
|
Attribute |
2.8 |
IMSExtension |
5.68 |
extension |
Element |
|
ListofCourseSectionIds
|
Class |
2.8 |
– |
5.69 |
ListofCourseSectionIds.Type |
ComplexType |
|
|
Attribute |
2.8 |
GUID |
5.70 |
courseSectionId |
Element |
|
EnrollControll
|
Class |
2.9 |
– |
5.76 |
EnrollControll.Type |
ComplexType |
|
|
Attribute |
2.9 |
Boolean |
5.77 |
enrollAccept |
Element |
|
|
Attribute |
2.9 |
Boolean |
5.78 |
enrollAllowed |
Element |
|
Org
|
Class |
2.9 |
– |
5.71 |
Org.Type |
ComplexType |
|
|
Attribute |
2.9 |
Text |
5.72 |
orgName |
Element |
|
|
Attribute |
2.9 |
Text |
5.73 |
orgUnit |
Element |
|
|
Attribute |
2.9 |
Text |
5.74 |
type |
Element |
|
|
Attribute |
2.9 |
Text |
5.75 |
id |
Element |
|
TimeFrame
|
Class |
2.9 |
– |
5.79 |
TimeFrame.Type |
ComplexType |
|
|
Attribute |
2.9 |
DateTime |
5.80 |
begin |
Element |
|
|
Attribute |
2.9 |
DateTime |
5.81 |
end |
Element |
|
|
Attribute |
2.9 |
Boolean |
5.82 |
restrict |
Element |
|
|
Attribute |
2.9 |
Text |
5.83 |
adminPeriod |
Element |
|
Description
|
Class |
2.9 |
– |
5.84 |
Description.Type |
ComplexType |
|
|
Attribute |
2.9 |
Text |
5.85 |
shortDescription |
Element |
|
|
Attribute |
2.9 |
Text |
5.86 |
longDescription |
Element |
|
|
Attribute |
2.9 |
FullDescription |
5.87 |
fullDescription |
Element |
|
FullDescription
|
Class |
2.9 |
– |
5.88 |
FullDescription.Type |
ComplexType |
|
|
Attribute |
2.9 |
Enumerated |
5.89 |
mediamode |
Element |
|
|
Attribute |
2.9 |
Enumerated |
5.90 |
contentRefType |
Element |
|
|
Attribute |
2.9 |
NormailzedString |
5.91 |
mimeType |
Element |
|
|
Attribute |
2.9 |
Text |
5.92 |
descriptionText |
Element |
|
Metadata
|
Class |
2.9 |
– |
5.95 |
Metadata.Type |
ComplexType |
|
|
Attribute |
2.9 |
AnyURI |
5.96 |
metadataNameVocabulary |
Element |
|
|
Attribute |
2.9 |
AnyURI |
5.97 |
metadataTypeVocabulary |
Element |
|
|
Attribute |
2.9 |
ExtensionField |
5.98 |
metadataField |
Element |
|
IMSExtension
|
Class |
2.9 |
– |
5.100 |
IMSExtension.Type |
ComplexType |
|
|
Attribute |
2.9 |
AnyURI |
5.101 |
extensionNameVocabulary |
Element |
|
|
Attribute |
2.9 |
AnyURI |
5.102 |
extensionTypeVocabulary |
Element |
|
|
Attribute |
2.9 |
ExtensionField |
TBD |
extensionField |
Element |
|
ExtensionField
|
Class |
2.9 |
– |
5.103 |
ExtensionField.Type |
ComplexType |
|
|
Attribute |
2.9 |
NormalizedString |
5.104 |
fieldName |
Element |
|
|
Attribute |
2.9 |
NormalizedString |
5.105 |
fieldType |
Element |
|
|
Attribute |
2.9 |
NormalizedString |
5.106 |
fieldValue |
Element |
|
Text
|
Class |
2.9 |
– |
5.93 |
Text.Type |
ComplexType |
|
|
Attribute |
2.9 |
NormailzedString |
5.94 |
language |
Element |
|
|
Attribute |
2.9 |
String |
5.95 |
textString |
Element |
|
imsx_StatusInfo
|
Class |
2.4 |
– |
See IMS GWSv1.0 |
imsx_StatusInfo.Type |
ComplexType |
|
|
Attribute |
2.4 |
n/a |
See IMS GWSv1.0 |
imsx_codeMajor |
Element |
|
|
Attribute |
2.4 |
n/a |
See IMS GWSv1.0 |
imsx_severity |
Element |
- imsx_messageRefIdentifier
|
Attribute |
2.4 |
n/a |
See IMS GWSv1.0 |
imsx_messageRefIdentifier |
Element |
- imsx_operationRefIdentifier
|
Attribute |
2.4 |
n/a |
See IMS GWSv1.0 |
imsx_operationRefIdentifier |
Element |
|
|
Attribute |
2.4 |
n/a |
See IMS GWSv1.0 |
imsx_description |
Element |
|
|
Attribute |
2.4 |
n/a |
See IMS GWSv1.0 |
imsx_codeMinor |
Element |
|
imsx_CodeMinor
|
Class |
2.4 |
– |
See IMS GWSv1.0 |
imsx_CodeMinor.Type |
ComplexType |
|
|
Attribute |
2.4 |
n/a |
See IMS GWSv1.0 |
imsx_codeMinorField |
Element |
|
imsx_CodeMinorField
|
Class |
2.4 |
– |
See IMS GWSv1.0 |
imsx_CodeMinorField.Type |
ComplexType |
|
|
Attribute |
2.4 |
n/a |
See IMS GWSv1.0 |
imsx_codeMinorFieldName |
Element |
|
|
Attribute |
2.4 |
n/a |
See IMS GWSv1.0 |
imsx_codeMinorFieldValue |
Element |
|
imsx_StatusBinding
|
Class |
2.4 |
– |
See IMS GWSv1.0 |
imsx_StatusBinding.Type |
ComplexType |
- imsx_syncRequestHeaderInfo
|
Attribute |
2.4 |
n/a |
See IMS GWSv1.0 |
imsx_syncRequestHeaderInfo |
Element |
- imsx_syncResponseHeaderInfo
|
Attribute |
2.4 |
n/a |
See IMS GWSv1.0 |
imsx_syncResponseHeaderInfo |
Element |
|
imsx_RequestHeaderInfo
|
Class |
2.4 |
– |
See IMS GWSv1.0 |
imsx_RequestHeaderInfo.Type |
ComplexType |
|
|
Attribute |
2.4 |
n/a |
See IMS GWSv1.0 |
imsx_version |
Element |
|
|
Attribute |
2.4 |
n/a |
See IMS GWSv1.0 |
imsx_messageIdentifier |
Element |
|
imsx_ResponseHeaderInfo
|
Class |
2.4 |
– |
See IMS GWSv1.0 |
imsx_ResponseHeaderInfo.Type |
ComplexType |
|
|
Attribute |
2.4 |
n/a |
See IMS GWSv1.0 |
imsx_version |
Element |
|
|
Attribute |
2.4 |
n/a |
See IMS GWSv1.0 |
imsx_messageIdentifier |
Element |
|
|
Attribute |
2.4 |
n/a |
See IMS GWSv1.0 |
imsx_statusInfo |
Element |
Key:
- The 'PSM Reference' field refers to information in the PSM description (Section 2 in this document). The sub-fields are:
- Name – the name of the data structure in the PSM and PIM
- UML Type – the type of UML construct i.e. either Class or Attribute
- Figure – the reference Figure number in this document;
- The 'PIM Reference' field refers to infomation in the CMS Information Model [CMS, 11]. The sub-fields are:
- Type – the type of the data structure in the Information Model
- Table – the reference number of Tabular description in the corresponding Information Model document;
- The 'XSD Reference' field refers to information in the XSD descriptions (Section 5 in this document). The sub-fields are:
- Name – the name of the field in the XSD(s)
- Type – the type of XSD construct i.e. either a ComplexType or Element.
4. WSDL File Documentation
WSDL file: "CourseManagementServiceSyncSingle.wsdl"
Target namespace: http://www.imsglobal.org/services/lis/cms1p0/wsdl11/sync/imscms_v1p0
4.1 Overview
|
|
|
|
| Messages |
| createCourseTemplateRequest, createCourseTemplateResponse, createByProxyCourseTemplateRequest, createByProxyCourseTemplateResponse, deleteCourseTemplateRequest, deleteCourseTemplateResponse, readCourseTemplateRequest, readCourseTemplateResponse, readAllCourseTemplateIdsRequest, readAllCourseTemplateIdsResponse, readCourseTemplateIdsFromSavePointRequest, readCourseTemplateIdsFromSavePointResponse, readCourseTemplatesRequest, readCourseTemplatesResponse, readCourseTemplatesFromSavePointRequest, readCourseTemplatesFromSavePointResponse, readCourseOfferingIdsForCourseTemplateRequest, readCourseOfferingIdsForCourseTemplateResponse, updateCourseTemplateRequest, updateCourseTemplateResponse, replaceCourseTemplateRequest, replaceCourseTemplateResponse, discoverCourseTemplateIdsRequest, discoverCourseTemplateIdsResponse, changeCourseTemplateIdentifierRequest, changeCourseTemplateIdentifierResponse, createCourseOfferingRequest, createCourseOfferingResponse, createByProxyCourseOfferingRequest, createByProxyCourseOfferingResponse, createCourseOfferingFromCourseOfferingRequest, createCourseOfferingFromCourseOfferingResponse, deleteCourseOfferingRequest, deleteCourseOfferingResponse, readCourseOfferingRequest, readCourseOfferingResponse, readAllCourseOfferingIdsRequest, readAllCourseOfferingIdsResponse, readCourseOfferingIdsFromSavePointRequest, readCourseOfferingIdsFromSavePointResponse, readAllActiveCourseOfferingIdsForAcademicSessionRequest, readAllActiveCourseOfferingIdsForAcademicSessionResponse, readCourseSectionIdsForCourseOfferingRequest, readCourseSectionIdsForCourseOfferingResponse, readCourseOfferingsRequest, readCourseOfferingsResponse, readCourseOfferingsFromSavePointRequest, readCourseOfferingsFromSavePointResponse, updateCourseOfferingRequest, updateCourseOfferingResponse, updateCourseOfferingStatusRequest, updateCourseOfferingStatusResponse, replaceCourseOfferingRequest, replaceCourseOfferingResponse, discoverCourseOfferingIdsRequest, discoverCourseOfferingIdsResponse, changeCourseOfferingIdentifierRequest, changeCourseOfferingIdentifierResponse, createCourseSectionRequest, createCourseSectionResponse, createByProxyCourseSectionRequest, createByProxyCourseSectionResponse, createCourseSectionFromCourseSectionRequest, createCourseSectionFromCourseSectionResponse, deleteCourseSectionRequest, deleteCourseSectionResponse, readCourseSectionRequest, readCourseSectionResponse, readAllCourseSectionIdsRequest, readAllCourseSectionIdsResponse, readCourseSectionIdsFromSavePointRequest, readCourseSectionIdsFromSavePointResponse, readCourseSectionsRequest, readCourseSectionsResponse, readCourseSectionsFromSavePointRequest, readCourseSectionsFromSavePointResponse, updateCourseSectionRequest, updateCourseSectionResponse, updateCourseSectionStatusRequest, updateCourseSectionStatusResponse, replaceCourseSectionRequest, replaceCourseSectionResponse, discoverCourseSectionIdsRequest, discoverCourseSectionIdsResponse, changeCourseSectionIdentifierRequest, changeCourseSectionIdentifierResponse, createSectionAssociationRequest, createSectionAssociationResponse, createByProxySectionAssociationRequest, createByProxySectionAssociationResponse, deleteSectionAssociationRequest, deleteSectionAssociationResponse, readSectionAssociationRequest, readSectionAssociationResponse, readAllSectionAssociationIdsRequest, readAllSectionAssociationIdsResponse, readSectionAssociationIdsFromSavePointRequest, readSectionAssociationIdsFromSavePointResponse, readSectionAssociationsRequest, readSectionAssociationsResponse, readSectionAssociationsFromSavePointRequest, readSectionAssociationsFromSavePointResponse, addCourseSectionIdRequest, addCourseSectionIdResponse, removeCourseSectionIdRequest, removeCourseSectionIdResponse, updateSectionAssociationRequest, updateSectionAssociationResponse, replaceSectionAssociationRequest, replaceSectionAssociationResponse, discoverSectionAssociationIdsRequest, discoverSectionAssociationIdsResponse, changeSectionAssociationIdentifierRequest, changeSectionAssociationIdentifierResponse,
|
|
| WSDL Definition |
| Name |
Documentation |
| CourseManagementServiceSyncServices |
WSDL File Information
Services: CourseManagementService (Synchronous Communications)
Author: Colin Smythe
Date: 30 June 2011
Version: Final 1.0
Status: Final Release
Description: The Course Management Service. This is a part of the IMS Learning Information Services (LIS) v2.0 specification.
History: Version 1.0: This is the first formal release of this service. This service was not a part of the IMS Enterprise Services v1.0.
WSDL Binding: WSDL Binding is based upon the IMS General Web Services Base Profile v1.0 The IMS GWS Basic Profile is derived from the WS-I Basic Profile v1.1. This profile uses: WSDL 1.1, SOAP 1.1, HTTP 1.1 and XML 1.0. Extension profiles to the IMS GWS Base Profile are available but are not supported using this tool version.
License: IPR, License and Distribution Notices
This machine readable file is derived from IMS Global Learning Consortium (GLC) specification IMS GLC Course Management Service Version 1.0 found at http://www.imsglobal.org/lis/cmsv1p0/imscmsv1p0_InfoPDv1.pdf and the original IMS schema binding or code base http://www.imsglobal.org/lis/cmsv1p0/imscmsv1p0_BindPDv1.html.
Recipients of this document are requested to submit, with their comments, notification of any relevant patent claims or other intellectual property rights of which they may be aware that might be infringed by the schema binding contained in this document. IMS GLC takes no position regarding the validity or scope of any intellectual property or other rights that might be claimed to pertain to the implementation or use of the technology described in this document or the extent to which any license under such rights might or might not be available; neither does it represent that it has made any effort to identify any such rights.
Information on IMS GLCs procedures with respect to rights in IMS GLC specifications can be found at the IMS GLC Intellectual Property Rights web page: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf.
Copyright © IMS Global Learning Consortium 1999-2011. All Rights Reserved.
License Notice for Users
Users of products or services that include this document are hereby granted a worldwide, royalty-free, non-exclusive license to use this document.
Distribution Notice for Developers
Developers of products or services that are not original incorporators of this document and have not changed this document, that is, are distributing a software product that incorporates this document as is from a third-party source other than IMS, are hereby granted permission to copy, display and distribute the contents of this document in any medium for any purpose without fee or royalty provided that you include this IPR, License and Distribution notice in its entirety on ALL copies, or portions thereof.
Developers of products or services that are original incorporators of this document and wish to provide distribution of this document as is or with modifications and developers of products and services that are not original incorporators of this document and have changed this document, are required to register with the IMS GLC community on the IMS GLC website as described in the following two paragraphs:-
- If you wish to distribute this document as is, with no modifications, you are hereby granted permission to copy, display and distribute the contents of this document in any medium for any purpose without fee or royalty provided that you include this IPR, License and Distribution notice in its entirety on ALL copies, or portions thereof, that you make and you complete a valid license registration with IMS and receive an email from IMS granting the license. To register, follow the instructions on the IMS website: http://www.imsglobal.org/specificationdownload.cfm. Once registered you are granted permission to transfer unlimited distribution rights of this document for the purposes of third-party or other distribution of your product or service that incorporates this document as long as this IPR, License and Distribution notice remains in place in its entirety;
- If you wish to create and distribute a derived work from this document, you are hereby granted permission to copy, display and distribute the contents of the derived work in any medium for any purpose without fee or royalty provided that you include this IPR, License and Distribution notice in its entirety on ALL copies, or portions thereof, that you make and you complete a valid profile registration with IMS GLC and receive an email from IMS GLC granting the license. To register, follow the instructions on the IMS GLC website: http://www.imsglobal.org/profile/. Once registered you are granted permission to transfer unlimited distribution rights of the derived work for the purposes of third-party or other distribution of your product or service that incorporates the derived work as long as this IPR, License and Distribution notice remains in place in its entirety.
The limited permissions granted above are perpetual and will not be revoked by IMS GLC or its successors or assigns.
THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTERS OWN RISK, AND NEITHER THE CONSORTIUM NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION.
UML Source File Information
Choreography: Sync
Transport: SOAPv1.1
Source XSLT File Information
XSL Generator: UMLtoWSDLTransformv0p9p5.xsl
XSLT Processor: Xalan
Release: 1.0 Beta 4
Date: 31st March, 2011
IMS GLC Auto-generation Binding Tool-kit (I-BAT)
This file was auto-generated using the IMS GLC Binding Auto-generation Tool-kit (I-BAT). While every attempt has been made to ensure that this tool auto-generates the files correctly, users should be aware that this is an experimental tool. Permission is given to make use of this tool. IMS GLC makes no claim on the materials created by third party users of this tool. Details on how to use this tool are contained in the IMS GLC "I-BAT" Documentation available at the IMS GLC web-site.
Tool Copyright: 2005-2011 (c) IMS Global Learning Consortium Inc. All Rights Reserved.
|
| Services |
| Name |
Documentation |
| CourseManagementServiceSyncService |
Service Information
Author: Colin Smythe
Date: 30 June 2011
Version: Final 1.0
Status: Final Release
Description: The Course Management Service is composed of four interfaces each of which has several operations.
History: Version 1.0: This is the first formal release of this service. This service is a part of the IMS LIS v2.0 specification
|
|
| Binding : CourseTemplateManagerSyncSoapBinding |
| Port Type |
CourseTemplateManagerSyncPortType |
| Extensibility |
<soap11:binding transport="http://schemas.xmlsoap.org/soap/http" style="document"/> |
| Operations |
createCourseTemplate, createByProxyCourseTemplate, deleteCourseTemplate, readCourseTemplate, readAllCourseTemplateIds, readCourseTemplateIdsFromSavePoint, readCourseTemplates, readCourseTemplatesFromSavePoint, readCourseOfferingIdsForCourseTemplate, updateCourseTemplate, replaceCourseTemplate, discoverCourseTemplateIds, changeCourseTemplateIdentifier, |
| Binding : CourseOfferingManagerSyncSoapBinding |
| Port Type |
CourseOfferingManagerSyncPortType |
| Extensibility |
<soap11:binding transport="http://schemas.xmlsoap.org/soap/http" style="document"/> |
| Operations |
createCourseOffering, createByProxyCourseOffering, createCourseOfferingFromCourseOffering, deleteCourseOffering, readCourseOffering, readAllCourseOfferingIds, readCourseOfferingIdsFromSavePoint, readAllActiveCourseOfferingIdsForAcademicSession, readCourseSectionIdsForCourseOffering, readCourseOfferings, readCourseOfferingsFromSavePoint, updateCourseOffering, updateCourseOfferingStatus, replaceCourseOffering, discoverCourseOfferingIds, changeCourseOfferingIdentifier, |
| Binding : CourseSectionManagerSyncSoapBinding |
| Port Type |
CourseSectionManagerSyncPortType |
| Extensibility |
<soap11:binding transport="http://schemas.xmlsoap.org/soap/http" style="document"/> |
| Operations |
createCourseSection, createByProxyCourseSection, createCourseSectionFromCourseSection, deleteCourseSection, readCourseSection, readAllCourseSectionIds, readCourseSectionIdsFromSavePoint, readCourseSections, readCourseSectionsFromSavePoint, updateCourseSection, updateCourseSectionStatus, replaceCourseSection, discoverCourseSectionIds, changeCourseSectionIdentifier, |
| Binding : SectionAssociationManagerSyncSoapBinding |
| Port Type |
SectionAssociationManagerSyncPortType |
| Extensibility |
<soap11:binding transport="http://schemas.xmlsoap.org/soap/http" style="document"/> |
| Operations |
createSectionAssociation, createByProxySectionAssociation, deleteSectionAssociation, readSectionAssociation, readAllSectionAssociationIds, readSectionAssociationIdsFromSavePoint, readSectionAssociations, readSectionAssociationsFromSavePoint, addCourseSectionId, removeCourseSectionId, updateSectionAssociation, replaceSectionAssociation, discoverSectionAssociationIds, changeSectionAssociationIdentifier, |
4.2 Messages
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:createCourseTemplateRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:createCourseTemplateResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:createByProxyCourseTemplateRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:createByProxyCourseTemplateResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:deleteCourseTemplateRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:deleteCourseTemplateResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readCourseTemplateRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readCourseTemplateResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readAllCourseTemplateIdsRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readAllCourseTemplateIdsResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readCourseTemplateIdsFromSavePointRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readCourseTemplateIdsFromSavePointResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readCourseTemplatesRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readCourseTemplatesResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readCourseTemplatesFromSavePointRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readCourseTemplatesFromSavePointResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readCourseOfferingIdsForCourseTemplateRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readCourseOfferingIdsForCourseTemplateResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:updateCourseTemplateRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:updateCourseTemplateResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:replaceCourseTemplateRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:replaceCourseTemplateResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:discoverCourseTemplateIdsRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:discoverCourseTemplateIdsResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:changeCourseTemplateIdentifierRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:changeCourseTemplateIdentifierResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:createCourseOfferingRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:createCourseOfferingResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:createByProxyCourseOfferingRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:createByProxyCourseOfferingResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:createCourseOfferingFromCourseOfferingRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:createCourseOfferingFromCourseOfferingResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:deleteCourseOfferingRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:deleteCourseOfferingResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readCourseOfferingRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readCourseOfferingResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readAllCourseOfferingIdsRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readAllCourseOfferingIdsResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readCourseOfferingIdsFromSavePointRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readCourseOfferingIdsFromSavePointResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readAllActiveCourseOfferingIdsForAcademicSessionRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readAllActiveCourseOfferingIdsForAcademicSessionResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readCourseSectionIdsForCourseOfferingRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readCourseSectionIdsForCourseOfferingResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readCourseOfferingsRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readCourseOfferingsResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readCourseOfferingsFromSavePointRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readCourseOfferingsFromSavePointResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:updateCourseOfferingRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:updateCourseOfferingResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:updateCourseOfferingStatusRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:updateCourseOfferingStatusResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:replaceCourseOfferingRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:replaceCourseOfferingResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:discoverCourseOfferingIdsRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:discoverCourseOfferingIdsResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:changeCourseOfferingIdentifierRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:changeCourseOfferingIdentifierResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:createCourseSectionRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:createCourseSectionResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:createByProxyCourseSectionRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:createByProxyCourseSectionResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:createCourseSectionFromCourseSectionRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:createCourseSectionFromCourseSectionResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:deleteCourseSectionRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:deleteCourseSectionResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readCourseSectionRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readCourseSectionResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readAllCourseSectionIdsRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readAllCourseSectionIdsResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readCourseSectionIdsFromSavePointRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readCourseSectionIdsFromSavePointResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readCourseSectionsRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readCourseSectionsResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readCourseSectionsFromSavePointRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readCourseSectionsFromSavePointResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:updateCourseSectionRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:updateCourseSectionResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:updateCourseSectionStatusRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:updateCourseSectionStatusResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:replaceCourseSectionRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:replaceCourseSectionResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:discoverCourseSectionIdsRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:discoverCourseSectionIdsResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:changeCourseSectionIdentifierRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:changeCourseSectionIdentifierResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:createSectionAssociationRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:createSectionAssociationResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:createByProxySectionAssociationRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:createByProxySectionAssociationResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:deleteSectionAssociationRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:deleteSectionAssociationResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readSectionAssociationRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readSectionAssociationResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readAllSectionAssociationIdsRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readAllSectionAssociationIdsResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readSectionAssociationIdsFromSavePointRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readSectionAssociationIdsFromSavePointResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readSectionAssociationsRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readSectionAssociationsResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:readSectionAssociationsFromSavePointRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:readSectionAssociationsFromSavePointResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:addCourseSectionIdRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:addCourseSectionIdResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:removeCourseSectionIdRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:removeCourseSectionIdResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:updateSectionAssociationRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:updateSectionAssociationResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:replaceSectionAssociationRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:replaceSectionAssociationResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:discoverSectionAssociationIdsRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:discoverSectionAssociationIdsResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Parameters |
tns:changeSectionAssociationIdentifierRequest |
N/A |
|
| HeaderInfoParameters |
tns:imsx_syncRequestHeaderInfo |
N/A |
|
| Part Name |
Element |
Type |
Documentation |
| Response |
tns:changeSectionAssociationIdentifierResponse |
N/A |
|
| HeaderInfoResponse |
tns:imsx_syncResponseHeaderInfo |
N/A |
|
5. XSD File Documentation
The XSD file documentation has been produced by the Oxygen XML Editing tool.
Click on the Section header to access this documentation for the data models in the service description.
Click on the Section header to access this documentation for the data models for the exchange of Group objects in an external file.
6. Binding of the Vocabularies
The vocabularies in the CMS are:
- Status values vocabulary – the set of data-types that are permitted for the status field. The PSM for the status vocabulary is shown in Figure 6.1;
- Extension data-type vocabulary – the set of data-types that are permitted for extensions in the Course data model. The PSM for the extension data-type vocabulary is shown in Figure 6.2.
These vocabularies are the default set maintained under the IMS GLC Vocabulary Registry [SDN11, 06]. It is the responsibility of an implementation to ensure that it is using the correct and latest versions of the vocabulary files. Changes to the default vocabularies are permitted; this results in the creation of a new vocabulary that should be registered with IMS GLC. As part of a profiling process entirely new vocabularies may be defined to replace the default set.

Figure 6.1 The PSM representation of the status vocabulary for the CMS.

Figure 6.2 The PSM representation of the extension data-type vocabulary for the CMS.
Appendix A - Listing of the WSDLs
The WSDL bindings are for a Synchronous SOAP implementation only. The WSDL files, expressed using WSDLv1.1, are:
- The combined WSDL/XSD file (this contains the WSDL and XSD descriptions in a single file) – CourseManagementServicev1p0_SyncSinglev1p0.wsdl
- The single WSDL file (used in conjunction with the separate XSD file) is available to LIS Alliance members. Click here to join the Alliance. Also available to Alliance members are combined WSDL/XSD files but where each file describes a single interface/port.
These files were generated by the I-BATv0.9.5 tool using the PSM representation described in Section 2.
Appendix B - Listing of the XSDs
The XSD files are:
This file was generated by the I-BATv0.9.5 tool using the PSM representation described in Section 2. Documentation of the XSDs is supplied in Section 5.
Appendix C - Vocabulary VDEX Instance File Listings
The CMS vocabularies are:
These vocabularies are each expressed as an instance of the IMS GLC Vocabulary Data Exchange (VDEX) v1.0 specification. Documentation of the vocabulary is supplied in Section 6. The online versions of these vocabularies are available in the directory: http://www.imsglobal.org/vdex/lis/cmsv1p0/.
Appendix D - Example SOAP Messages
The set of examples for the SOAP messages are listed in Tables D.1 (CourseTemplate), D.2 (Course Offering), D.3 (Course Section) and D.4 (Section Association).
Table D.1 The set of SOAP message examples for each operation for the CourseTemplate port.
Table D.2 The set of SOAP message examples for each operation for the CourseOffering port.
Table D.3 The set of SOAP message examples for each operation for the CourseSection port.
Table D.4 The set of SOAP message examples for each operation for the SectionAssociation port.
About This Document
Title
|
IMS GLC Course Management Service WSDL/XSD Binding
|
Editor
|
Colin Smythe (IMS GLC)
|
Co-Chairs
|
Linda Feng (Oracle), Bill Lee (Desire2learn)
|
Version
|
1.0
|
Version Date
|
30 June 2011
|
Release
|
Final 1.0
|
Status
|
Final Release
|
Summary
|
This document contains the description of the IMS GLC Course Management Service v1.0 WSDL/XSD binding. This service is used to exchange information about Courses. The conceptual data model for a course consists of Templates, Offerings, Sections and Associations. The business transactions include the simple create, read, update and delete of the Course data model for a single instance. This document contains the definition of the corresponding Web Service based upon SOAP/HTTP messaging.
|
Revision Information
|
Original release.
|
Purpose
|
This document is made available for adoption by the public community at large.
|
Document Location
|
http://www.imsglobal.org/lis/
|
List of Contributors
The following individuals contributed to the development of this document:
Name
|
Organization
|
| Kerry Blinco |
DEEWR (Australia)
|
Kirk Bunte
|
SungardHE (USA)
|
Angus Chan
|
Desire2learn (Canada)
|
Adam Cooper
|
JISC (UK)
|
Michael Feldstein
|
Cengage (USA)
|
Linda Feng
|
Oracle (USA)
|
John Fontaine
|
Blackboard (USA)
|
Chris Hatton
|
Pearson (USA)
|
Karen Kuffner
|
University of Michigan (USA)
|
Zack Leavitt
|
eCollege (USA)
|
Bill Lee
|
Desire2learn (Canada)
|
Richard Moon
|
SungardHE (USA)
|
Mike Parkhill
|
Desire2learn (Canada)
|
Colin Smythe
|
IMS Global Learning Consortium, Inc.
|
Reinhold Staudinger
|
Blackboard (USA)
|
Nick Terrible
|
University of Wisconsin (USA)
|
Jason Zhong
|
SungardHE (USA)
|
Revision History
Version No.
|
Release Date
|
Comments
|
Final Release 1.0
|
30 June 2011
|
The first formal release of the Final Release version of this document.
|
|
|
|
|
|
|
IMS Global Learning Consortium, Inc. (“IMS GLC”) is publishing the information contained
in this document (“Specification”) for purposes of scientific, experimental, and scholarly collaboration only.
IMS GLC makes no warranty or representation regarding the accuracy or completeness of the
Specification.
This material is provided on an “As Is” and “As Available” basis.
The Specification is at all times subject to change and revision without notice.
It is your sole responsibility to evaluate the usefulness, accuracy, and completeness of the Specification as it relates to you.
IMS GLC would appreciate receiving your comments and suggestions.
Please contact IMS GLC through our website at http://www.imsglobal.org.
Please refer to Document Name: IMS GLC CMS v1.0 WSDL/XSD Binding Final Release v1.0
Date: 30 June 2011.