Showing:

Annotations
Diagrams
Facets
Instances
Properties
Source
Used by

5.1 Service Data Model XSD Documentation

Group by:

http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0

Elements
Main schema BulkDataExchangeManagementServiceSyncXSD.xsd
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Annotations
XSD Data File Information
            Author:         Colin Smythe
            Date:           30th June, 2011
            Version:        Final 1.0
            Status:         Final Release
            Description:    The Service realisation of the Bulk Data Exchange Management Service.  The core model consists of
                            an service announcement and a report.  There is a separate data model for the structure of the file 
                            containing the data. This is a part of the IMS Learning Information Services LIS) v2.0 specification.

            History:        Version 1.0: The first formal release of this PSM binding.  This is a new Service specification.

            License:        IPR, License and Distribution Notices

                            This machine readable file is derived from IMS Global Learning Consortium (GLC) specification IMS [spec name] Version [x.x]
                            found at http://www.imsglobal.org/[xxx] and the original IMS GLC schema binding or code base
                            http://www.imsglobal.org/[binding document].

                            Recipients of this document are requested to submit, with their comments, notification of any
                            relevant patent claims or other intellectual property rights of which they may be aware that might be
                            infringed by the schema binding contained in this document.

                            IMS GLC takes no position regarding the validity or scope of any intellectual property or other
                            rights that might be claimed to pertain to the implementation or use of the technology described in this
                            document or the extent to which any license under such rights might or might not be available; neither
                            does it represent that it has made any effort to identify any such rights. Information on IMS GLCs
                            procedures with respect to rights in IMS GLC specifications can be found at the IMS GLC Intellectual Property
                            Rights web page: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf.

                            Copyright (c) IMS Global Learning Consortium 1999-2011. All Rights Reserved.

                            License Notice for Users

                            Users of products or services that include this document are hereby granted a worldwide, royalty-free, 
                            non-exclusive license to use this document. 

                            Distribution Notice for Developers

                            Developers of products or services that are not original incorporators of this document and 
                            have not changed this document, that is, are distributing a software product that incorporates this 
                            document as is from a third-party source other than IMS, are hereby granted permission to copy,
                            display and distribute the contents of this document in any medium for any purpose without fee or 
                            royalty provided that you include this IPR, License and Distribution notice in its entirety on ALL
                            copies, or portions thereof.

                            Developers of products or services that are original incorporators of this document and wish 
                            to provide distribution of this document as is or with modifications and developers of products and 
                            services that are not original incorporators of this document and have changed this document, are
                            required to register with the IMS GLC community on the IMS GLC website as described in the following two
                            paragraphs:-

                            *  If you wish to distribute this document as is, with no modifications, you are hereby granted 
                               permission to copy, display and distribute the contents of this document in any medium for any 
                               purpose without fee or royalty provided that you include this IPR, License and Distribution notice in
                               its entirety on ALL copies, or portions thereof, that you make and you complete a valid license 
                               registration with IMS and receive an email from IMS granting the license. To register, follow the 
                               instructions on the IMS website: http://www.imsglobal.org/specificationdownload.cfm. Once 
                               registered you are granted permission to transfer unlimited distribution rights of this document for the 
                               purposes of third-party or other distribution of your product or service that incorporates this 
                               document as long as this IPR, License and Distribution notice remains in place in its entirety; 

                            *  If you wish to create and distribute a derived work from this document, you are hereby 
                               granted permission to copy, display and distribute the contents of the derived work in any medium for 
                               any purpose without fee or royalty provided that you include this IPR, License and Distribution 
                               notice in its entirety on ALL copies, or portions thereof, that you make and you complete a valid 
                               profile registration with IMS GLC and receive an email from IMS GLC granting the license. To register, follow
                               the instructions on the IMS GLC website: http://www.imsglobal.org/profile/. Once registered you are 
                               granted permission to transfer unlimited distribution rights of the derived work for the purposes of 
                               third-party or other distribution of your product or service that incorporates the derived work as long 
                               as this IPR, License and Distribution notice remains in place in its entirety. 

                            The limited permissions granted above are perpetual and will not be revoked by IMS GLC or its 
                            successors or assigns.

                            THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS
                            EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTERS OWN RISK, AND NEITHER THE CONSORTIUM
                            NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF
                            ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION.

            UML Source Service File Information
            Choreography:     Sync
            Status Object:    StatusInfo

            Source UML File Information
            The source file information must be supplied as an XMI file (without diagram layout information).
            The supported UML authoring tools are:
            (a) Poseidon - v6 (and later)

            Source XSLT File Information
            XSL Generator:    UMLtoWSDLTransformv0p9p5.xsl
            XSLT Processor:   Xalan
            Release:          1.0 Beta 4
            Date:             31st March, 2011

            IMS GLC Auto-generation Binding Tool-kit (I-BAT)
            This file was auto-generated using the IMS GLC Binding Auto-generation Tool-kit (I-BAT).  While every
            attempt has been made to ensure that this tool auto-generates the files correctly, users should be aware
            that this is an experimental tool.  Permission is given to make use of this tool.  IMS GLC makes no
            claim on the materials created by third party users of this tool.  Details on how to use this tool
            are contained in the IMS GLC "I-BAT" Documentation available at the IMS GLC web-site.

            Tool Copyright:  2005-2011 (c) IMS Global Learning Consortium Inc.  All Rights Reserved.
Properties
attribute form default: unqualified
element form default: qualified
version: IMS BDEMS 1.0
[ top ]
Element bdems:imsx_codeMajor
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_CodeMajor.Type
Type bdems:imsx_CodeMajor.Type
Properties
content: simple
Facets
enumeration success
enumeration processing
enumeration failure
enumeration unsupported
Used by
Source
<xs:element name="imsx_codeMajor" type="bdems:imsx_CodeMajor.Type"/>
[ top ]
Element bdems:imsx_severity
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_Severity.Type
Type bdems:imsx_Severity.Type
Properties
content: simple
Facets
enumeration status
enumeration warning
enumeration error
Used by
Source
<xs:element name="imsx_severity" type="bdems:imsx_Severity.Type"/>
[ top ]
Element bdems:imsx_codeMinorFieldValue
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_CodeMinorValue.Type
Type bdems:imsx_CodeMinorValue.Type
Properties
content: simple
Facets
enumeration fullsuccess
enumeration invaliddata
enumeration invalidtransactionid
enumeration incompletedata
enumeration invalidurl
enumeration unsupportedservices
enumeration unsupportedoperations
enumeration expireddate
enumeration savepointerror
enumeration savepointsyncerror
enumeration targetisbusy
enumeration unauthorizedrequest
enumeration linkfailure
enumeration unsupportedLIS
enumeration unsupportedLISoperation
enumeration unknownservice
enumeration unknownoperation
Used by
Source
<xs:element name="imsx_codeMinorFieldValue" type="bdems:imsx_CodeMinorValue.Type"/>
[ top ]
Element bdems:imsx_version
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_VersionValue.Type
Type bdems:imsx_VersionValue.Type
Properties
content: simple
Facets
enumeration V1.0
Used by
Source
<xs:element name="imsx_version" type="bdems:imsx_VersionValue.Type"/>
[ top ]
Element bdems:serviceName
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#ServiceNameValue.Type
Type bdems:ServiceNameValue.Type
Properties
content: simple
Facets
enumeration pmsv2p0
enumeration gmsv2p0
enumeration mmsv2p0
enumeration cmsv1p0
enumeration omsv1p0
Used by
Source
<xs:element name="serviceName" type="bdems:ServiceNameValue.Type"/>
[ top ]
Element bdems:interfaceName
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#InterfaceNameValue.Type
Type bdems:InterfaceNameValue.Type
Properties
content: simple
Facets
enumeration personmanager
enumeration groupmanager
enumeration membershipmanager
enumeration coursetemplatemanager
enumeration courseofferingmanager
enumeration coursesectionmanager
enumeration sectionassociationmanager
enumeration lineitemmanager
enumeration resultmanager
enumeration resultvaluemanager
Used by
Source
<xs:element name="interfaceName" type="bdems:InterfaceNameValue.Type"/>
[ top ]
Element bdems:checkSum
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:hexBinary
Properties
content: simple
Used by
Source
<xs:element name="checkSum" type="xs:hexBinary"/>
[ top ]
Element bdems:expiryDate
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:dateTime
Properties
content: simple
Used by
Source
<xs:element name="expiryDate" type="xs:dateTime"/>
[ top ]
Element bdems:failureCode
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:normalizedString
Properties
content: simple
Used by
Source
<xs:element name="failureCode" type="xs:normalizedString"/>
[ top ]
Element bdems:failureDescription
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:normalizedString
Properties
content: simple
Used by
Source
<xs:element name="failureDescription" type="xs:normalizedString"/>
[ top ]
Element bdems:failureReportVocabulary
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:anyURI
Properties
content: simple
Used by
Source
<xs:element name="failureReportVocabulary" type="xs:anyURI"/>
[ top ]
Element bdems:filterType
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:normalizedString
Properties
content: simple
Used by
Complex Type bdems:FilterRule.Type
Source
<xs:element name="filterType" type="xs:normalizedString"/>
[ top ]
Element bdems:filterTypeVocabulary
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:anyURI
Properties
content: simple
Used by
Complex Type bdems:FilterRule.Type
Source
<xs:element name="filterTypeVocabulary" type="xs:anyURI"/>
[ top ]
Element bdems:filterValue
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:normalizedString
Properties
content: simple
Used by
Complex Type bdems:FilterRule.Type
Source
<xs:element name="filterValue" type="xs:normalizedString"/>
[ top ]
Element bdems:filterValueVocabulary
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:anyURI
Properties
content: simple
Used by
Complex Type bdems:FilterRule.Type
Source
<xs:element name="filterValueVocabulary" type="xs:anyURI"/>
[ top ]
Element bdems:imsx_codeMinorFieldName
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:string
Properties
content: simple
default: TargetEndSystem
Used by
Source
<xs:element name="imsx_codeMinorFieldName" type="xs:string" default="TargetEndSystem"/>
[ top ]
Element bdems:imsx_description
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:string
Properties
content: simple
Used by
Source
<xs:element name="imsx_description" type="xs:string"/>
[ top ]
Element bdems:imsx_messageIdentifier
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:string
Properties
content: simple
Used by
Source
<xs:element name="imsx_messageIdentifier" type="xs:string"/>
[ top ]
Element bdems:imsx_messageRefIdentifier
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:string
Properties
content: simple
Used by
Source
<xs:element name="imsx_messageRefIdentifier" type="xs:string"/>
[ top ]
Element bdems:imsx_operationRefIdentifier
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:string
Properties
content: simple
Used by
Source
<xs:element name="imsx_operationRefIdentifier" type="xs:string"/>
[ top ]
Element bdems:noofFailure
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:int
Properties
content: simple
Used by
Source
<xs:element name="noofFailure" type="xs:int"/>
[ top ]
Element bdems:noofFullSuccess
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:int
Properties
content: simple
Used by
Source
<xs:element name="noofFullSuccess" type="xs:int"/>
[ top ]
Element bdems:noofPartialSuccess
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:int
Properties
content: simple
Used by
Source
<xs:element name="noofPartialSuccess" type="xs:int"/>
[ top ]
Element bdems:noofTotalFailure
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:int
Properties
content: simple
Used by
Source
<xs:element name="noofTotalFailure" type="xs:int"/>
[ top ]
Element bdems:noofTotalFullSuccess
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:int
Properties
content: simple
Used by
Source
<xs:element name="noofTotalFullSuccess" type="xs:int"/>
[ top ]
Element bdems:noofTotalPartialSuccess
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:int
Properties
content: simple
Used by
Source
<xs:element name="noofTotalPartialSuccess" type="xs:int"/>
[ top ]
Element bdems:operationName
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:normalizedString
Properties
content: simple
Used by
Source
<xs:element name="operationName" type="xs:normalizedString"/>
[ top ]
Element bdems:totalSize
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:integer
Properties
content: simple
Used by
Source
<xs:element name="totalSize" type="xs:integer"/>
[ top ]
Element bdems:transactionFailStatus
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:normalizedString
Properties
content: simple
Used by
Source
<xs:element name="transactionFailStatus" type="xs:normalizedString"/>
[ top ]
Element bdems:transactionFailStatusVocabulary
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:anyURI
Properties
content: simple
Used by
Source
<xs:element name="transactionFailStatusVocabulary" type="xs:anyURI"/>
[ top ]
Element bdems:url
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#URL.Type
Type bdems:URL.Type
Properties
content: simple
Facets
whiteSpace preserve
minLength 1
maxLength 4096
Used by
Source
<xs:element name="url" type="bdems:URL.Type"/>
[ top ]
Element bdems:savePoint
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#SequenceIdentifier.Type
Type bdems:SequenceIdentifier.Type
Properties
content: simple
Used by
Source
<xs:element name="savePoint" type="bdems:SequenceIdentifier.Type"/>
[ top ]
Element bdems:serviceSet
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#serviceRecord BulkDataExchangeManagementServiceSyncXSD.tmp#ServiceSet.Type
Type bdems:ServiceSet.Type
Properties
content: complex
mixed: false
Used by
Model bdems:serviceRecord+
Children bdems:serviceRecord
Instance
<bdems:serviceSet>
  <bdems:serviceRecord>{1,unbounded}</bdems:serviceRecord>
</bdems:serviceSet>
Source
<xs:element name="serviceSet" type="bdems:ServiceSet.Type"/>
[ top ]
Element bdems:serviceRecord
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#serviceName BulkDataExchangeManagementServiceSyncXSD.tmp#interfaceName BulkDataExchangeManagementServiceSyncXSD.tmp#operationSet BulkDataExchangeManagementServiceSyncXSD.tmp#ServiceRecord.Type
Type bdems:ServiceRecord.Type
Properties
content: complex
mixed: false
Used by
Complex Type bdems:ServiceSet.Type
Model bdems:serviceName , bdems:interfaceName , bdems:operationSet
Children bdems:interfaceName, bdems:operationSet, bdems:serviceName
Instance
<bdems:serviceRecord>
  <bdems:serviceName>{1,1}</bdems:serviceName>
  <bdems:interfaceName>{1,1}</bdems:interfaceName>
  <bdems:operationSet>{1,1}</bdems:operationSet>
</bdems:serviceRecord>
Source
<xs:element name="serviceRecord" type="bdems:ServiceRecord.Type"/>
[ top ]
Element bdems:operationSet
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#operationName BulkDataExchangeManagementServiceSyncXSD.tmp#OperationSet.Type
Type bdems:OperationSet.Type
Properties
content: complex
mixed: false
Used by
Model bdems:operationName+
Children bdems:operationName
Instance
<bdems:operationSet>
  <bdems:operationName>{1,unbounded}</bdems:operationName>
</bdems:operationSet>
Source
<xs:element name="operationSet" type="bdems:OperationSet.Type"/>
[ top ]
Element bdems:bulkBlockManifestId
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#LUID.Type
Type bdems:LUID.Type
Properties
content: simple
Used by
Source
<xs:element name="bulkBlockManifestId" type="bdems:LUID.Type"/>
[ top ]
Element bdems:bulkBlockDataFile
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#url BulkDataExchangeManagementServiceSyncXSD.tmp#checkSum BulkDataExchangeManagementServiceSyncXSD.tmp#totalSize BulkDataExchangeManagementServiceSyncXSD.tmp#savePoint BulkDataExchangeManagementServiceSyncXSD.tmp#serviceSet BulkDataExchangeManagementServiceSyncXSD.tmp#BulkBlockDataFile.Type
Type bdems:BulkBlockDataFile.Type
Properties
content: complex
mixed: false
Used by
Model bdems:url , bdems:checkSum , bdems:totalSize , bdems:savePoint , bdems:serviceSet
Children bdems:checkSum, bdems:savePoint, bdems:serviceSet, bdems:totalSize, bdems:url
Instance
<bdems:bulkBlockDataFile>
  <bdems:url>{1,1}</bdems:url>
  <bdems:checkSum>{1,1}</bdems:checkSum>
  <bdems:totalSize>{1,1}</bdems:totalSize>
  <bdems:savePoint>{1,1}</bdems:savePoint>
  <bdems:serviceSet>{1,1}</bdems:serviceSet>
</bdems:bulkBlockDataFile>
Source
<xs:element name="bulkBlockDataFile" type="bdems:BulkBlockDataFile.Type"/>
[ top ]
Element bdems:bulkBlockManifestIdRef
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#LUID.Type
Type bdems:LUID.Type
Properties
content: simple
Used by
Source
<xs:element name="bulkBlockManifestIdRef" type="bdems:LUID.Type"/>
[ top ]
Element bdems:reportSummary
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#noofTotalFullSuccess BulkDataExchangeManagementServiceSyncXSD.tmp#noofTotalPartialSuccess BulkDataExchangeManagementServiceSyncXSD.tmp#noofTotalFailure BulkDataExchangeManagementServiceSyncXSD.tmp#interfaceSummaryReport BulkDataExchangeManagementServiceSyncXSD.tmp#ReportSummary.Type
Type bdems:ReportSummary.Type
Properties
content: complex
mixed: false
Used by
Model bdems:noofTotalFullSuccess , bdems:noofTotalPartialSuccess , bdems:noofTotalFailure , bdems:interfaceSummaryReport*
Children bdems:interfaceSummaryReport, bdems:noofTotalFailure, bdems:noofTotalFullSuccess, bdems:noofTotalPartialSuccess
Instance
<bdems:reportSummary>
  <bdems:noofTotalFullSuccess>{1,1}</bdems:noofTotalFullSuccess>
  <bdems:noofTotalPartialSuccess>{1,1}</bdems:noofTotalPartialSuccess>
  <bdems:noofTotalFailure>{1,1}</bdems:noofTotalFailure>
  <bdems:interfaceSummaryReport>{0,unbounded}</bdems:interfaceSummaryReport>
</bdems:reportSummary>
Source
<xs:element name="reportSummary" type="bdems:ReportSummary.Type"/>
[ top ]
Element bdems:interfaceSummaryReport
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#interfaceName BulkDataExchangeManagementServiceSyncXSD.tmp#noofFullSuccess BulkDataExchangeManagementServiceSyncXSD.tmp#noofPartialSuccess BulkDataExchangeManagementServiceSyncXSD.tmp#noofFailure BulkDataExchangeManagementServiceSyncXSD.tmp#InterfaceSummaryReport.Type
Type bdems:InterfaceSummaryReport.Type
Properties
content: complex
mixed: false
Used by
Model bdems:interfaceName , bdems:noofFullSuccess , bdems:noofPartialSuccess , bdems:noofFailure
Children bdems:interfaceName, bdems:noofFailure, bdems:noofFullSuccess, bdems:noofPartialSuccess
Instance
<bdems:interfaceSummaryReport>
  <bdems:interfaceName>{1,1}</bdems:interfaceName>
  <bdems:noofFullSuccess>{1,1}</bdems:noofFullSuccess>
  <bdems:noofPartialSuccess>{1,1}</bdems:noofPartialSuccess>
  <bdems:noofFailure>{1,1}</bdems:noofFailure>
</bdems:interfaceSummaryReport>
Source
<xs:element name="interfaceSummaryReport" type="bdems:InterfaceSummaryReport.Type"/>
[ top ]
Element bdems:transactionReport
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#failureReport BulkDataExchangeManagementServiceSyncXSD.tmp#ReportFailureDetail.Type
Type bdems:ReportFailureDetail.Type
Properties
content: complex
mixed: false
Used by
Model bdems:failureReport+
Children bdems:failureReport
Instance
<bdems:transactionReport>
  <bdems:failureReport>{1,unbounded}</bdems:failureReport>
</bdems:transactionReport>
Source
<xs:element name="transactionReport" type="bdems:ReportFailureDetail.Type"/>
[ top ]
Element bdems:failureReport
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#failureReportVocabulary BulkDataExchangeManagementServiceSyncXSD.tmp#failureCode BulkDataExchangeManagementServiceSyncXSD.tmp#failureDescription BulkDataExchangeManagementServiceSyncXSD.tmp#FailureReport.Type
Type bdems:FailureReport.Type
Properties
content: complex
mixed: false
Used by
Model bdems:failureReportVocabulary , bdems:failureCode , bdems:failureDescription
Children bdems:failureCode, bdems:failureDescription, bdems:failureReportVocabulary
Instance
<bdems:failureReport>
  <bdems:failureReportVocabulary>{1,1}</bdems:failureReportVocabulary>
  <bdems:failureCode>{1,1}</bdems:failureCode>
  <bdems:failureDescription>{1,1}</bdems:failureDescription>
</bdems:failureReport>
Source
<xs:element name="failureReport" type="bdems:FailureReport.Type"/>
[ top ]
Element bdems:filterRule
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#filterTypeVocabulary BulkDataExchangeManagementServiceSyncXSD.tmp#filterType BulkDataExchangeManagementServiceSyncXSD.tmp#filterValueVocabulary BulkDataExchangeManagementServiceSyncXSD.tmp#filterValue BulkDataExchangeManagementServiceSyncXSD.tmp#FilterRule.Type
Type bdems:FilterRule.Type
Properties
content: complex
mixed: false
Used by
Model bdems:filterTypeVocabulary , bdems:filterType , bdems:filterValueVocabulary{0,1} , bdems:filterValue
Children bdems:filterType, bdems:filterTypeVocabulary, bdems:filterValue, bdems:filterValueVocabulary
Instance
<bdems:filterRule>
  <bdems:filterTypeVocabulary>{1,1}</bdems:filterTypeVocabulary>
  <bdems:filterType>{1,1}</bdems:filterType>
  <bdems:filterValueVocabulary>{0,1}</bdems:filterValueVocabulary>
  <bdems:filterValue>{1,1}</bdems:filterValue>
</bdems:filterRule>
Source
<xs:element name="filterRule" type="bdems:FilterRule.Type"/>
[ top ]
Element bdems:imsx_codeMinorField
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_codeMinorFieldName BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_codeMinorFieldValue BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_CodeMinorField.Type
Type bdems:imsx_CodeMinorField.Type
Properties
content: complex
mixed: false
Used by
Model bdems:imsx_codeMinorFieldName , bdems:imsx_codeMinorFieldValue
Children bdems:imsx_codeMinorFieldName, bdems:imsx_codeMinorFieldValue
Instance
<bdems:imsx_codeMinorField>
  <bdems:imsx_codeMinorFieldName>{1,1}</bdems:imsx_codeMinorFieldName>
  <bdems:imsx_codeMinorFieldValue>{1,1}</bdems:imsx_codeMinorFieldValue>
</bdems:imsx_codeMinorField>
Source
<xs:element name="imsx_codeMinorField" type="bdems:imsx_CodeMinorField.Type"/>
[ top ]
Element bdems:imsx_statusInfo
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_codeMajor BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_severity BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_messageRefIdentifier BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_operationRefIdentifier BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_description BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_codeMinor BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_StatusInfo.Type
Type bdems:imsx_StatusInfo.Type
Properties
content: complex
mixed: false
Used by
Model bdems:imsx_codeMajor , bdems:imsx_severity , bdems:imsx_messageRefIdentifier , bdems:imsx_operationRefIdentifier* , bdems:imsx_description{0,1} , bdems:imsx_codeMinor{0,1}
Children bdems:imsx_codeMajor, bdems:imsx_codeMinor, bdems:imsx_description, bdems:imsx_messageRefIdentifier, bdems:imsx_operationRefIdentifier, bdems:imsx_severity
Instance
<bdems:imsx_statusInfo>
  <bdems:imsx_codeMajor>{1,1}</bdems:imsx_codeMajor>
  <bdems:imsx_severity>{1,1}</bdems:imsx_severity>
  <bdems:imsx_messageRefIdentifier>{1,1}</bdems:imsx_messageRefIdentifier>
  <bdems:imsx_operationRefIdentifier>{0,unbounded}</bdems:imsx_operationRefIdentifier>
  <bdems:imsx_description>{0,1}</bdems:imsx_description>
  <bdems:imsx_codeMinor>{0,1}</bdems:imsx_codeMinor>
</bdems:imsx_statusInfo>
Source
<xs:element name="imsx_statusInfo" type="bdems:imsx_StatusInfo.Type"/>
[ top ]
Element bdems:imsx_codeMinor
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_codeMinorField BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_CodeMinor.Type
Type bdems:imsx_CodeMinor.Type
Properties
content: complex
mixed: false
Used by
Model bdems:imsx_codeMinorField+
Children bdems:imsx_codeMinorField
Instance
<bdems:imsx_codeMinor>
  <bdems:imsx_codeMinorField>{1,unbounded}</bdems:imsx_codeMinorField>
</bdems:imsx_codeMinor>
Source
<xs:element name="imsx_codeMinor" type="bdems:imsx_CodeMinor.Type"/>
[ top ]
Element bdems:personInterface
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#operationName BulkDataExchangeManagementServiceSyncXSD.tmp#PersonInterfaceOperations.Type
Type bdems:PersonInterfaceOperations.Type
Properties
content: complex
mixed: false
Used by
Model bdems:operationName+
Children bdems:operationName
Instance
<bdems:personInterface>
  <bdems:operationName>{1,unbounded}</bdems:operationName>
</bdems:personInterface>
Source
<xs:element name="personInterface" type="bdems:PersonInterfaceOperations.Type"/>
[ top ]
Element bdems:groupInterface
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#operationName BulkDataExchangeManagementServiceSyncXSD.tmp#GroupInterfaceOperations.Type
Type bdems:GroupInterfaceOperations.Type
Properties
content: complex
mixed: false
Used by
Model bdems:operationName+
Children bdems:operationName
Instance
<bdems:groupInterface>
  <bdems:operationName>{1,unbounded}</bdems:operationName>
</bdems:groupInterface>
Source
<xs:element name="groupInterface" type="bdems:GroupInterfaceOperations.Type"/>
[ top ]
Element bdems:membershipInterface
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#operationName BulkDataExchangeManagementServiceSyncXSD.tmp#MembershipInterfaceOperations.Type
Type bdems:MembershipInterfaceOperations.Type
Properties
content: complex
mixed: false
Used by
Model bdems:operationName+
Children bdems:operationName
Instance
<bdems:membershipInterface>
  <bdems:operationName>{1,unbounded}</bdems:operationName>
</bdems:membershipInterface>
Source
<xs:element name="membershipInterface" type="bdems:MembershipInterfaceOperations.Type"/>
[ top ]
Element bdems:templateInterface
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#operationName BulkDataExchangeManagementServiceSyncXSD.tmp#TemplateInterfaceOperations.Type
Type bdems:TemplateInterfaceOperations.Type
Properties
content: complex
mixed: false
Used by
Model bdems:operationName+
Children bdems:operationName
Instance
<bdems:templateInterface>
  <bdems:operationName>{1,unbounded}</bdems:operationName>
</bdems:templateInterface>
Source
<xs:element name="templateInterface" type="bdems:TemplateInterfaceOperations.Type"/>
[ top ]
Element bdems:offeringInterface
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#operationName BulkDataExchangeManagementServiceSyncXSD.tmp#OfferingInterfaceOperations.Type
Type bdems:OfferingInterfaceOperations.Type
Properties
content: complex
mixed: false
Used by
Model bdems:operationName+
Children bdems:operationName
Instance
<bdems:offeringInterface>
  <bdems:operationName>{1,unbounded}</bdems:operationName>
</bdems:offeringInterface>
Source
<xs:element name="offeringInterface" type="bdems:OfferingInterfaceOperations.Type"/>
[ top ]
Element bdems:sectionInterface
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#operationName BulkDataExchangeManagementServiceSyncXSD.tmp#SectionInterfaceOperations.Type
Type bdems:SectionInterfaceOperations.Type
Properties
content: complex
mixed: false
Used by
Model bdems:operationName+
Children bdems:operationName
Instance
<bdems:sectionInterface>
  <bdems:operationName>{1,unbounded}</bdems:operationName>
</bdems:sectionInterface>
Source
<xs:element name="sectionInterface" type="bdems:SectionInterfaceOperations.Type"/>
[ top ]
Element bdems:associationInterface
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#operationName BulkDataExchangeManagementServiceSyncXSD.tmp#AssociationInterfaceOperations.Type
Type bdems:AssociationInterfaceOperations.Type
Properties
content: complex
mixed: false
Used by
Model bdems:operationName+
Children bdems:operationName
Instance
<bdems:associationInterface>
  <bdems:operationName>{1,unbounded}</bdems:operationName>
</bdems:associationInterface>
Source
<xs:element name="associationInterface" type="bdems:AssociationInterfaceOperations.Type"/>
[ top ]
Element bdems:lineItemInterface
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#operationName BulkDataExchangeManagementServiceSyncXSD.tmp#LineItemInterfaceOperations.Type
Type bdems:LineItemInterfaceOperations.Type
Properties
content: complex
mixed: false
Used by
Model bdems:operationName+
Children bdems:operationName
Instance
<bdems:lineItemInterface>
  <bdems:operationName>{1,unbounded}</bdems:operationName>
</bdems:lineItemInterface>
Source
<xs:element name="lineItemInterface" type="bdems:LineItemInterfaceOperations.Type"/>
[ top ]
Element bdems:resultInterface
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#operationName BulkDataExchangeManagementServiceSyncXSD.tmp#ResultInterfaceOperations.Type
Type bdems:ResultInterfaceOperations.Type
Properties
content: complex
mixed: false
Used by
Model bdems:operationName+
Children bdems:operationName
Instance
<bdems:resultInterface>
  <bdems:operationName>{1,unbounded}</bdems:operationName>
</bdems:resultInterface>
Source
<xs:element name="resultInterface" type="bdems:ResultInterfaceOperations.Type"/>
[ top ]
Element bdems:resultvalueInterface
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#operationName BulkDataExchangeManagementServiceSyncXSD.tmp#ResultValueInterfaceOperations.Type
Type bdems:ResultValueInterfaceOperations.Type
Properties
content: complex
mixed: false
Used by
Model bdems:operationName+
Children bdems:operationName
Instance
<bdems:resultvalueInterface>
  <bdems:operationName>{1,unbounded}</bdems:operationName>
</bdems:resultvalueInterface>
Source
<xs:element name="resultvalueInterface" type="bdems:ResultValueInterfaceOperations.Type"/>
[ top ]
Element bdems:transactionOpIdentifierRef
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#LUID.Type
Type bdems:LUID.Type
Properties
content: simple
Used by
Source
<xs:element name="transactionOpIdentifierRef" type="bdems:LUID.Type"/>
[ top ]
Element bdems:transactionId
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#LUID.Type
Type bdems:LUID.Type
Properties
content: simple
Used by
Source
<xs:element name="transactionId" type="bdems:LUID.Type"/>
[ top ]
Element bdems:bulkBlockManifest
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#bulkBlockManifestId BulkDataExchangeManagementServiceSyncXSD.tmp#expiryDate BulkDataExchangeManagementServiceSyncXSD.tmp#bulkBlockDataFile BulkDataExchangeManagementServiceSyncXSD.tmp#BulkBlockManifest.Type
Type bdems:BulkBlockManifest.Type
Properties
content: complex
mixed: false
Used by
Model bdems:bulkBlockManifestId , bdems:expiryDate , bdems:bulkBlockDataFile+
Children bdems:bulkBlockDataFile, bdems:bulkBlockManifestId, bdems:expiryDate
Instance
<bdems:bulkBlockManifest>
  <bdems:bulkBlockManifestId>{1,1}</bdems:bulkBlockManifestId>
  <bdems:expiryDate>{1,1}</bdems:expiryDate>
  <bdems:bulkBlockDataFile>{1,unbounded}</bdems:bulkBlockDataFile>
</bdems:bulkBlockManifest>
Source
<xs:element name="bulkBlockManifest" type="bdems:BulkBlockManifest.Type"/>
[ top ]
Element bdems:supportedServices
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#personInterface BulkDataExchangeManagementServiceSyncXSD.tmp#groupInterface BulkDataExchangeManagementServiceSyncXSD.tmp#membershipInterface BulkDataExchangeManagementServiceSyncXSD.tmp#templateInterface BulkDataExchangeManagementServiceSyncXSD.tmp#offeringInterface BulkDataExchangeManagementServiceSyncXSD.tmp#sectionInterface BulkDataExchangeManagementServiceSyncXSD.tmp#associationInterface BulkDataExchangeManagementServiceSyncXSD.tmp#lineItemInterface BulkDataExchangeManagementServiceSyncXSD.tmp#resultInterface BulkDataExchangeManagementServiceSyncXSD.tmp#resultvalueInterface BulkDataExchangeManagementServiceSyncXSD.tmp#SupportedServices.Type
Type bdems:SupportedServices.Type
Properties
content: complex
mixed: false
Used by
Model bdems:personInterface{0,1} , bdems:groupInterface{0,1} , bdems:membershipInterface{0,1} , bdems:templateInterface{0,1} , bdems:offeringInterface{0,1} , bdems:sectionInterface{0,1} , bdems:associationInterface{0,1} , bdems:lineItemInterface{0,1} , bdems:resultInterface{0,1} , bdems:resultvalueInterface{0,1}
Children bdems:associationInterface, bdems:groupInterface, bdems:lineItemInterface, bdems:membershipInterface, bdems:offeringInterface, bdems:personInterface, bdems:resultInterface, bdems:resultvalueInterface, bdems:sectionInterface, bdems:templateInterface
Instance
<bdems:supportedServices>
  <bdems:personInterface>{0,1}</bdems:personInterface>
  <bdems:groupInterface>{0,1}</bdems:groupInterface>
  <bdems:membershipInterface>{0,1}</bdems:membershipInterface>
  <bdems:templateInterface>{0,1}</bdems:templateInterface>
  <bdems:offeringInterface>{0,1}</bdems:offeringInterface>
  <bdems:sectionInterface>{0,1}</bdems:sectionInterface>
  <bdems:associationInterface>{0,1}</bdems:associationInterface>
  <bdems:lineItemInterface>{0,1}</bdems:lineItemInterface>
  <bdems:resultInterface>{0,1}</bdems:resultInterface>
  <bdems:resultvalueInterface>{0,1}</bdems:resultvalueInterface>
</bdems:supportedServices>
Source
<xs:element name="supportedServices" type="bdems:SupportedServices.Type"/>
[ top ]
Element bdems:bulkBlockReport
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#bulkBlockManifestIdRef BulkDataExchangeManagementServiceSyncXSD.tmp#reportSummary BulkDataExchangeManagementServiceSyncXSD.tmp#transactionReport BulkDataExchangeManagementServiceSyncXSD.tmp#BulkBlockReport.Type
Type bdems:BulkBlockReport.Type
Properties
content: complex
mixed: false
Used by
Model bdems:bulkBlockManifestIdRef , bdems:reportSummary , bdems:transactionReport*
Children bdems:bulkBlockManifestIdRef, bdems:reportSummary, bdems:transactionReport
Instance
<bdems:bulkBlockReport>
  <bdems:bulkBlockManifestIdRef>{1,1}</bdems:bulkBlockManifestIdRef>
  <bdems:reportSummary>{1,1}</bdems:reportSummary>
  <bdems:transactionReport>{0,unbounded}</bdems:transactionReport>
</bdems:bulkBlockReport>
Source
<xs:element name="bulkBlockReport" type="bdems:BulkBlockReport.Type"/>
[ top ]
Element bdems:filter
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#filterRule BulkDataExchangeManagementServiceSyncXSD.tmp#FilterObject.Type
Type bdems:FilterObject.Type
Properties
content: complex
mixed: false
Used by
Model bdems:filterRule+
Children bdems:filterRule
Instance
<bdems:filter>
  <bdems:filterRule>{1,unbounded}</bdems:filterRule>
</bdems:filter>
Source
<xs:element name="filter" type="bdems:FilterObject.Type"/>
[ top ]
Element bdems:announceBulkDataExchangeRequest
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#transactionId BulkDataExchangeManagementServiceSyncXSD.tmp#bulkBlockManifest
Properties
content: complex
Model bdems:transactionId , bdems:bulkBlockManifest
Children bdems:bulkBlockManifest, bdems:transactionId
Instance
<bdems:announceBulkDataExchangeRequest>
  <bdems:transactionId>{1,1}</bdems:transactionId>
  <bdems:bulkBlockManifest>{1,1}</bdems:bulkBlockManifest>
</bdems:announceBulkDataExchangeRequest>
Source
<xs:element name="announceBulkDataExchangeRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="bdems:transactionId"/>
      <xs:element ref="bdems:bulkBlockManifest"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element bdems:announceBulkDataExchangeResponse
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#supportedServices
Properties
content: complex
Model bdems:supportedServices{0,1}
Children bdems:supportedServices
Instance
<bdems:announceBulkDataExchangeResponse>
  <bdems:supportedServices>{0,1}</bdems:supportedServices>
</bdems:announceBulkDataExchangeResponse>
Source
<xs:element name="announceBulkDataExchangeResponse">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="bdems:supportedServices" minOccurs="0" maxOccurs="1"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element bdems:announceFailureBulkDataExchangeRequest
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#transactionId BulkDataExchangeManagementServiceSyncXSD.tmp#failureReport
Properties
content: complex
Model bdems:transactionId , bdems:failureReport
Children bdems:failureReport, bdems:transactionId
Instance
<bdems:announceFailureBulkDataExchangeRequest>
  <bdems:transactionId>{1,1}</bdems:transactionId>
  <bdems:failureReport>{1,1}</bdems:failureReport>
</bdems:announceFailureBulkDataExchangeRequest>
Source
<xs:element name="announceFailureBulkDataExchangeRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="bdems:transactionId"/>
      <xs:element ref="bdems:failureReport"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element bdems:announceFailureBulkDataExchangeResponse
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Source
<xs:element name="announceFailureBulkDataExchangeResponse"/>
[ top ]
Element bdems:reportBulkDataExchangeRequest
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#transactionId BulkDataExchangeManagementServiceSyncXSD.tmp#bulkBlockReport
Properties
content: complex
Model bdems:transactionId , bdems:bulkBlockReport
Children bdems:bulkBlockReport, bdems:transactionId
Instance
<bdems:reportBulkDataExchangeRequest>
  <bdems:transactionId>{1,1}</bdems:transactionId>
  <bdems:bulkBlockReport>{1,1}</bdems:bulkBlockReport>
</bdems:reportBulkDataExchangeRequest>
Source
<xs:element name="reportBulkDataExchangeRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="bdems:transactionId"/>
      <xs:element ref="bdems:bulkBlockReport"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element bdems:reportBulkDataExchangeResponse
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Source
<xs:element name="reportBulkDataExchangeResponse"/>
[ top ]
Element bdems:requestBulkDataExchangeRequest
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#transactionId BulkDataExchangeManagementServiceSyncXSD.tmp#filter
Properties
content: complex
Model bdems:transactionId , bdems:filter
Children bdems:filter, bdems:transactionId
Instance
<bdems:requestBulkDataExchangeRequest>
  <bdems:transactionId>{1,1}</bdems:transactionId>
  <bdems:filter>{1,1}</bdems:filter>
</bdems:requestBulkDataExchangeRequest>
Source
<xs:element name="requestBulkDataExchangeRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="bdems:transactionId"/>
      <xs:element ref="bdems:filter"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element bdems:requestBulkDataExchangeResponse
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#supportedServices
Properties
content: complex
Model bdems:supportedServices{0,1}
Children bdems:supportedServices
Instance
<bdems:requestBulkDataExchangeResponse>
  <bdems:supportedServices>{0,1}</bdems:supportedServices>
</bdems:requestBulkDataExchangeResponse>
Source
<xs:element name="requestBulkDataExchangeResponse">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="bdems:supportedServices" minOccurs="0" maxOccurs="1"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element bdems:ignoreBulkDataExchangeRequest
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#transactionId
Properties
content: complex
Model bdems:transactionId
Children bdems:transactionId
Instance
<bdems:ignoreBulkDataExchangeRequest>
  <bdems:transactionId>{1,1}</bdems:transactionId>
</bdems:ignoreBulkDataExchangeRequest>
Source
<xs:element name="ignoreBulkDataExchangeRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="bdems:transactionId"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element bdems:ignoreBulkDataExchangeResponse
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Source
<xs:element name="ignoreBulkDataExchangeResponse"/>
[ top ]
Element bdems:cancelBulkDataExchangeRequest
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#transactionId
Properties
content: complex
Model bdems:transactionId
Children bdems:transactionId
Instance
<bdems:cancelBulkDataExchangeRequest>
  <bdems:transactionId>{1,1}</bdems:transactionId>
</bdems:cancelBulkDataExchangeRequest>
Source
<xs:element name="cancelBulkDataExchangeRequest">
  <xs:complexType>
    <xs:sequence>
      <xs:element ref="bdems:transactionId"/>
    </xs:sequence>
  </xs:complexType>
</xs:element>
[ top ]
Element bdems:cancelBulkDataExchangeResponse
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Source
<xs:element name="cancelBulkDataExchangeResponse"/>
[ top ]
Element bdems:imsx_syncRequestHeaderInfo
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_version BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_messageIdentifier BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_RequestHeaderInfo.Type
Type bdems:imsx_RequestHeaderInfo.Type
Properties
content: complex
mixed: false
Model bdems:imsx_version , bdems:imsx_messageIdentifier
Children bdems:imsx_messageIdentifier, bdems:imsx_version
Instance
<bdems:imsx_syncRequestHeaderInfo>
  <bdems:imsx_version>{1,1}</bdems:imsx_version>
  <bdems:imsx_messageIdentifier>{1,1}</bdems:imsx_messageIdentifier>
</bdems:imsx_syncRequestHeaderInfo>
Source
<xs:element name="imsx_syncRequestHeaderInfo" type="bdems:imsx_RequestHeaderInfo.Type"/>
[ top ]
Element bdems:imsx_syncResponseHeaderInfo
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_version BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_messageIdentifier BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_statusInfo BulkDataExchangeManagementServiceSyncXSD.tmp#imsx_ResponseHeaderInfo.Type
Type bdems:imsx_ResponseHeaderInfo.Type
Properties
content: complex
mixed: false
Model bdems:imsx_version , bdems:imsx_messageIdentifier , bdems:imsx_statusInfo
Children bdems:imsx_messageIdentifier, bdems:imsx_statusInfo, bdems:imsx_version
Instance
<bdems:imsx_syncResponseHeaderInfo>
  <bdems:imsx_version>{1,1}</bdems:imsx_version>
  <bdems:imsx_messageIdentifier>{1,1}</bdems:imsx_messageIdentifier>
  <bdems:imsx_statusInfo>{1,1}</bdems:imsx_statusInfo>
</bdems:imsx_syncResponseHeaderInfo>
Source
<xs:element name="imsx_syncResponseHeaderInfo" type="bdems:imsx_ResponseHeaderInfo.Type"/>
[ top ]
Simple Type bdems:imsx_CodeMajor.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration success
enumeration processing
enumeration failure
enumeration unsupported
Used by
Source
<xs:simpleType name="imsx_CodeMajor.Type">
  <xs:restriction base="xs:string">
    <xs:enumeration value="success"/>
    <xs:enumeration value="processing"/>
    <xs:enumeration value="failure"/>
    <xs:enumeration value="unsupported"/>
  </xs:restriction>
</xs:simpleType>
[ top ]
Simple Type bdems:imsx_Severity.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration status
enumeration warning
enumeration error
Used by
Source
<xs:simpleType name="imsx_Severity.Type">
  <xs:restriction base="xs:string">
    <xs:enumeration value="status"/>
    <xs:enumeration value="warning"/>
    <xs:enumeration value="error"/>
  </xs:restriction>
</xs:simpleType>
[ top ]
Simple Type bdems:imsx_CodeMinorValue.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration fullsuccess
enumeration invaliddata
enumeration invalidtransactionid
enumeration incompletedata
enumeration invalidurl
enumeration unsupportedservices
enumeration unsupportedoperations
enumeration expireddate
enumeration savepointerror
enumeration savepointsyncerror
enumeration targetisbusy
enumeration unauthorizedrequest
enumeration linkfailure
enumeration unsupportedLIS
enumeration unsupportedLISoperation
enumeration unknownservice
enumeration unknownoperation
Used by
Source
<xs:simpleType name="imsx_CodeMinorValue.Type">
  <xs:restriction base="xs:string">
    <xs:enumeration value="fullsuccess"/>
    <xs:enumeration value="invaliddata"/>
    <xs:enumeration value="invalidtransactionid"/>
    <xs:enumeration value="incompletedata"/>
    <xs:enumeration value="invalidurl"/>
    <xs:enumeration value="unsupportedservices"/>
    <xs:enumeration value="unsupportedoperations"/>
    <xs:enumeration value="expireddate"/>
    <xs:enumeration value="savepointerror"/>
    <xs:enumeration value="savepointsyncerror"/>
    <xs:enumeration value="targetisbusy"/>
    <xs:enumeration value="unauthorizedrequest"/>
    <xs:enumeration value="linkfailure"/>
    <xs:enumeration value="unsupportedLIS"/>
    <xs:enumeration value="unsupportedLISoperation"/>
    <xs:enumeration value="unknownservice"/>
    <xs:enumeration value="unknownoperation"/>
  </xs:restriction>
</xs:simpleType>
[ top ]
Simple Type bdems:imsx_VersionValue.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration V1.0
Used by
Source
<xs:simpleType name="imsx_VersionValue.Type">
  <xs:restriction base="xs:string">
    <xs:enumeration value="V1.0"/>
  </xs:restriction>
</xs:simpleType>
[ top ]
Simple Type bdems:ServiceNameValue.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration pmsv2p0
enumeration gmsv2p0
enumeration mmsv2p0
enumeration cmsv1p0
enumeration omsv1p0
Used by
Source
<xs:simpleType name="ServiceNameValue.Type">
  <xs:restriction base="xs:string">
    <xs:enumeration value="pmsv2p0"/>
    <xs:enumeration value="gmsv2p0"/>
    <xs:enumeration value="mmsv2p0"/>
    <xs:enumeration value="cmsv1p0"/>
    <xs:enumeration value="omsv1p0"/>
  </xs:restriction>
</xs:simpleType>
[ top ]
Simple Type bdems:InterfaceNameValue.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration personmanager
enumeration groupmanager
enumeration membershipmanager
enumeration coursetemplatemanager
enumeration courseofferingmanager
enumeration coursesectionmanager
enumeration sectionassociationmanager
enumeration lineitemmanager
enumeration resultmanager
enumeration resultvaluemanager
Used by
Source
<xs:simpleType name="InterfaceNameValue.Type">
  <xs:restriction base="xs:string">
    <xs:enumeration value="personmanager"/>
    <xs:enumeration value="groupmanager"/>
    <xs:enumeration value="membershipmanager"/>
    <xs:enumeration value="coursetemplatemanager"/>
    <xs:enumeration value="courseofferingmanager"/>
    <xs:enumeration value="coursesectionmanager"/>
    <xs:enumeration value="sectionassociationmanager"/>
    <xs:enumeration value="lineitemmanager"/>
    <xs:enumeration value="resultmanager"/>
    <xs:enumeration value="resultvaluemanager"/>
  </xs:restriction>
</xs:simpleType>
[ top ]
Simple Type bdems:URL.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type restriction of xs:string
Facets
whiteSpace preserve
minLength 1
maxLength 4096
Used by
Element bdems:url
Source
<xs:simpleType name="URL.Type">
  <xs:restriction base="xs:string">
    <xs:maxLength value="4096"/>
    <xs:minLength value="1"/>
    <xs:whiteSpace value="preserve"/>
  </xs:restriction>
</xs:simpleType>
[ top ]
Simple Type bdems:LUID.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:normalizedString
Used by
Source
<xs:simpleType name="LUID.Type">
  <xs:restriction base="xs:normalizedString"/>
</xs:simpleType>
[ top ]
Simple Type bdems:SequenceIdentifier.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Diagram
Diagram
Type xs:dateTime
Used by
Element bdems:savePoint
Source
<xs:simpleType name="SequenceIdentifier.Type">
  <xs:restriction base="xs:dateTime"/>
</xs:simpleType>
[ top ]
Complex Type bdems:AssociationInterfaceOperations.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Annotations

umldocumentation

The AssociationInterfaceOperations complexType is the container for the list of operations supported for the CMS SectionAssociatione manager interface.
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#operationName
Properties
mixed: false
Used by
Model bdems:operationName+
Children bdems:operationName
Source
<xs:complexType name="AssociationInterfaceOperations.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The AssociationInterfaceOperations complexType is the container for the list of operations supported for the CMS SectionAssociatione manager interface.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element ref="bdems:operationName" minOccurs="1" maxOccurs="unbounded"/>
  </xs:sequence>
</xs:complexType>
[ top ]
Complex Type bdems:BulkBlockDataFile.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Annotations

umldocumentation

The BulkBlockDataFile complextype is the container for all of the information that is specific to an external file. The bulk block data can consist of more than one physical file.
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#url BulkDataExchangeManagementServiceSyncXSD.tmp#checkSum BulkDataExchangeManagementServiceSyncXSD.tmp#totalSize BulkDataExchangeManagementServiceSyncXSD.tmp#savePoint BulkDataExchangeManagementServiceSyncXSD.tmp#serviceSet
Properties
mixed: false
Used by
Model bdems:url , bdems:checkSum , bdems:totalSize , bdems:savePoint , bdems:serviceSet
Children bdems:checkSum, bdems:savePoint, bdems:serviceSet, bdems:totalSize, bdems:url
Source
<xs:complexType name="BulkBlockDataFile.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The BulkBlockDataFile complextype is the container for all of the information that is specific to an external file. The bulk block data can consist of more than one physical file.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element ref="bdems:url" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:checkSum" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:totalSize" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:savePoint" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:serviceSet" minOccurs="1" maxOccurs="1"/>
  </xs:sequence>
</xs:complexType>
[ top ]
Complex Type bdems:ServiceSet.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Annotations

umldocumentation

The ServiceSet complexType is the container for all of the servcice operations. There is a separate sub-container for the information about each operation. The order of this information is unimportant because it is not used to organize how the data file is interpreted.
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#serviceRecord
Properties
mixed: false
Used by
Model bdems:serviceRecord+
Children bdems:serviceRecord
Source
<xs:complexType name="ServiceSet.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The ServiceSet complexType is the container for all of the servcice operations. There is a separate sub-container for the information about each operation. The order of this information is unimportant because it is not used to organize how the data file is interpreted.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element ref="bdems:serviceRecord" minOccurs="1" maxOccurs="unbounded"/>
  </xs:sequence>
</xs:complexType>
[ top ]
Complex Type bdems:ServiceRecord.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Annotations

umldocumentation

The ServiceRecord complexType is the container for the information about a single service and interface combination.
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#serviceName BulkDataExchangeManagementServiceSyncXSD.tmp#interfaceName BulkDataExchangeManagementServiceSyncXSD.tmp#operationSet
Properties
mixed: false
Used by
Model bdems:serviceName , bdems:interfaceName , bdems:operationSet
Children bdems:interfaceName, bdems:operationSet, bdems:serviceName
Source
<xs:complexType name="ServiceRecord.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The ServiceRecord complexType is the container for the information about a single service and interface combination.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element ref="bdems:serviceName" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:interfaceName" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:operationSet" minOccurs="1" maxOccurs="1"/>
  </xs:sequence>
</xs:complexType>
[ top ]
Complex Type bdems:OperationSet.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Annotations

umldocumentation

The OperationSet data-type is the container for the set of named operations that must be supported for the successful completion of the data file read.
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#operationName
Properties
mixed: false
Used by
Model bdems:operationName+
Children bdems:operationName
Source
<xs:complexType name="OperationSet.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The OperationSet data-type is the container for the set of named operations that must be supported for the successful completion of the data file read.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element ref="bdems:operationName" minOccurs="1" maxOccurs="unbounded"/>
  </xs:sequence>
</xs:complexType>
[ top ]
Complex Type bdems:BulkBlockManifest.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Annotations

umldocumentation

The BulkBlockManifest complexType is the container for all of the information that describes the data to be found in the external bulk data files. This is a manifest for the set of external files i.e. the bulk block data can be stored in more than one file. A unique bulkBlockManifest identifier is also included.
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#bulkBlockManifestId BulkDataExchangeManagementServiceSyncXSD.tmp#expiryDate BulkDataExchangeManagementServiceSyncXSD.tmp#bulkBlockDataFile
Properties
mixed: false
Used by
Model bdems:bulkBlockManifestId , bdems:expiryDate , bdems:bulkBlockDataFile+
Children bdems:bulkBlockDataFile, bdems:bulkBlockManifestId, bdems:expiryDate
Source
<xs:complexType name="BulkBlockManifest.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The BulkBlockManifest complexType is the container for all of the information that describes the data to be found in the external bulk data files. This is a manifest for the set of external files i.e. the bulk block data can be stored in more than one file. A unique bulkBlockManifest identifier is also included.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element ref="bdems:bulkBlockManifestId" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:expiryDate" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:bulkBlockDataFile" minOccurs="1" maxOccurs="unbounded"/>
  </xs:sequence>
</xs:complexType>
[ top ]
Complex Type bdems:BulkBlockReport.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Annotations

umldocumentation

The BulkBlockReport complexType is the container for the information reported back about the processing of the set of data files. This report consists of a summary of all of the transaction status codes and details for those requests that have failed.
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#bulkBlockManifestIdRef BulkDataExchangeManagementServiceSyncXSD.tmp#reportSummary BulkDataExchangeManagementServiceSyncXSD.tmp#transactionReport
Properties
mixed: false
Used by
Model bdems:bulkBlockManifestIdRef , bdems:reportSummary , bdems:transactionReport*
Children bdems:bulkBlockManifestIdRef, bdems:reportSummary, bdems:transactionReport
Source
<xs:complexType name="BulkBlockReport.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The BulkBlockReport complexType is the container for the information reported back about the processing of the set of data files. This report consists of a summary of all of the transaction status codes and details for those requests that have failed.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element ref="bdems:bulkBlockManifestIdRef" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:reportSummary" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:transactionReport" minOccurs="0" maxOccurs="unbounded"/>
  </xs:sequence>
</xs:complexType>
[ top ]
Complex Type bdems:ReportSummary.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Annotations

umldocumentation

The ReportSummary complexType is the container for the report summary information. This contains a summary for the set of services as a whole and for each specific service.
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#noofTotalFullSuccess BulkDataExchangeManagementServiceSyncXSD.tmp#noofTotalPartialSuccess BulkDataExchangeManagementServiceSyncXSD.tmp#noofTotalFailure BulkDataExchangeManagementServiceSyncXSD.tmp#interfaceSummaryReport
Properties
mixed: false
Used by
Model bdems:noofTotalFullSuccess , bdems:noofTotalPartialSuccess , bdems:noofTotalFailure , bdems:interfaceSummaryReport*
Children bdems:interfaceSummaryReport, bdems:noofTotalFailure, bdems:noofTotalFullSuccess, bdems:noofTotalPartialSuccess
Source
<xs:complexType name="ReportSummary.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The ReportSummary complexType is the container for the report summary information. This contains a summary for the set of services as a whole and for each specific service.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element ref="bdems:noofTotalFullSuccess" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:noofTotalPartialSuccess" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:noofTotalFailure" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:interfaceSummaryReport" minOccurs="0" maxOccurs="unbounded"/>
  </xs:sequence>
</xs:complexType>
[ top ]
Complex Type bdems:InterfaceSummaryReport.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Annotations

umldocumentation

The InterfaceSummaryReport complexType is the container for the report details for a specific interface.
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#interfaceName BulkDataExchangeManagementServiceSyncXSD.tmp#noofFullSuccess BulkDataExchangeManagementServiceSyncXSD.tmp#noofPartialSuccess BulkDataExchangeManagementServiceSyncXSD.tmp#noofFailure
Properties
mixed: false
Used by
Model bdems:interfaceName , bdems:noofFullSuccess , bdems:noofPartialSuccess , bdems:noofFailure
Children bdems:interfaceName, bdems:noofFailure, bdems:noofFullSuccess, bdems:noofPartialSuccess
Source
<xs:complexType name="InterfaceSummaryReport.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The InterfaceSummaryReport complexType is the container for the report details for a specific interface.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element ref="bdems:interfaceName" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:noofFullSuccess" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:noofPartialSuccess" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:noofFailure" minOccurs="1" maxOccurs="1"/>
  </xs:sequence>
</xs:complexType>
[ top ]
Complex Type bdems:ReportFailureDetail.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Annotations

umldocumentation

The ReportFailureDetail complexType is the container for the set of failure reports.
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#failureReport
Properties
mixed: false
Used by
Model bdems:failureReport+
Children bdems:failureReport
Source
<xs:complexType name="ReportFailureDetail.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The ReportFailureDetail complexType is the container for the set of failure reports.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element ref="bdems:failureReport" minOccurs="1" maxOccurs="unbounded"/>
  </xs:sequence>
</xs:complexType>
[ top ]
Complex Type bdems:FailureReport.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Annotations

umldocumentation

The FailureReport complexType is the container for the failure report data provided as part of the announceFailureBulkDataExchange operation.
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#failureReportVocabulary BulkDataExchangeManagementServiceSyncXSD.tmp#failureCode BulkDataExchangeManagementServiceSyncXSD.tmp#failureDescription
Properties
mixed: false
Used by
Model bdems:failureReportVocabulary , bdems:failureCode , bdems:failureDescription
Children bdems:failureCode, bdems:failureDescription, bdems:failureReportVocabulary
Source
<xs:complexType name="FailureReport.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The FailureReport complexType is the container for the failure report data provided as part of the announceFailureBulkDataExchange operation.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element ref="bdems:failureReportVocabulary" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:failureCode" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:failureDescription" minOccurs="1" maxOccurs="1"/>
  </xs:sequence>
</xs:complexType>
[ top ]
Complex Type bdems:FilterObject.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Annotations

umldocumentation

The FilterObject complexType is the container for the set of filtering rules supplied as a part of the requestBulkDataExchange operation.
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#filterRule
Properties
mixed: false
Used by
Element bdems:filter
Model bdems:filterRule+
Children bdems:filterRule
Source
<xs:complexType name="FilterObject.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The FilterObject complexType is the container for the set of filtering rules supplied as a part of the requestBulkDataExchange operation.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element ref="bdems:filterRule" minOccurs="1" maxOccurs="unbounded"/>
  </xs:sequence>
</xs:complexType>
[ top ]
Complex Type bdems:FilterRule.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Annotations

umldocumentation

The FilterRule complexType is the container for a rule that is to be applied.
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#filterTypeVocabulary BulkDataExchangeManagementServiceSyncXSD.tmp#filterType BulkDataExchangeManagementServiceSyncXSD.tmp#filterValueVocabulary BulkDataExchangeManagementServiceSyncXSD.tmp#filterValue
Properties
mixed: false
Used by
Model bdems:filterTypeVocabulary , bdems:filterType , bdems:filterValueVocabulary{0,1} , bdems:filterValue
Children bdems:filterType, bdems:filterTypeVocabulary, bdems:filterValue, bdems:filterValueVocabulary
Source
<xs:complexType name="FilterRule.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The FilterRule complexType is the container for a rule that is to be applied.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element ref="bdems:filterTypeVocabulary" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:filterType" minOccurs="1" maxOccurs="1"/>
    <xs:element ref="bdems:filterValueVocabulary" minOccurs="0" maxOccurs="1"/>
    <xs:element ref="bdems:filterValue" minOccurs="1" maxOccurs="1"/>
  </xs:sequence>
</xs:complexType>
[ top ]
Complex Type bdems:GroupInterfaceOperations.Type
Namespace http://www.imsglobal.org/services/lis/bdems1p0/xsd/imsbdems_v1p0
Annotations

umldocumentation

The GroupInterfaceOperations complexType is the container for the list of operations supported for the GMS Group manager interface.
Diagram
Diagram BulkDataExchangeManagementServiceSyncXSD.tmp#operationName
Properties
mixed: false
Used by
Model bdems:operationName+
Children bdems:operationName
Source
<xs:complexType name="GroupInterfaceOperations.Type" mixed="false">
  <xs:annotation>
    <xs:documentation source="umldocumentation">The GroupInterfaceOperations complexType is the container for the list of operations supported for the GMS Group manager interface.</xs:documentation>
  </xs:annotation>
  <xs:sequence>
    <xs:element ref="bdems:operationName" minOccurs="1" maxOccurs="unbounded"/>
  </xs:sequence>
</xs:complexType>
[ top ]
Complex Type bdems:imsx_CodeMinor.Type